HomeMy WebLinkAboutAPPLICATION - 18-00358 - W 1/2 of Block 7 - CUP DormitoryConditional Use Permit
Submit by�E-mail
( j� City of Rexburg
35 No Y )ji E� Q E B V E � Phone: 208.359.3020
Rexbu ✓ 440 www.rexb-010 d Fox: 208.359.3022
Applicant
Name: Graeme Reel
City: Dallas
JUN 2 8 2018
awes
of �' CI7 T OF
Fi y
REXBURG
--
Amai.'s family Camrdu oty
Fee(s) Paid: Yes/No CUP: $250.00
Publication: $200.00
ITY OF REMURG 1 $450.00
Address: 14850 Montfort Dr. Suite 185
State: Texas Zip: 75254 Phone: (214) 272-9790
Owner (Complete if owner not applicant)
Name: Lawrence Reel
Address: 1100 Quall St. suite 203
Cite: Newport Beach State: California
Property to be Covered by Permit:
Address: See attached
FKI-i- 7
Phone: (949) 250-4245
Zone: High Density Residential 2
Legal Description of the property (Lot, Block, Addition, Division Number)
The property is a portion of Lots 2 and 3. Block 7 of the Southend Addition to
*Please attach a site plan (11"x17") drawn to scale and a viclnitymap of the property to this application.
Nature of Request (Briefly explain the proposed use)
Student housing.
The proposed project will be for Dormitory style housing for BYU-I approved housing.
Existing use of property: Currently used for residential primarily rental property
Will this have an Impact on schools: No. This project will be for BYU-1 approved single student housing.
1
Requirements for Granting Conditional Use Permit
The following information will assist the Commission and City Council to determine if your proposal will meet the
requirements under the zoning ordinance.
1. What is the estimated water usage per month? Are the existing mains adequate to provide fire protection?
Estimated 42,000 Gal/day, Owners have discussed the need for water main upgrade on 3rd West
2. What is the estimated sewer usage per month? Will pretreatment be necessary?
Estimated 40,800 Gagday, , Pretreatment will not be necessary.
3. What is the estimated daily traffic to be generated? Will the traffic be primarily private vehicles or commercial
trucks? Primarily passenger vehicles. PM peak estimated at 54 trips, daily trips estimated at 718 trips
4. If commercial, industrial, or a home occupation, what will be the hours of operation? N/A
5. Will storm water drainage be retained on site? Is an existing storm drain available? Is it at capacity? If so, will
new facilities be constructed? storm water drainage will be retained on site. Existing storm drain is available.
Yes, it is at capacity, and new facilitates on site will be constructed.
6. If proposed use is residential, describe number and type of dwelling units. Will this be student housing: multi-
family for young families, singles and couples, or elderly? Single student housing with 33 two-
bedroom units, 55 three-bedroom units, and 48 four-bedroom units. Total of 134 units between two buildinas.
7. What provision has been made for fire protection? Where is the nearest fire hydrant? Is any point of the
building further than 150 feet from access sufficient in width for fire fighting equipment?
Fre suppression system will be incorporated. There is a fire hydrant on the south-east comer of 3rd South and 3rd West and another fire hydrant on the
south-west comer of 3rd West and 2nd South. Additional hydrants may be added as needed with the project.
8. How much parking is being provided on-site? Do the aisle widths and access points comply with the ordinance
requirements? Has landscaping been provided in accordance with the ordinance?
75% parking will be built for approximately 808 residents.
9. Where will solid waste generated be stored? Is access adequate for the City collection? oumpstere will be
provided and access given to city collection.
10. What is the type of noise that will be generated by the use? What are the hours of noise generation?
No more noise will be generated above and beyond that which is typical to dormitory housing.
11. What type of equipment will be used in the conduct of the business?
Limited equipment for the use of maintenance of the building and the grounds.
12. What are the surrounding land uses? Has buffering been provided as required by the ordinance?
The o0rer hall of the Mock is mixed use with a mix of dormitory style housing and commercial. Required buffering will be provided.
13. Are any air quality permits required? Is dirt or other dust creating materials moved by open trucks or box cars?
No.
14. Will the parking lots or other outdoor areas have lighting? Yes, parking will be in a padCarg garage.
15. Are passenger loading zones for such uses as daycare centers and schools provided? How is busing routed? For
commercial uses, where are the loading docks? Is there sufficient space for truck parking?
NIA
16. If a commercial, multi -family, or public assembly use, where is the nearest collector street? Arterial street?
This project she on 2nd south and 3rd west which are local collectors, and is 2 Mocks south of Main Street which is an Arterial street.
17. What, if any, signage is anticipated in connection with the proposed usage?
Apartment name will likely appear on the building, no other signage is anticipated.
The P&Z Commission or City Council may address other points than those discussed above, but a narrative
addressing at least those applicable points will assist in processing your application.
A PIAT (SITE) PLAN MUST BE ATTACHED IN ORDER TO PROCESS THIS APPLICATION. Included
on the plot plan please show setbacks, buildings, parking, etc.
• Please submit 18 copies of the completed application and any other documents you are submitting with it
(site plan, vicinity map, affidavit of legal interest, etc.)
• All applications that are complete will be processed with due diligence and will be scheduled, dependent
upon availability, for an upcoming agenda.
• Formal notice will be sent to the applicant after approval of a Conditional Use Permit. Notice will state the
conditions of the permit. If conditions are violated or not met there will be a 90 day period to cure the
problem. Failure to comply with the terms may result in revocation of the Conditional Use Permit.
Z<45 ,/ \ - June 28, 2018
Signature -4 Applit Date
LEGAL DESCRIPTION
RAEL STUDENT HOUSING PROPERTY
A parcel of land being a portion of Lots 2 and 3, Block 7, of the Southend Addition to
Rexburg, lying entirely within the Southeast One -Quarter of the Northwest One -Quarter of
Section 30, Township 6 North, Range 40 East of the Boise Meridian, City of Rexburg, Madison
County, Idaho, and being more particularly described as follows:
BEGINNING at the NW comer of said Block 7, also being the NW comer of Lot 2;
Thence East along the South right-of-way line of 2nd South Street, a 99 -foot wide public
street, a distance of 214.50 feet;
Thence along the following nine courses:
1. South a distance of 234.00 feet;
2. West a distance of 53.62 feet;
3. North a distance of 3.00 feet;
4. West a distance of 53.63 feet;
5. South a distance of 99.00 feet;
6. East a distance of 122.75 feet;
7. South a distance of 132.00 feet;
8. East a distance of 100.00 feet;
9. South a distance of 198.00 feet to the SE comer of said Lot 3, Block 7;
Thence West along the North right-of-way line of 3.d South Street, a 99 -foot wide public
street, a distance of 330.00 to the SW corner of said Lot 3;
Thence North along the East right-of-way line of 31 West Street, a 99 -foot wide public
street, a distance of 660.00 feet to the POINT OF BEGINNING;
Containing 152,028 square feet, or 3.49 acres, more or less.
Prepared by:
Richard B. Byrem, Idaho PLS 7381
Forsgren Associates, Inc.
350 North 2"d East, Rexburg, ID 83440
(208)356-9201