Loading...
HomeMy WebLinkAboutPLANS - 18-00293 - 1236 Bond Ave - Tooth TimeAREA MAP OCC. GROUP CONST. TYPE TOTAL SQFT HT ASSOCIATES 1152 BOND AVENUE — Suite A REXBURG, IDAHO 83440 WWW.JRWA.COM VOICE (208) 359-2309 FAX (208) 359-2271 PROJECT SITE SQFT FL COMMENT ARCHITECTURAL AREA MAP DENTAL OFFICE REXBURG, 2012 IBC ALLOWABLE I ACTUAL BUILDING TYPE OCC. GROUP CONST. TYPE TOTAL SQFT HT PER STORY STORPER PROJECT SITE SQFT FL COMMENT ARCHITECTURAL A1.0 BSMT 4,252 2 ST. MAIN FLOOR PLAN 1 ST. (B) 4,252 A1.3 BOND AVE. B V -B MAIN 4,252 EXTERIOR ELEVATIONS 9,000 REXBURG, ID A3.1 BUILDING SECTION > Q o 3000N mo Z U m , 40 , 24 (1) 4,252 20 REXBURG Y TOT 8,504 NOTES: 2000 N NORTH X05 51 T � o 33 W 1500 N a E 1000 N XX 33 20 m ga" REXBURG O MADISON luLu COUNTY —0 x IL W 3RD N ST REXBURG �ICHAD DR. MADISON RECREATION �wA - COUNTY FIELD OR ANGELA� ors. FAIRGROUNDS W 2nd N ST 3 E 2nd N ST REXBURG O GOLF w O Q �- COURSE rn v N 3 W1st NST vii E listNST lu us z z z z w❑�-,'- H ALL SMITH PAW 33 E. MAIN ST. z W. MAIN ST.�' N f�V INI OR W 1st S ST � MAPIE ONO I AtPORTER A RUS POST El PARK OMCE w sr F= U 2 o Z ¢v 3W 3,d S STN RIGIGS N < o 3 3 CloI I 2sE °1 =2A v ; REVISION: v COMMANCHE AVE N DRAWN BY: JOB NO: GDR X51 CHECKED BY: r j BAM DENTAL OFFICE REXBURG, 2012 IBC ALLOWABLE I ACTUAL BUILDING TYPE OCC. GROUP CONST. TYPE TOTAL SQFT HT PER STORY STORPER HT SQFT FL COMMENT ARCHITECTURAL A1.0 BSMT 4,252 2 ST. MAIN FLOOR PLAN 1 ST. (B) 4,252 A1.3 BUSINESS B V -B MAIN 4,252 EXTERIOR ELEVATIONS 9,000 EXTERIOR ELEVATIONS A3.1 BUILDING SECTION > Q o mo Z U m , 40 , 24 (1) 4,252 CONSULTANTS: Y TOT 8,504 NOTES: DESIGN CRITERIA SEISMIC DESIGN CATEGORY D ROOF SNOW LOAD 35 psf NET ROOF UPLIFT 21.9 psf WIND EXPOSURE C FROST DEPTH 30" RISK CATEGORY II IDAHO DRAWING INDEX DRAWING No. GENERAL BRENT A. McFARLAND AR -2561 G1.1 COVER SHEET & INDEX TO DRAWINGS 5/30/1 S SITE DEVELOPMENT SD1.1 SITE PLAN - LAYOUT ARCHITECTURAL A1.0 BSMT, FT'G AND FND PLAN A1.1 MAIN FLOOR PLAN A1.2 FLOOR FRAMING PLAN A1.3 ROOF FRAMING PLAN A1.4 ROOF PLAN A2.1 EXTERIOR ELEVATIONS A2.2 EXTERIOR ELEVATIONS A3.1 BUILDING SECTION > Q o BRENT A. McFARLAND AR -2561 of 5/30/1 S STATE OF IDAHO FZ N N r7 00 W� 00 0 0 v Q � X Q CC m C) W N Q� U' �� �� ® �� I W W U ®A w O �p > Q o mo Z U m N � CONSULTANTS: Y � o z a � O luLu —0 x IL o A � O w O Q �- lu ll.l w F= U 2 o Z ¢v o =2A REVISION: DRAWN BY: JOB NO: GDR X51 CHECKED BY: DATE: j BAM MAY ' 15 PLOT DATE: DRAWING N0. RE: 61.1 OF BOOR NOTES A3 66" MAX I� ALL DOORS TO BE 3'-0" X 6-8" (U.N.0) EXTERIOR DOORS: A. (3) 4" HINGES (PER LEAF) B. (1 SET) WEATHER SEAL C. LEVER LOCKSET, VERIFY FUNCTION W/ OWNER D. METAL THRESHOLD (WEATHER SEAL) E. LOCK CYLINDER F. CLOSURE ALL OTHER DOORS: A. (3) 4" HINGES (PER LEAF) G. LEVER PASSAGE SET (VERIFY W/ OWNER FOR DOORS W/ LOCKSET (C.) A3'41 " MAX 39" MIN :A:l 