Loading...
HomeMy WebLinkAboutP&Z REVIEW REPORT 2 - 18-00220 - 297 E 7th N - Covey Cove - 4 PlexReview Report Current Planning and Zoning Review - Site Plan Status: REVISIONS Application Number: 18-00220Permit Details Application Received Date: 04/30/2018 Multi-Family Residential Application Approved Date: Application Approved Status: ACPTW/COND 04/30/2018 Application Approved Date: Application Approved Status: ACPTW/COND 04/30/2018 297 E 7th N Cobey Cove - New MFR Status of Plan Reviews Completed 05/04/2018Planning and Zoning Review - Site Plan REVISIONS Permit Review Status Plan Reviews Still in Progress Building Review Electrical Review Plumbing Review HVAC Review Public Works Review - Site Plan Fire Department Review - Site Plan Planning and Zoning Review - Site Plan DESCRIPTION COMMENTS STA TUS *Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed! Checked for linked cases YESComprehensive plan and zone change are currently in process. Minimum distance between buildings REVISIONSThe side yard requirements for MDR1 is six feet. As currently configured, the buildings with less than twelve feet between them would require that there be one ownership for the entire project unless the units or buildings were condominiums or the project was created as a Planned Unit Development (PUD). *Revisions Response : Driveway, parking lot dimensions REVISIONSThere are no dimensions provided. *Revisions Response : Fencing/screening (HVAC equipment, dumpsters, parking, etc) REVISIONSScreening not identified on plans. *Revisions Response : Reviewed By: Val Christensen Review Date: 05/04/2018 Plan Review Details tawnya.grover@rexburg.org Planning and Zoning Review - Site Plan Status: REVISIONS Page 1 of 4 Approval of plans does not constitue approval of variance from code Planning and Zoning Review - Site Plan (Continued) D ESCRIPTIO N CO MMEN TS STATUS Trash dumpster shown and screened & for right-hand truck REVISIONS *Revisions Response : Buffering/landscaping requirements REVISIONSParking lot buffering from adjacent residential properties is not shown on plan. *Revisions Response : Lighting Plan REVISIONSNone shown. *Revisions Response : Architectural design standards REVISIONSThere are no elevations at this time. *Revisions Response : Bldg location, sq ft, dimensions, distance to property lines & between bldgs REVISIONSThe current site plan does not have dimensions. The acreage at 16 units per acre would allow twenty eight dwelling units, thirty two units are identified. The current configuration of the buildings and the parking would require that there be one ownership for the entire project unless the units or buildings were condominiums or the project was created as a Planned Unit Development (PUD). *Revisions Response : Parking space sizes REVISIONSThere are no dimensions provided. *Revisions Response : Parking aisle widths REVISIONSThere are no dimensions provided. *Revisions Response : Parking lot handicapped requirements REVISIONSThree spaces are required. *Revisions Response : Show existing and proposed easements N/ASee public works comments. Legal desciption of proposed building site included N/AGIS will check the description at zone change. Design standards Committee meeting held N/A Check conditional use permit N/A Plans are approved for a footing/foundation ONLY permit? N/A Street profile N/ASee public works comments. Page 2 of 4 Approval of plans does not constitue approval of variance from code Planning and Zoning Review - Site Plan (Continued) D ESCRIPTIO N CO MMEN TS STATUS Easements N/A Addressable COMPLETED Parking space number COMPLETED Clear site triangle COMPLETED Amount of Permeable vs. Non-Permeable Surface COMPLETED No utility boxes in right of way?Utility boxes and transformers are not shown on plans. They are not allowed in right-of-way and if they are in the front yard or can be seen from parking lot, they must be buffered. COMPLETED Dumpsters: 1 per 20 Units (non-dorm) or 1 per 50 beds (Dorm)? COMPLETED Streets labeled COMPLETED Use is consistent with zoning designation COMPLETED Compliance with comprehensive plan COMPLETED Flood plain check COMPLETED Plans are to scale COMPLETED North arrow & Streets labeled COMPLETED Building setbacks (front,side,back yards)Buildings are not separated with lot lines. As currently configured, the buildings and the parking would require that there be one ownership for the entire project unless the units or buildings were condominiums or the project was created as a Planned Unit Development (PUD). COMPLETED Building height COMPLETED Unloading, loading area COMPLETED Parking spaces located in close proximity to buildings COMPLETED Sidewalks along right of way access main streets COMPLETED Internal pedestrian walkways per zone COMPLETED Page 3 of 4 Approval of plans does not constitue approval of variance from code Planning and Zoning Review - Site Plan (Continued) D ESCRIPTIO N CO MMEN TS STATUS Snow storage COMPLETED Open/common spaces functional COMPLETED Page 4 of 4 Approval of plans does not constitue approval of variance from code