Loading...
HomeMy WebLinkAboutConcise Bid Proposal from Depatco for 5th W Reconstruction Bid Total 8,840.001,350.005,840.009,700.001,275.008,370.001,720.004,760.002,450.004,000.001,440.00 61,225.0064,925.0027,840.0071,640.00890.00580.0050,600.0015,990.0028,350.0013,200.0043,725.00400.0024,885.00$453,995.00 Unit Price 15.5024.5048.0089.551,350.001,460.004,725.001,275.0016.0053.0023.7034.0015.00 1.70890.00580.0012,650.00194.00399.75930.00430.00200.00350.000.50 Units LSLSLSLFLFLFSFLF========> CYSYCYCYSYSYCY TONEAEAEAEAEAEAEAEA Bid Total Quantity3,950.0005,200.0002,650.000580.000800.0001.0001.0001.0004.0004.00050.00040.0006.0001.0009.0004.000825.000825.0002.0001,050.000140.0007.0008,000.00096.000 Status - Rnd UUUUUUUUUUUUUUUUUUUUUUUU BID TOTALS 1 ADJUST MANHOLES TO GRADE WITH NEW 24" RING & COVER 6" EXCAVATION, GRANULAR BACKFILL & COMP. FOR SW SPRINKLER SYSTEM EXTENSION/REPAIRS PER SYSTEM EXISTING SANITARY SEWER MANHOLE CONNECTION 3" ASPHALT SURFACE COURSE PLANT MIX (145 PCF) CONCRETE SIDEWALK INSTALLATION-FLY ASH MIX CURB AND GUTTER INSTALLATION-FLY ASH MIX CATCH BASIN TO INCLUDE PIPING AND GRATE 2" SCHEDULE 40 CONDUIT UNDER SIDEWALK SEWER SERVICE LINES AND CONNECTIONS 6" OF TOPSOIL FOR GREEN SCAPE STRIP 4" OF 3/4" MINUS CRUSHED AGGR. BASE ADJUST WATER VALVES TO GRADE EXCAVATION/ASPHALT REMOVAL STORM INFILTRATOR SYSTEM FIRE HYDRANT RELOCATION CONCRETE WALL REMOVAL SANITARY SEWER LINE CAP 5th West Improvements 20" OF GRANULAR BORROW 8" SANITARY SEWER LINE GEO TEXTILE FABRIC 8" WATER MAIN LINE TRUNCATED DOMES 12:10 Description SOD *** Estimator 4 CA182154VE 05/25/2018 Biditem 100110120130140150160170180181182190 102030405051525360708090