36 MINZrL �- `L A2 4 I� m WATER CLOSET WATER CLOSET lelINI:)OA MOTES WINDOW5: • GLAZING TO BE 1" INSULATED LOW 'E' ON ALL SIDES • GLAZING TO BE CLEAR 2'-6" MIN CLR 0 WIDTH Q v D Of a 12" MAX 3I -II, MIN 0 INSULATE z 3 z z ALL EXPOSED PI : 5F >_ i Tr tr z z STANi ARP HE 1 GHT REOU I REMENTS 5CALE: 1/4" = 1'-0" 6" MAX TOE 8" MIN KNEE CLEARANCE CLEARANCE LAVATORY. MIRROR & SOAP DISPENSER B o TO DISPENSING OUTLET - zo FORWARD REACH TOILET SEAT COVER DISPENSER IFI ELECTRIC HAND WASTE RECEPTACLE DRYER ACCESSORY SCHEDULE AI 36" GRAB BAR (REFER TO A4.1 FOR STD. HEIGHTS 4 DIMENSIONS) 42" GRAB BAR (REFER TO A4.1 FOR 5TD. HEI6HT5 4 D I MEN51 ON5) ❑15" VERTICAL GRAB BAR (REFER TO A4.1 FOR ' 5TD. HE16HT5 4 DIMEN51ON5) ❑B PAPER TOWEL D15PEN5ER C TOILET PAPER D15PEN5ER (OWNER FURNI5HED, CONTRACTOR INSTALLED) aMIRROR a50AP DI5PEN5ER ElELECTRIC HAND DRYER - OWNER OPTION U� Q Qz vases xw Q o Wa0 00 .0 Q o x j -co o ELECTRIC HAND WASTE RECEPTACLE DRYER ACCESSORY SCHEDULE AI 36" GRAB BAR (REFER TO A4.1 FOR STD. HEIGHTS 4 DIMENSIONS) 42" GRAB BAR (REFER TO A4.1 FOR 5TD. HEI6HT5 4 D I MEN51 ON5) ❑15" VERTICAL GRAB BAR (REFER TO A4.1 FOR ' 5TD. HE16HT5 4 DIMEN51ON5) ❑B PAPER TOWEL D15PEN5ER C TOILET PAPER D15PEN5ER (OWNER FURNI5HED, CONTRACTOR INSTALLED) aMIRROR a50AP DI5PEN5ER ElELECTRIC HAND DRYER - OWNER OPTION BRENT A. McFARLAND AR -2561 Q 5/50/15 STATE OF IDAHO 04 N N Wa0 00 .0 Q o x Q m o W ckf N Q� U_I CL)� AMA, (f)� W W U two Q 0 00 Z U m� N � Lo CONSULTANTS: Y 0 Q Lu V LL � O Z O z O Lu O Q � O � � w V U Z LLJ O Q cn REVISION: DRAWN BY: JOB NO: GDR X51 CHECKED BY: DATE: j BAM MAY ' 15 PLOT DATE: DRAWING NO. FlLE: OF QSS H MZ ALL UTILITY INSTALLATION oSHALL BE AS FEE � G I T`I' Or- REX5UR6 STANiPARJ;)S o �I vTRV �jTRV WW1 LIP�BC SITE PLAN - Rr=VI Sr=i:) SCALE: I" = 10' 5/2/1 S AIORT. &O PWR �c /Ic. � co PWR PWR � � 1 (o EO EO PWR EO PWR EO D58IRBYREMPLS7381 PWR �� � NOTES ��� "D LET BOX /SETTLING MANHOLE #I O EXISTING CURB AND GUTTER�\ 1PW1`� IM ELEVATION = 75.71 NG O EXISTING FIRE HYDRANT �TTOM ELEV = 71.71 NG 0NMVAU LT INVERT OUT = 72.71 O LANDSCAPE/SNOW STORAGE O 6WIDE THICKENED EDGE 51 DEAALK O IS" CONCRETE CATCH CURB - LOW BACK - RELEASE O la" CONCRETE CATCH CURB - LOW BACK - CATCH O DUMP5TER PAD - SCREEN AS PER C 1 TY ORDINANCE O8 DEPRESSED CONCRETE HO RAMP SEE DETAIL O 4" PAINTED PARKING STRIPES. 10 HC PARKING 5YMBOL. I I HC PARKING S 1 GNAGE TYP. OF I 12 PAVEMENT SECTION - 2-1/2" ASPHALT PAVING, 4" GRANULAR BASE AND 12" ENG 1 NEERED FILL MIN. I5 DEPRESS CONCRETE FOR SNOW 5TORAGE 14 6" CONCRETE DRIVE 15 5' WIDE CITY'S PEDESTRIAN AALK TO NOWHERE Q oX NG I NG SITE I Nr-ORMAT I ON 4,200 SF X 4 5TALL5/1,0005F = 17 STALLS REQUIRED I ACCESS 1 BLE SPACE REOU I RED AS PER TABLE I I O6. I TOTAL LOT AREA = 18,117 5F LANDSCAPE AREA REOU I RED = 3,635 SF LANDSCAPE AREA PROV I DED = 4,33(o