Loading...
HomeMy WebLinkAboutAPPLICATION - 18-00354 - 261 N 1st E - Rexburg Storage UnitsC I T Y O F REXBURG 00. America's Family Community Building Safety Department COMMERCIAL AVNtICATION CHECKLIST City of Rexburg 35 North 1St East Rexburg, Idaho 83440 The following items should be completed before you submit your building permit application. *Reasonable accommodations will be made upon request. Submit the Following Documents: ❑ 3 sets of site plans drawn to scale (see Site Plan Checklist) ❑ 3 sets of building plans (see box below to right) -stamped by a licensed professional. Include the following as applicable ❑ Foundation Plan, Floor Joist Layout, Floor Plan, Roof Layout, Truss Details, Sectional Views, Front, Back, and Side Elevations, Mechanical Layout, Stair Details, and any details required to illustrate special construction. ❑ Electrical panel layout and calculations included with building plans. ❑ Exterior Lighting Plan including photometric layout. Structural Calculations (see box below) - stamped by a licensed Engineer t Energy Compliance Report: As per the 20151 CC, a COMCheck is required (available online at www.energvcodes gov) ❑ Digital Plans (PDF Format - can be submitted by USB, CD, or Dropbox) t **Copies of any Contractors' State License if not on file already. Complete the Following Forms Frost Depth - 36" ❑ Site Plan Checklist Permit Policies Acknowledgment signed !� Property Line form signed Building Permit Application signed by a registered General Contractor *i Mechanical Permit Application signed by a registered Mechanical Contractor ❑ Electrical Permit Application signed by a licensed Electrical Contractor ❑ Plumbing Permit Application signed by a licensed Plumbing Contractor Fire Alarm Permit Application (if applicable) signed by a registered professional TFire Sprinkler Permit Application (if applicable) signed by a registered professional e Subcontractor list filled out 1 Affidavit of Legal Interest signed by owner IV Notifications Distribution List WBusiness Use Summary Completed Subdivisions: If you plan to build in a subdivision please check the Rexburg Development Code for any requirements such as property setbacks, architecture board approval, etc. This information is available at htto://rexburg.org/paaes-/development-code. Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341 Revised 10/2016 C1 TY O F REXBURG na, Americas Family Community SITE PLAN CHECKLIST Community Development Department City of Rexburg 35 North 1St East Rexburg, Idaho 83440 ❑ 1. Legal Description of proposed building site 1:12. North Arrow 113. Drawn to scale ❑ 4. Lot Dimensions ❑ 5. Building locations, and dimensions with distance to property lines and distances between buildings ❑ 6. Distance of entrances from street corners dimensioned ❑ 7. Show 10% snow storage area ❑ 8. Drainage Plan (with arrows) ❑ 9. Fencing/Screening ❑ 10. Landscaping/Buffering ❑ 11. Lighting Plan (if needed) 1112. Existing and proposed easements ❑ 13. Existing utilities (waterlines, sanitary sewer lines, manholes, storm drains) ❑ 14. Existing right-of-way location and width, curb to curb widths ❑ 15. Existing streets labeled ❑ 16. Proposed street improvements (curb, gutter, sidewalk, pavement, etc.) ❑ 17. Parking (Lot dimensions, distance between rows, loading areas if required) 1118. Sidewalks - both along rights-of-way and internal (existing and proposed) 1319. Fire hydrants and fire suppression lines (including tie to City lines) o Sprinkled o Not Sprinkled [120. Fire apparatus access ❑ 21. Proposed utilities including tie in location to existing services and new easements 1322. Proposed storm drain and sanitary sewer elevations (for pipe inverts at manholes and catch basins) [:123. Trash facilities (dumpsters for right-hand truck) 0 1 Dumpster per 20 doors (non -dormitory) 0 1 Dumpster per 50 beds (dormitory) 1:124. Numbers needed: o Building square footage o Percent of lot covered by building o Paving Area o Drainage Plan Calculations o Parking space numbers (tenant & visitor, handicap, private) SITE PLANS MUST BE COMPLETE AND SUBMITTED FOR REVIEW BEFORE THE PROJECT WILL BE PLACED ON THE PLANNING & ZONING AGENDA. Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 359.3020 Revised 3/2018 CITY OF REXBURG America' Famity Community PERMIT POLICIES ACKNOWLEDGMENT Building Safety Department City of Rexburg 35 North 1St East Rexburg, Idaho 83440 The City of Rexburg Building Safety Department is determined to provide excellent customer service. In an effort to help you understand the City of Rexburg Permit Policies, listed below are several policies which you are required to know prior to proceeding with your project. o APPROVAL OF CONSTRUCTION. Construction on any project can begin ONLY when you have received a Pink Building Permit from the Building Department. Occupancy of any structure can begin ONLY when you have received an official nitia�s Certificate of Occupancy from the Building Department. These documents must be signed by the appropriate authorities from the City of Rexburg. Any approvals can be verified by calling (2 08) 372-2167. Even if you hear from an inspector that `you're good to go', ultimately if you do not have a Building Permit or Certificate of Occupancy, the above policies will be enforced. o SCHEDULING INSPECTIONS. Scheduling inspections is the responsibility of the applicant and their contractor. Inspections need to be called into the hotline and not to the inspector. Inspections called in later than 8 AM will be scheduled for the nitia�s following business day. If an inspection is not done, the inspector may require any measures to be taken to allow him to correctly perform the inspection. (Example: If the electrical rough in inspection is not done and the sheetrock has been put up, the inspector may require the sheetrock to be removed in order to perform the electrical rough in inspection.) o STAIRWAYS REQUIRED. On jobsites for multi-level buildings the contractor must provide temporary stairs so that workers and inspectors can safely access upper levels of the building. If these stairs are not provided, inspections may nitials not be completed. Extenuating circumstances will need to be approved by the Building Department. DIGITAL AS -BUILT PLANS. A Certificate of Occupancy will not be issued without digital copies of the As -Built Plans. It is the Applicant's responsibility to turn in digital copies of the As -Built Plans when the project is completed. No Certificate of Initials Occupancy will be issued without these plans, extenuating circumstances will need to be approved by the Building Department. o OCCUPYING A FINISHED BUILDING. No building may be occupied without receiving a signed Certificate of Occupancy. If a building is occupied without receiving a signed Certificate of Occupancy, citations may be issued and the occupants may nitials be required to vacate. o MAKING KNOWN POLICIES. It is your responsibility to inform anyone on your project of the above policies. All sub- contractors will be held to this standard with no exceptions. The above policies will be enforced to all, regardless if this nitia�s information is passed on to them or not. Applicant's Name (print) Signature: Date: Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day. Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341 Revised 10/2016 CITY OF REXBURG America's Family Community PROPERTY LINES Building Safety Department City of Rexburg 35 North 1St East Rexburg. Idahn gU4f1 Each site plan that is submitted to the City of Rexburg for the Building Permit process requires that property lines are shown accurately. It is the Developer's responsibility to correctly identify on the site plan the location of these lines in reference to the public right-of-way, other adjoining property lines, the street, other structures and all utility lines. The Developer should find property pins that are still available at the lot in question. If these pins do not exist or have become unrecognizable then a new survey should be performed. Accurate property line information is a must for a timely review. In addition to finding existing property pins, legal descriptions should be checked. The best way to identify property line location is with a land survey. The City of Rexburg has aerial photos and a parcel line layer that can be checked, but they are only a tool and are not guaranteed for accuracy. If you want to request a copy of your lot, see the front counter at the Community Development Department. I have read and understand the above requirements. 71-Ua6t�� Signature 1 0 Vt ! J Dat Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341 Revised 10/2016 C1 TY O F REXBURG America's Family Community BUILDING PERMIT FORM 2�0 Updated 03/2017 BUILDING APPLICATION New Commercial Building Building Safety Department City of Rexburg 35 North 1St East Rexburg, Idaho 83440 For Office Use Permit Number: Zoning: Application Fee: ❑ $1000/Building 1. Propc4 Ow ler Name: Q �(�jQ Address: O City: State: • Zip CodeO' > l Z� Phone: ail: 2. Applican Name: �V Role: (Owner, Tenant, Contractor, etc.) Address: City: State: Zip Code: Phone: Email: Contact/Rep. Name: 3. General Contractor Under Idaho Building Code, a registered contractor must do the work for a Commercial Building, Name: STOIT,--(2C-6�G egistration #: Exp.: Address: ,o City: Statq_ Zip Code: Phone: 3 S 3 mail: arr»�e{a���• ,Qti Contact/Rep. Name: Phone: Email: General Contractor Authorized Signature: Date: A copy ofyour state registration/license is required to be on file. If this is the first time you have done work in the City of Rexburg, please provide a photo copy ofyour license. Ifyou are unsure ifyour license is on file, please check with the Permit Technician by calling (208) 372-2341. 