Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2nd E Bid Results 07112018
Bid 1.1 (145 pcd)(For Street 4"and ITONI 10000 Catch Basica to iudude Piping and 8" Watm Maio Hot Tap & Valve 8"WatmM Line I Addmdum No. HK Tronmted Domes EA 6 202.4.1 A1& 6' Exmvation. gmulm badddl& SY 2150 2W46A1 compaction for sidew $22.50 56075000 70641E1 Comae Sidew Installation SY 2150 706.4.1 A7 Cmb& Outten Installation LF 3300 HK Depatco Um Bid Pxice Bid Amowd Um Bid Pxice Bid Amnoot $750 531125000 $1655 $ 68482500 $22.50 56075000 $31.57 $ 8523900 $11200 11,120000.00 $9800 $ 98g000D0 55500 $3850000 $6652 $ 46.564.00 4600 $6500000 $4343 $ 10857500 sl 00000 $1.00000 $245000 $ 245000 sls0000 $300000 $145000 $ 2 900 00 ss5000 $2550000 $102500 $ 3075000 572500 $580000 $ 75000 $ 600000 S9s0000 $7600000 $1290000 $ 10320000 520000 $2750000 $684500 $ 7529500 6300000 $3,000.00 $5.77500 $ 5.77500 56500 $5,85000 $192.50 $ 1732500 $18500.00 $18,500.00 $28,02500 $ 28,02500 $200000 $12,000.00 $1.51600 $ 9,096.00 x1500 $3225000 $29.56 $ 63,55400 $5000 $10750000 $6500 $ 139.75000 $2000 $6600000 $35.10 $ 115,83000 TOTAL $1.97940000 TOTAL $2.507.15300