SF LOT COVERAGE = 23.1% n D NG NG BNOA 57 01 A6 r= LET BOX / SETTLING MANHOLE #2 5,581 FT 2 SURFACE AREA IM ELEVATION = 75.71 850 FT STORAGE AREA REG2U I RED DTTOM ELEV = 71.71 1,251 FT STORAGE AREA PROVIDED "INVERT OUT = 72.71 D121RLS3020 cb Ne N G O A W 0 a - W ¢ U W U ¢ W 0 z W Z 0 U Z w D 0 3 ¢ W A 0 z LD V) w ra v� LD 3 _ 0 w 0 D Q W N 0 D ¢ z D z ¢ J O z 0 U Q Z ¢ W z 3 0 J ¢ 0 z w U W _ U Q' ¢ Li Z ¢ LD a- u U m Q W U W O NG 0 F-1 z ¢ A LDZ U J J BRENT A. McFARLAND AR -2561 5/30/1 S STATE OF IDAHO N N Ww M M 00 Q oX Q� m W N VQ� ® ao �m �w w U o 0 m Q � N Of CONSULTANTS: Q w v IL � O O~ W O Q �L V • Li J W � z o REVISION: DRAWN BY: JOB NO: RSM 751 CHECKED BY: DATE: BAM MAY ' ie) PLOT DATE: 5-30-18 DRAWING NO. FILE: 751-SD1.1-LO * SD1.1 51.1 OF STRAP FROM END OF UPPER LEVEL SHEAR WALL WHERE INDICATED ON PLANS. INSTALL ON DBL STUD — EDGE NAIL SHEATHING AT DOUBLE STUD FULL HEIGHT DOUBLE STUDS AT EACH END OF SHEARWALL UNLESS NOTED OTHERWISE ON PLANS — FACE NAIL DBL STUDS W/ 16d AT 16" O.C. EDGE NAILING AT ALL SHEATHING PANEL EDGES PER SHEARWALL SCHEDULE — STAGGER NAILS AT DBL PLATE OR STUDS HOLDOWN TO FOUNDATION W/ REQ'D ANCHOR BOLT OR STRAP TO LOWER LEVEL AT ENDS OF SHEARWALL WHERE INDICATED ON PLANS ANCHOR BOLTS TO FOUNDATION OR NAILS TO LOWER FRAMING PER SHEARWALL SCHEDULE cork IIrklife] 101 pi = if] 0=%II 101 92 111 FIELD NAILING AWAY FROM PANEL EDGES PER SHEARWALL SCHEDULE SOLID 2x BLOCKING AT ALL PANEL EDGES VERTICAL STUDS AT 16" O.C. *am%1mT A PROVIDE ADDITIONAL KING STUDS AT OPENING PER PLANS OR SCHEDULE CONT DBL 2x TOP PLATE, SPLICE PER TYPICAL DETAILS CONTINUE TOP PLATES OVER HEADER TRIMMER STUD UNDER HEADER PROVIDE ADDITIONAL TRIMMERS WHERE INDICATED ON PLANS WALL SHEATHING PER SHEARWALL SCHEDULE SOLID BLOCK TO RECEIVE STRAP AS OCCURS, SEE PLAN 100'-4" SCALE: 1/4" = I' - O" 7 : NORTH r-OOTIN6 SGHE=7ULr= w SEE PLAN AND DETAILS FOR v CONSTRUCTION ABOVE FOOTING f(1 3" GLR FOOTING REINFORGIN6 WIDTH/ i �� FOOTING WITH BOTTOM STEEL MARK DIMENSIONS FOOTING REINFORGINCG THICK WIDTH LENGTH WFl.bb 8" I'-8" GOVT. (2) #4 BARS BOTTOM WF1.33 8" 1'-4" GOVT. (2) #4 BAR5 BOTTOM WF2.5 8" 2'-6" 2'-6" (3) #4 BARS BOTTOM RECOMMENDATIONS IN LOCATION AND LENGTH. IO.PRESSURE TREATED DOUGLAS FIR SHALL BE USED WHERE WOOD MEMBERS COME IN CONTACT WITH CONCRETE. 11. NUTS SHALL BE SECURELY FASTENED AGAINST SILL PLATE. HOWEVER, NUT AND WASHER SHALL NOT BE RECESSED INTO SILL FEIR SCHEDULE 12.ALL NUTS SHALL HAVE 3"x3"xl/4" PLATE WASHERS. REINFORGINCG VERTICAL PI CONCRETE Ib"xlb" (4) #5 DOWELS #3 TIE5 AT 8" O.G. 5/8" AB AT O 7/I6" APA RATED BLOCKED ONE SIDE OF S 46" O.G. HALL SGHr=OULr= Sd AT 12" O.G. REINFORCING VERTICAL HORIZONTAL GWI CONCRETE O'-8" #4 AT I S" O.G. #4 AT I b" O.G. , 2 #4 GOVT. TOP 2 #4 DONT. BOTTOM SHEAR 1ALL SGHEMLE I. FRAMING MEMBER SUPPORTIN6 MATERIAL SHALL BE SPACED AT Ib" O.G. MAXIMUM. 