4. Project Description • Address:LL9 �e. -OR- Lot #: Block #: _ Subdivision: • Project Name: • Construction Type • Occupancy Type: • Square footage: 000 ��� Total costof -mat rials and labor: $ Z.50T_ • V ck all disciplines that apply: ;_–., �e^' ^��^^I• Cost $*_ � Electrical: Cost $ Plumbing: Cost $ Cost $ 1Q, mire 913 ; Cost $ Note: Any contractors involved will need to fill out their respective pplication. • # of Water Meters: • W, • # of Parking Stalls: Water Meter Size(s): 3 • # of Dumpsters: • Estimated Dumpster Delivery • # of Dumpster Pickups/week Date: _ • Other Comments (if any): Building Permit fees for commercial construction are charged based on square footage and the City's estimated valuation. The application fee applies toward the fee total. For details on how fees are calculated, contact the Building Department. There will also be a plan review fee totaling 10% of the building permit fee. APPLICANT'S SIGNATURE, CERTIFICATION AND AUTHORIZATION: Under penalty of perjury, I hereby certify that I have read this application and state that the information herein is correct and I swear that any information which may hereafter be given by mein hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg shall be truthful and correct. I agree to comply with all City regulations and State laws relating to the subject matter of this application and hereby authorized representatives of the City to enter upon the above-mentioned property for inspections purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2012 International Code in cases of any false statement or misrepresentation of fact in the application or on the plans on which the permit or approval was based. Permit void if not started within 180 days. Permit void if work stops for 180 days. Applicant's Name (print):+7�k� — Signature: Date: Q Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day. Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341 C1 TY OF R.EXBURG America's Family Community BUILDING PERMIT FORM 2 2 Updated 03/2018 BUILDING APPLICATION Commercial Electrical Building Safety Department City of Rexburg 35 North 1St East Rexburg. Idaho 83440 For Office Use Permit Number: Electrical Fees Paid ❑ 1. Property Ow er Name: Address: City: State: Zip Code: Phone: Email: 2. Electrical Contractor Under Idaho Building Code, a registered contractor must do the work for a Commercial Building. Business: State License #: Exp.: Address: City: State: _ Zip Code: Phone: Email: Contact/Rep. Name: Phone: Email: Electrical Contractor Authorized Signature: Date: A copy ofyourstate registration/license is required to be on file. If this is the first timeyou have done work in the City of Rexburg, please provide a photo copy ofyour license. Ifyou are unsure ifyour license is on file, please check with the Permit Technician by calling (208) 372-2341. 3. Project Description �4 Address: Z N • %�. De,�cription of work: Project Cost: $ aere wui also ne a pian review jee totaling 10% of the above fee. — ..._...,.. II I —, SEN Ir1WA I IU IN AIN U AU I HOKIZA"IION: Under penalty of perjury, I hereby certify that I have read this application and state that the information herein is correct and I swear that any information which may hereafter be given by mein hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg shall be truthful and correct. I agree to comply with all City regulations and State laws relating to the subject matter of this application and hereby authorized representatives of the City to enter upon the above-mentioned property for inspections purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2012 International Code in cases of any false statement or misrepresentation of fact in the application or on the plans on which the permit or approval was based. Permit void if not started within 180 days. Permit void if work stops for 180 days. Applicant's Name (print): Signature: Date: Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day. Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341 Cost of project: Calculation for inspection fee: If project cost is between $0 to $10,000 then: (Cost of project *2%) + $60 If project cost is between $10,001 to $100, 000 then: ((Cost of project - $10,000) * _1%) + $260 If project cost is greater than $100,001 then: ((Cost of project - $100, 000) * MVo) + $1160 aere wui also ne a pian review jee totaling 10% of the above fee. — ..._...,.. II I —, SEN Ir1WA I IU IN AIN U AU I HOKIZA"IION: Under penalty of perjury, I hereby certify that I have read this application and state that the information herein is correct and I swear that any information which may hereafter be given by mein hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg shall be truthful and correct. I agree to comply with all City regulations and State laws relating to the subject matter of this application and hereby authorized representatives of the City to enter upon the above-mentioned property for inspections purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2012 International Code in cases of any false statement or misrepresentation of fact in the application or on the plans on which the permit or approval was based. Permit void if not started within 180 days. Permit void if work stops for 180 days. Applicant's Name (print): Signature: Date: Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day. Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341 oQ�rxavR� v� dx CITY o f Building Safety Department ° REXBURG BUILDING PERMIT FORM 230 City of Rexburg Updated 03/Z018 35 North 15t East America's Family Community Rexburg, Idaho 83440 BUILDING APPLICATION Commercial Plumbing For Office Use Permit Number: 1. Property Owner Name: _ Address: City: Phone: Email: Plumbing Fees Paid ❑ State: _ Zip Code: 2. Plumbing Contractor Under Idaho Building Code, a registered contractor must do the work for a Commercial Building. Business: State License #: Exp.: Address: Phone: Contact/Rep. Name: City: Email: Phone: State: _ Zip Code: Email: Plumbing Contractor Authorized Signature: Date: A copy ofyour state registration/license is required to be on file. If this is the first time you have done work in the City of Rexburg, please provide a photo copy ofyour license. Ifyou are unsure ifyour license is on file, please check with the Permit Technician by calling (208) 372-2341. 3. Project Description Address: 7-4n Vcription of work: i Project Cost: $ ap9p Cost of project: Calculation for inspection fee: If project cost is between $0 to $10,000 then: (Cost of project *2%) + $60 If project cost is between $10,001 to $100,000 then: ((Cost of project - $10,000) * 1 %) + $260 If project cost is greater than $100,001 then: ((Cost of project - $100,000) * 112%) + $1160 An aaanaonal pian review fee is required which is 10% of the calculated inspection fee .... --- —I I--1 —11 HtvU HU I HUK16H1 lu1V: Unger penalty of perjury, 1 hereby certify that 1 have read this application and state that the information herein is correct and I swear that any information which may hereafter be given by mein hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg shall be truthful and correct. I agree to comply with all City regulations and State laws relating to the subject matter of this application and hereby authorized representatives of the City to enter upon the above-mentioned property for inspections purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2012 International Code in cases of any false statement or misrepresentation of fact in the application or on the plans on which the permit or approval was based. Permit void if not started within 180 days. Permit void if work stops for 180 days. Applicant's Name (print): Signature: Date: Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day. Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341 CITY OF REXI3URG America's Family Community SUBCONTRACTOR LIST Excavation & Earthwork: Concrete: Masonry: Roofing: �A.�'O►r��$ Insulation: Drywall: I NO Painting: WI Floor Coverings: Plumbing: Heating: Electrical: Special Construction (Manufacturer or Supplier) Roof Trusses: Floor/Ceiling Joists: Siding/Exterior Trim: Other: Building Safety Department City of Rexburg 35 North 1St East Rexburg, Idaho 83440 Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341 Revised 10/2016 OQ VL' B U,RG r7 CITY O F ° REXBURG cv, America's Family Community DISTRIBUTION LIST Building Safety Department City of Rexburg 35 North 1St East Rexburg, Idaho 83440 Please provide the names and emails of anyone who should begetting automated updates for this project; I' eview Notes r maili Name: Email: Name: Email: Name: Email: Name: Email: Inspection Tickets Name: SAM,izh6a, Email: Name: Email: Name: Email: Name: Email: Name: Email: Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341 Revised 10/2016