900 North Skyline Drive, Suite B . ldaho Falls, lD 83402 . (208) 528-2650 C. L. "Butch" Otter, Governor
Curt A. Fransen, Director
February 9,2018
Arnold Woolstenhulme P.E.
AW Engineering
Box 139
Victor,ID 83455
Re: City of Rexburg, Wake Lake Water and Sewer Trunk Lines Plan Review DEQ# 18-02-33.
Dear Mr. Woolstenhulme,
The Department of Environmental Quality (DEQ) has reviewed the revised design plans and
specifications submitted February 7, 2018. The design plans and specifications meet state standards
and are therefore approved.
Our approval is for the design. We will give final project approval after the project is constructed and
the as-built drawings submitted for our records. This office must review any deviations from the
approved design that might result in violations of Idaho Regulations before field installation.
Within 30 days after construction, a professional engineer registered in the State of Idaho must provide
this office with as-built plans, or a letter of certification stating that the project was installed
substantially according to the approved design.
If you have any questions regarding this letter or if we can be of further assistance, please call me at
(208) s28-26s0
Sincerely,
William T PE
Water Quality Engineer
Idaho Falls Regional Office
C. Keith Davidson P.E., City of Rexburg