2.ANC IOR 5OLT5 TO FOUNDATION SHALL BE EMBEDDED 7 INCHE5 INTO CONCRETE. EXPANSION BOLTS MAY BE USED AT INTERIOR WALLS (AWAY FROM EDGE OF SLAB OR SLAB STEP DOWN) PER GENERAL STRUCTURAL NOTES. 3.A MAXIMUM OF TWO ANCHOR BOLTS SHALL BE USED ON EACH SILL PLATE PIECE. PROVIDE ONE ANCHOR BOLT MINIMUM WITHIN 9 INCHES OF EACH END OF EACH PIECE, AND NO CLOSER THAN 4 1/2" TO END OF PLATE. 4. PROV I DE FULL HE 16HT DOUBLE STUBS AT ENDS OF SHEAR WALLS UNLESS OTHERWISE NOTED ON PLANS OR DETAILS. 5.BLOCK ALL PANEL EDGES AND EDGE NAIL SHEATHING AT BLOCK ED&E5 . SEE TYPICAL SHEAR WALL C-ON57RXTION DETAIL. &.SHEATHING SHALL BE ARRANGED SO THAT THE WIDTH OF THE SHEET IN A SHEAR WALL SHALL NOT BE LESS THAN 2 FEET. 7. ELEVATED SHEAR WALLS TO BE FRAMED OVER DOUBLE JOIST OR SOLID 5LOGKIN6 UNLESS NOTED OTHERWISE. 8.FOR 5/8" TO 3/4" THICK FLOOR SHEATHIN6, 3 1/4" (MIN) LONG NAILS SHALL BE USED. FOR 7/8" TO 1 1/8" THICK FLOOR 5HEATHIN6, 3 1/2" (MIN) LONG NAILS SHALL BE USED. 11.SD5 SCREWS TO BE INSTALLED AS PER MANUFACTURES RECOMMENDATIONS IN LOCATION AND LENGTH. IO.PRESSURE TREATED DOUGLAS FIR SHALL BE USED WHERE WOOD MEMBERS COME IN CONTACT WITH CONCRETE. 11. NUTS SHALL BE SECURELY FASTENED AGAINST SILL PLATE. HOWEVER, NUT AND WASHER SHALL NOT BE RECESSED INTO SILL PLATE. 12.ALL NUTS SHALL HAVE 3"x3"xl/4" PLATE WASHERS. MARK 5HEATHIN6 MATERIAL E 176E NAILING. FIELD NAILING BOT. PLATE ATT. 5/8" AB AT O 7/I6" APA RATED BLOCKED ONE SIDE OF S 46" O.G. 8d AT b" O.G. Sd AT 12" O.G. Ibd STAGGERED AT b" O.G. rCA)Nva i ra NO TE S U GONTINUE WALL AND FOOTING REINFORGEMENT INTO WALLS AND FOOTINGS THAT ARE PERPENDIGULAR TO EAGH OTHER. O2 ALL HOLDDOWNS AT ENDS OF SHEARWALLS WHERE INDICATED ON THE PLAN ARE S I MPSON TYPE. ATTAGHMENT REQUIREMENTS TO WALL AND FOUNDATION ARE PER S I MPSON. HOLDDOWN BOLTS AS PER HOLDDOWN REQUIREMENTS. 5/8" DIA ANGHOR BOLTS W/ 8" EMBEDDED INTO GONGRETE SHALL BE INSTALLED AT 32" O.G. MAXIMUM AT ALL SILL PLATES UNLESS OTHERW 1 SE REOU I RED PER THE SHEARWALL SGHEDULE. ALL ANCHOR BOLTS REOU I RE 3x3x3/16 PLATE WASHERS. O A MINIMUM OF 2 ANGHOR BOLTS SHALL BE USED ON EAGH SILL PLATE PIEGE. PROVIDE I ANGHOR BOLT MINIMUM WITHIN q INCHES OF EAGH END OF EAGH PIEGE, AND NO GL05ER THAN 4 1/2" TO END OF PLATE. Q u BRENT A. McFARLAND AR -2561 of 5/30/1 S STATE OF IDAHO 04 N N ® o M M W00 00 O o S v o x cx w Z rn m LuN K rn UI co O I w J w U ^I /\ ZD O > i? � O Z U O Q m � N cl:� CONSULTANTS: 1 I Y a Q z Ll O Q � lu x in l9 X' q� w �MMl U � LLI Z D � o REVISION: DRAWN BY. JOB NO: R5M 751 CHECKED BY: DATE: BAM MAY ' I8 PLOT DATE: 5-30-18 DRAWING NO. FILE: 751-A1.0-BSMT * A1.0 ALC OF 100'-q" FACE 0t� FDUNDATION WALL MAIN f=LOOR PLAN 5GALE: 1/4" = 1' - O" GENERAL NOTES A DIMENSIONS ARE FROM FAGS OF STUD (U.N.0) L7 r CL 0 U cn A w U W 0 W z L7 w A G] Z ¢ L7 MOTES z 05EE DETAIL