Loading...
HomeMy WebLinkAbout18-00275 Staff Review SummaryCity Staff Review Summary Application Status: Review Application Number: 18-00275 Land Use - Conditional Use Permit Applicant Details 261 N 1st E - Storage Units Application Reviewed Date: 05/23/2018 Applicant: Tyler Peterson Address: 261 N 1st E Property Owner , Property Details PROPERTY ID LOCATION RPR0000015001B 261 N 1st E Parcel Size : Authority § 6.13 (E) "The Commission may recommend that the amendment be granted as requested, that it be modified, or that it be denied" City Staff Reviews COMPLETED 05/29/2018GIS-Boundary Review RESUBMIT 06/07/2018PZ-Neighboring/Similar Projects Review * Is the extent and nature of the amendment requested clearly described? A CUP request for storage sheds in a Mixed Use zone should be accompanied by elevation plans that would identify how the Design Standards of Section 4.7 are met. If the applicant is requesting to bring the building out to the street then the requirements 0f 3.14.100 should be identified. * Is the proposed change compatible with the surrounding area and zoning? Consideration should be taken for the redevelopment of the storage sheds to the north of this property as well as the sheds to the south. * Have any recent changes in land use on adjoining properties or in the neighborhood of the map revision been identified? A multi-family housing projects was recently completed to the north of this property. COMPLETED 06/14/2018PW-Supporting Infrastructure Review * Can storm drainage requirements be addressed? All storm drainage will have to be handled on site. RESUBMIT 06/14/2018PZ-Neighboring/Similar Projects Review * Is the extent and nature of the amendment requested clearly described? A CUP request for storage sheds in a Mixed Use zone should be accompanied by elevation plans that would identify how the Design Standards of Section 4.7 are met. If the applicant is requesting to bring the building out to the street then the requirements 0f 3.14.100 should be identified. 6/14/18 Re-review: 1. Section 3.14.100 a. A landscape plan is required that idenitifies the placement and type of trees, bushes flowers, etc. An irragation system is required and should be identified on plans. b. "Elements that break up vertical and horizontal walls" are not provided. Page 1 of 2Report Date: 06/14/2018 4:46 pm City Staff Review Summary Application Status: Review Application Number: 18-00275 Land Use - Conditional Use Permit City Staff Reviews c. "High quality materials" are required on the wall facing the street. 2. Section 3.14.160 and Section 4.7. a. The wall facing the street is longer than 60' and does not have "a recession or recess" as per this section. b. "Animating features such as arcades, display windows, entry areas, or awnings" shall be "along 60% of the facade". c. "e. Entryways" "Each principal building on a site shall have clearly defined, highly visible customer entrances featuring no less than three of the following: i. canopies or porticos ii. overhangs iii. recesses/projections iv. arcades v. raised corniced parapets over door vi. peaked roof forms vii. arches viii. outdoor patios ix. display windows x. architectural details such as ...... xi. integral planters or windwalls that... d. Provide "Central Feature" as per this section. If this list seems extensive or the location does not make sense to put this type of investment into this building, then the question arrises that maybe the zone should be changed back to Light Industrial. With the investment that was put into the new apartment complex to the north and the time and effort that was put into changing the zone to Mixed Use, Staff feels that the storage units surrounding this building would eventually be taken down for more apartments or ixed use. Therefore this project should be constructed in a manner as to not deter to the redevelopment of the area. * Is the proposed change compatible with the surrounding area and zoning? Consideration should be taken for the redevelopment of the storage sheds to the north of this property as well as the sheds to the south. * Have any recent changes in land use on adjoining properties or in the neighborhood of the map revision been identified? A multi-family housing projects was recently completed to the north of this property. Page 2 of 2Report Date: 06/14/2018 4:46 pm