HomeMy WebLinkAboutConcise Bid Proposal from Depatco for 5th W Reconstruction
Bid Total
8,840.001,350.005,840.009,700.001,275.008,370.001,720.004,760.002,450.004,000.001,440.00
61,225.0064,925.0027,840.0071,640.00890.00580.0050,600.0015,990.0028,350.0013,200.0043,725.00400.0024,885.00$453,995.00
Unit Price
15.5024.5048.0089.551,350.001,460.004,725.001,275.0016.0053.0023.7034.0015.00
1.70890.00580.0012,650.00194.00399.75930.00430.00200.00350.000.50
Units
LSLSLSLFLFLFSFLF========>
CYSYCYCYSYSYCY
TONEAEAEAEAEAEAEAEA
Bid Total
Quantity3,950.0005,200.0002,650.000580.000800.0001.0001.0001.0004.0004.00050.00040.0006.0001.0009.0004.000825.000825.0002.0001,050.000140.0007.0008,000.00096.000
Status - Rnd
UUUUUUUUUUUUUUUUUUUUUUUU
BID TOTALS
1
ADJUST MANHOLES TO GRADE WITH NEW 24" RING & COVER
6" EXCAVATION, GRANULAR BACKFILL & COMP. FOR SW
SPRINKLER SYSTEM EXTENSION/REPAIRS PER SYSTEM
EXISTING SANITARY SEWER MANHOLE CONNECTION
3" ASPHALT SURFACE COURSE PLANT MIX (145 PCF)
CONCRETE SIDEWALK INSTALLATION-FLY ASH MIX
CURB AND GUTTER INSTALLATION-FLY ASH MIX
CATCH BASIN TO INCLUDE PIPING AND GRATE
2" SCHEDULE 40 CONDUIT UNDER SIDEWALK
SEWER SERVICE LINES AND CONNECTIONS
6" OF TOPSOIL FOR GREEN SCAPE STRIP
4" OF 3/4" MINUS CRUSHED AGGR. BASE
ADJUST WATER VALVES TO GRADE
EXCAVATION/ASPHALT REMOVAL
STORM INFILTRATOR SYSTEM
FIRE HYDRANT RELOCATION
CONCRETE WALL REMOVAL
SANITARY SEWER LINE CAP
5th West Improvements
20" OF GRANULAR BORROW
8" SANITARY SEWER LINE
GEO TEXTILE FABRIC
8" WATER MAIN LINE
TRUNCATED DOMES
12:10
Description
SOD
*** Estimator 4
CA182154VE
05/25/2018
Biditem
100110120130140150160170180181182190
102030405051525360708090