A/61.2 FOR GRAB BAR AND ADA PNI AGGE55ORI ES MOUNTING HEIGHTS AND � LOGATI ONS J J 0 w ¢ U 0 3 BRENT A. McFARLAND AR -2561 la STATE OF IDAHO N N 01 � M oNo 0- 2 x 0 Q M � N I Q� U� 0.5@' N0 FACE OF FOUNDATION WALL Q� o oQ Qz m� N � L� CONSULTANTS: Y d 10'-2" 12'-10" 10'-2" 31'-0" 3 LLL 21'-10" 5'-8" 4:_O�" ¢ 4'-q" 41-ok 5'-8" ¢ la' -6" 5'-10" IL0 z 0 LLI 0 A O O 12'-2" 4'-11" U Z r rcl- — — 5050 -- — — — — — — — — — — — — — — — — — — — — — — — 5050 — — — — — — — — — — i 0850 — — J 0850 i 4050 1 4050 L — — — — — — — — — — — i 6850 0850 i — — — J L- 5050 — — — — — — — — — — — — — — — — — 5050 ci DRAWN BY: JOB NO: RSM '75I CHECKED BY: DATE: 10 MAY ' 18 PLOT DATE: 5-30-18 O NO2 O DRAWING NO. RLE: 751-A1.1-MFP * AU VESTIBULE BUSINESS - O STOR. z A JN MANAGER VESTIBULE MAIN z Q - -� 2 O O r ENTRANCE CD I O Ll Lo OD 0 QUIET TREATMENT ROOM I HALL COPY ROOM I I S I _ ° BUSINESS MAIN ENTRANCE RECEPTION 8_-1 OFF CIE = I m AAITIN6 lo(D I N o PRIVATE OFFICE 3'R CLO. 4'-3" I �t j. Lo I I STERILE RECEPTION I J C CHECK-OUT O — - I no � \ � I \ I I z I QUIET TREATMENT - IMAGING ALCOVE _ CLO. / PUBLIC ��RESTRM / PRIVATE 4 I ROOM 2 S ROOM N =K.1 S RM CONFERENCE - I lo� 5TRoo �� oIJ�� - IN I /��o I ILo 1 ID lu I — —— O / I I� 4 � I 9 STORAGE — J 3'R � WAITING D O 0 of I 3'R " 5'-241-10#1 51 11 V HALL — SSTATITION — — — — — — — — — — — — — — — S5TATITION — rolixg,111WOOD AREA J COLUMN m / I OFFICE I C1 U -) ov ov OFFICE 2 I OI WAITING TREATMENT 5 TREATMENT 4TREATMENT 5 TREATMENT 6 i � / _ � � o I / RESTRdoM ---------� ------- ------- --- --- -- - — — — — — — — — — A I L — — — — — — — — — — — — — — — — — — — — — I — — — — — — — — — — — — J L- — — — — — — — — — — — — — — — — 5050 5050 5050 5050 5050 m LH 5050 m 5036 3060 3060 5036 A3.1 a' -o" 4'-I " 4'- " 7'-O" 10'-5" 7'-0" 4'- " 7'-4" 7'-4" 8'-2" 8'-2" 3 . 10'-a" 26'-3" 33'-2" 14'-8" 16'-4" 5� -70 1oI'-a" FACE 0t� FDUNDATION WALL MAIN f=LOOR PLAN 5GALE: 1/4" = 1' - O" GENERAL NOTES A DIMENSIONS ARE FROM FAGS OF STUD (U.N.0) L7 r CL 0 U cn A w U W 0 W z L7 w A G] Z ¢ L7 MOTES z 05EE DETAIL A/61.2 FOR GRAB BAR AND ADA PNI AGGE55ORI ES MOUNTING HEIGHTS AND � LOGATI ONS J J 0 w ¢ U 0 3 BRENT A. McFARLAND AR -2561 la STATE OF IDAHO N N 01 � M oNo 0- 2 x 0 Q M � N I Q� U� 0.5@' N0 I w W w o Q� o oQ Qz m� N � L� CONSULTANTS: Y d Q LLL 1L IL0 z 0 LLI 0 A O O U Z rcl- in REVISION: DRAWN BY: JOB NO: RSM '75I CHECKED BY: DATE: BAM MAY ' 18 PLOT DATE: 5-30-18 DRAWING NO. RLE: 751-A1.1-MFP * AU A I . I OF 2 2 BRENT A. McFARLAND AR -2561 El 2 BRENT A. McFARLAND AR -2561 El I I I Ir-e�' • rsi • a•xa• v IICIOLU _l_L� � � I I I I I I I 1111 M__ e, i i i i iii i i i i i i i i i i I I I I I I i i i i i 14' TJI 3G0 AT 1(0" O.G. ::H4I I Jill F132r-13:2 2FII F�IIm3.2oIo, ° 3\ \k L II II I I I I II II II II II II II ;;;;;;�;;;; IIIIIIIII �Ip��,��� IIIIIIIIIII e I I I I I I A3.1 FLOOR f=RAM I N6 PLAN 5GAd-E: 1/4" = 1' - O" I pp D n D' NOTES OI FLOOR SHEATH I NG - 5/4" APA RATED N 10d NAILS AT b" 0/0 PANEL EDGES AND BOUNDARY AT 12" 0/0 IN THE FIELD. O2 bxb POST A W 0 W ¢ H U W H H _ U W 2 0 z W z 0 U z W H 0 H 3 ¢ W A 0 z V) W A vi 0 z_ 3 ¢ A L.L W 0 A W N_ w 0 _ ¢ z z ¢ 0 z 0 U A z ¢ 0 w W z 3 0 J ¢ H 0 z ¢ W Q' F— u U W H U ¢ W n z ¢ _ CL 0 U W U W H O W w ¢ z L3 V) W A A z ¢ 0 z 3 A U J J W U 0 V) 3 0 u BRENT A. McFARLAND AR -2561 5/50/1 S STATE OF IDAHO Fz N N — I fshnLu M 00 = v Q x Q Q m N � I Q� U� 0.5@' �0 I w W L% = O LLJ V 1 Q 0 O Q QZ� M � N O' CONSULTANTS: a iu 1 F O 1 z LLIO DC O O lil U LLJC) Z cl:f ck� cl- o REVISION: DRAWN BY: JOB NO: RSM '75I CHECKED BY: DATE: BAM MAY ' 18 PLOT DATE: 5-30-18 DRAWING NO. RLE: 751—A1.2—FFP * A1.2 AL2 OF O ROOF FRAM I NCS FLAN 50ALE: 1/4" = 1'- O" +NO�RITH NOTES OI 2x4 PONY 1NALL OVERBUILD AT 24" OIG (SHADED AREA) O2 PRE FABRICATED ROOF TRUSSES TIE EA. ROOF TRUSS TO TOP PLATE 1N/ (1) SIMPSON HI GLIP O ROOF SHEATH I NG - I Q/32 " APA RATED W/ Sd N41 LS AT 6" 0/0 PANEL EDGES AND BOUNDARY AT 12" 0/0 IN THE FIELD. O PRE ENGINEERED DECORATIVE ROOF TRUSSES W 0 W Q U W 2 U a W 2 L, Z W Z 0 u Z W 3 O 2 3 Q W Q 0 z 0 W A (13 z 3 a ra W 0 W Q W N_ 0 D z z J O H Z 0 u ra z a CL W z 3 0 J Q O Z a W U W H U a W p z a 0 U r AQ Q W U W O W a Z W A Q z Q 0 z 3 Q Q J J W Q U O M Q o6 3 L u BRENT A. McFARLAND AR -2561 5/50/le) STATE OF IDAHO 04 N N ® o M M W00 00 O o S v o x cx W c m LuN K Uo' W J w U ^I /\ : O > \ cnO Z U O Q m � N C CONSULTANTS: A I I Y a O \ Q zLl Z O IL IL O l� 0 7) wLLI O ROOF FRAM I NCS FLAN 50ALE: 1/4" = 1'- O" +NO�RITH NOTES OI 2x4 PONY 1NALL OVERBUILD AT 24" OIG (SHADED AREA) O2 PRE FABRICATED ROOF TRUSSES TIE EA. ROOF TRUSS TO TOP PLATE 1N/ (1) SIMPSON HI GLIP O ROOF SHEATH I NG - I Q/32 " APA RATED W/ Sd N41 LS AT 6" 0/0 PANEL EDGES AND BOUNDARY AT 12" 0/0 IN THE FIELD. O PRE ENGINEERED DECORATIVE ROOF TRUSSES W 0 W Q U W 2 U a W 2 L, Z W Z 0 u Z W 3 O 2 3 Q W Q 0 z 0 W A (13 z 3 a ra W 0 W Q W N_ 0 D z z J O H Z 0 u ra z a CL W z 3 0 J Q O Z a W U W H U a W p z a 0 U r AQ Q W U W O W a Z W A Q z Q 0 z 3 Q Q J J W Q U O M Q o6 3 L u BRENT A. McFARLAND AR -2561 5/50/le) STATE OF IDAHO 04 N N ® o M M W00 00 O o S v o x cx W c m LuN K Uo' W J w U ^I /\ : O > i? ¢ M cnO Z U O Q m � N C CONSULTANTS: A I I Y a O Q zLl Z O IL IL O l� 0 7) wLLI U � Z C) � o REVISION: DRAWN BY. JOB NO: R5M 751 CHECKED BY: DATE: BAM MAY ' I8 PLOT DATE: 5-30-18 DRAWING NO. FILE: 751 -A1.3 -RFP * A1.3 A1.5 OF ROOF PLAN 50ALE: 1/4" = V- O" NORTH NOTES OI ARGHITEGTURAL ASFHALT SHINGLES ON #30 BUILDING FELT iLL 41 1 O2 VENTED ROOF GAF BY SHINGLE MANUFACTURER O METAL ATTIC \/ENT ❑ L u BRENT A. McFARLAND AR -2561 ol 5/50/le) STATE OF IDAHO I N N ® o M M W00 00 O o S v o x � w cn rn m Lu ff)N K (,-:") 1A V ® N o I w ZD O .w > 1 ¢ 0 v cn O Z U O Q m < N C( . CONSULTANTS: 1 I Y a � o O~ z Ll O Q OL IL O l� wLLI0 C) � o I REVISION: DRAWN BY. JOB NO: R5M 751 CHECKED BY: DATE: BAM MAS r ' I8 PLOT DATE: 5-30-18 DRAWING NO. FILE: 751 -A1.4 -RP * A1.4 A1.4 OF 113'-8" ELEV. DORMER gg'—g 3/4" ELEV. T.O.P. T.O.F. F— � � J � � � J —1 F_ -7 8q'—q 3/4" ELEV. — — — —— — — — _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Ll T.OP. C-------------------------------------------------------------------------------------1------------------------------------------------I1 EAST EL-EVAT I Ou SGALE: 1/4" = V- O" Sq' -q 3/4" ELEV.3/4" ELEV. — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — BSMT.F.F. T.O.F. SOUTH ELEVATON 5GALE: 1/4" = 1'- O" V. q5-3 3/4" ELEV. T.O.F. N07r=5 OI BRICK VENEER 118'-3" ELEV. T.OA OL 110'-10 7/8" ELEV T.O.W. IOq'-I I/8" ELEV. -OILTRUSS' BEARING OL 100'-o" ELEV. F.F. qq'-q 3/4" ELEV T.O.W. q0' -I 3/4" ELEV. B5MT. F.F. O2 CULTURED STONE VENEER (DRY 5TA+CKED) O FIBER CEMENT BOARD 51 D I NG (PAS I NTED) O4 E.I.F.5. 1 1/2" (EXTERIOR IN5ULATION FINISH SYSTEM) OS ARCH I TECTUR,4L A5PHALT SHINGLE O6 METAL ROOFING SYSTEM O EXPArN51 ON GROOVE (I " 'V' GROOVE) O PRE CAST CONCRETE WINDOW SILL O PRE CA5T CONCRETE CACP I O PRE FIN 15HED METAL VENT W/ I N5ECT SCREEN II 5' ROUND CLOCK 12 4" METAL ADDRE55 NUMBERS (VERIFY) rz W 0 W Q U W _ U a W _ W O H z W Z O u Z W 3 0 _ 3 Q W Q H 0 C4 Z W (1 z_ 3 a ra W 0 W Q W N_ 0 _ 0 z Z J O z 0 u ra z Q W Z 3 0 J Q O Z a W U W 2 u a W Q Z Q 0 U r AQ Q W U W O d W a Z W A Q Z 0 Z_ 3 a Q J J W Q U O Q o6 3 L u BRENT A. McFARLAND AR -2561 ol 5/50/le) STATE OF IDAHO I N N ® o M M W00 00 O o S v o x � W cn rn m Lu N rn ¢ `n U' I °J N o ® W ZD O 00 Z U o< m < N C]:� L . CONSULTANTS: 1 I Y a O � I O Ll OQ O lu O Q � o I REVISION: DRAWN BY: JOB NO: RSM 751 CHECKED BY: DATE: BALM MANY 'I S PLOT DATE: 5-30-18 DRAWING NO. FILE: 751 -A2.1 -XE * A2.1 A:2.1 OF ELEV. T.OA ELEV. 110' -lo 7/8" T.O.W. ELEV. IOq'-I I/8" jk TRUSS BEARING Nv ELEV. 100'-O" P.P. - ELEV. qq'-q 3/4" T.O.W. ELEV. q0' -I 3/4" 55MT. P.P. ELEV. I Oq'-I 1/8" TRUSS BEARING ELEV. loo' -o" P.P. ELEV. qq'-q 3/4" T.O.W. ELEV. 113'-8" DORMER ELEV. qq'-q 3/4" T.O.P. I I I I I I I I I I I I I I I I I I I I I I I I I� — — I I I I I I I I I I I I I I I I — 1 I I I I I I I EV. 8a' -a 3/4�� ------ -- -- -- — _ -------------- -- -- ------------ -- ---- _ — — --- — I N N ® o M M ASST ELEVATION SGA -E: 1/4" = V- O" ELEV. q5-3 3/4" _ T.O.P. qq'-q 3/4" T.O.W. I I I ELEV. q0' -I 3/4" I _ — — OIL_ I ELEV. 8q' -q " 3/4 T.O.P. NORTH ELEVATON 5GALE: 1/4" = 1'- O" N07r=5 OI BRICK VENEER O2 CULTURED STONE VENEER (DRY 5TA+CKED) O FIBER CEMENT BOARD 51 D 1 NG (PAS I NTED) O4 E.I.F.5. 1 1/2" (EXTERIOR IN5ULATION FINISH SYSTEM) OS ARCH I TECTUR,4L A5PHALT SHINGLE O6 METAL ROOFING SYSTEM O EXPArN51 ON GROOVE (I " 'V' GROOVE) O PRE CAST CONCRETE WINDOW SILL O PRE CA5T CONCRETE CACP I O PRE FIN 15HED METAL VENT W/ I N5ECT 505ZEEN II 5' ROUND CLOCK 12 4" METAL ADDRE55 NUMBERS (VERIFY) rz W 0 w U W _ U a W _ O H z W z O u Z W 3 0 _ 3 Q W Q H 0 z 0 w A (13 z 3 a ra 0 w Q w N_ 0 _ 0 z Z J O z 0 u r-4 z Q W Z 3 0 J Q O Z a w U W 2 u a W Q Z Q 0 U r AQ Q w U W O d W a Z W A Q Z 0 z_ 3 a Fa �i J J W Q U O Q o6 3 L u BRENT A. McFARLAND AR -2561 ol 5/50/le) STATE OF IDAHO I N N ® o M M W00 i) 0 0 o x cn rn m Lu N rn ¢ `n U' ® N o W ZD O .w > v 1 ¢ 0 o0 Z O Q m � N CU L . CONSULTANTS: 1 I Y a t O � IL O Ll OQ O lu LLI O Q � o I REVISION: DRAWN BY. JOB NO: RSM 751 CHECKED BY: DATE: BALM MANY 'I S PLOT DATE: 5-30-18 DRAWING NO. FILE: 751 -A2.2 -XE * A2.2 A:2.2 a OF qa'-ci 3/4" ELEV. T.O.P. clf-3 3/4" ELEV, T.O.P. SETA I L SGALE: 1/4" = P- 0" N07r=5 OI FOOTING - SEE DRAAING A1.0 O COMPACTED ENGINEERED FILL O3 6 MILL VI50UEEN VAPOR BAPRIER UNDER GRAVEL O 4" FREE DRAINING GRAVEL O 4" CONCRETE SLAB ON GRADE O6 5" CONCRETE FOUNDATION AALL - SEE DRAAING ALO O ASPHALT EMULSION DAMP PROOFING O8 2x4 AT 16" 0/0 FOUNDATION AALL FURRING A/ R-11 BATT INSULATION O DOUBLE PANE I" INSULATED LOA E AI NDOA A/ MIN. U \/ALUE .45 (TYPICAL) 2 I PRE ENG 1 NEERED ROOF TRUSS - SEE ROOF FRAMING PLAIN DRAAING A I A 2� 2X4 AT 16' 0/0 PONY AALL5 AT 32" 0/0 OVERBUILD AT DORMERS. 23 ARCH I TECTURArL ASPHALT SHINGLE ON #30 LB BUILDING FELT (3/4") FLOOR 5HEATH I NG SEE FLOOR FRAM I NG PLAN A1.3 q0' -I 3/4" ELEV. MT. F.F. 25 VENTED ROOF CAP BY SHINGLE MANUFACTURER L u BRENT A. McFARLAND AR -2561 10 (17) STAIR RISERS AT STATE OF IDAHO I I HANDRA I L 34" TO 56" ABOVE F I N I SHED STAB I R TREAD EAI. SIDE OF STAB I R Y , HEAL AQ 12 5/5" GYP. BD. TEXTURE AND FAINT 10a' -I 1/5" ELEV. cn� m LuN TIS BEARIN6 13 2X6 AT 16" O/C EXT. AArLL FRAMING A/ R-21 BATT w J w U ^I /� ZD o ¢o INSULATION m�:, 14 1/2" OR 7/16" EXTERIOR AALL SHEATHING 15 AIR INFILTRATION BARRIER (BUILDING ARAP) 16 EXTERIOR SIDING I ACTT I C INSULATION R-50 18 PLYAOOD INSULATION BAFFLE loo' -o" ELEV. I Q PERFORATED METAL SOFFIT � qG'-q 3/4" ELEV. ROOF SHEATH I NG -SEE ROOF FRAMING PLAN T.OA DRAAING A1.4 2 I PRE ENG 1 NEERED ROOF TRUSS - SEE ROOF FRAMING PLAIN DRAAING A I A 2� 2X4 AT 16' 0/0 PONY AALL5 AT 32" 0/0 OVERBUILD AT DORMERS. 23 ARCH I TECTURArL ASPHALT SHINGLE ON #30 LB BUILDING FELT (3/4") FLOOR 5HEATH I NG SEE FLOOR FRAM I NG PLAN A1.3 q0' -I 3/4" ELEV. MT. F.F. 25 VENTED ROOF CAP BY SHINGLE MANUFACTURER L u BRENT A. McFARLAND AR -2561 5/50/le) STATE OF IDAHO 04 N ® o M M W00 0 0 o x � w cn� m LuN U� �o w J w U ^I /� ZD o ¢o 00 Z U O Q m�:, N cl� CONSULTANTS: A I I Y 0 Q lU 1L ILO ~ Olu V ju Q O V , - n l9 � _� w � U Z_ O Q REVISION: DRAWN BY. JOB NO: RSM 751 CHECKED BY: DATE: BALM MANY 'I S PLOT DATE: 5-30-18 DRAWING NO. FILE: 751 -A3.1 -BS * All A5.1 OF