Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 13-00024 - 850 University Blvd - McDonald'sPermit Inspection Summary Permit Status of (Issue) as of Report Date: 04/24/2018 9:37 am Permit Details Permit Number: 13-00024 McDonald's 850 University Blvd Building - Commercial Permit Issued Date: 07/02/2013 Permit Inspection Statistics 36Total Inspections Completed: 32Total Inspections Passed: Inspection Pass Rate: 88.89% Permit Inspection History *Refer to Individual Inspection Report for more Details 06/04/2013PassQuinton OwensFooting Inspection 06/06/2013PassQuinton OwensFoundation Inspection Ufer installed - #5 bar tied to vertical and 2 additional horiz bars.Inspector Comments: 07/15/2013PassBret StoddardElectrical Rough-in Inspected three days on one ticket. 7/15-Approved to insulate the west wall from the entry to back wall(north), 7/16-Approved for cover exterior walls on south portion and bathrooms, 7/17-Verified ufer connection for electrical service. Inspector Comments: 07/15/2013PassQuinton OwensSheeting 7/8,QO:Roof sheeting/parapet framing approved. 7/15,QO:Exterior wall- hold downs and anchor bolts good. Renail a few missed locations as indicated. Inspector Comments: 07/23/2013PassBret StoddardElectrical Rough-in 08/06/2013PassBret StoddardElectrical Service Inspection Approved to be energized for permanent power.Inspector Comments: Light pole footings (sauna tube) rebar looked good, pre-bent and tied OK to Pout Inspector Comments: 08/06/2013PassQuinton OwensFooting Inspection 8/6,QO: footing inspection for trash enclosure approved. Masonry wall sets right on footing. Rebar as per plans. Inspector Comments: 08/12/2013N/AQuinton OwensRadon-Ground Inspection 8/14,QO:Grease duct welding inspection. All holes fixed at inspection. Ok to wrap. Inspector Comments: 08/23/2013PassQuinton OwensHVAC Rough-in 8/22,QO:Duct on left only has one layer. Duct cleanouts covered on west duct (2ea) 8/23: Duct wrap completed. Inspector Comments: 08/23/2013PassQuinton OwensSuspending Ceiling Inspection No area over 1,000 sf requires no additional seismic bracing. Normal installation approved. Inspector Comments: Page 1 of 3 (Continued) Permit Details Permit Number: 13-00024 McDonald's 850 University Blvd Building - Commercial Permit Status of (Issue) as of Report Date: 04/24/2018 9:37 am Permit Inspection Summary 08/27/2013PassBret StoddardElectrical Rough-in Approved for cover in the ceilings in the kitchen area only by the main cooking equipment. Inspector Comments: 08/29/2013PassBret StoddardElectrical Rough-in Approved to install ceiling tiles in lobby-boxes in ceiling are being made up.Inspector Comments: 08/30/2013PassBret StoddardFire Alarm Final Inspection Approved as a preliminary inspection final-Dale witnessed flow, 39 seconds, 24 hour/5 minute inspection not done. Inspector Comments: 09/04/2013PassDon AllenPlumbing Sewer 09/04/2013PassDon AllenPlumbing Water 09/05/2013PassDale PickeringFire Underground Inspection Underground flush and flow test for 10 minutes. Pito reading was 20psi on 2 1/2" line. Pass. DP Inspector Comments: 09/05/2013PassQuinton OwensBuilding Final 09/05/2013FailQuinton OwensHVAC Final Inspection Gas pressure regulator to vent outside or reinstall in horizontal upright position. (per label) Inspector Comments: 09/05/2013PassBret StoddardElectrical Final Inspection Approved for a temporary final and C.O.-trash compound not done, signs and wiring on roof and for menus not done. Call for a re-inspect when done for a complete final. Inspector Comments: 09/06/2013PassBret StoddardFire Alarm Final Inspection Approved for a final and C.O.-fire alarm only, witnessed fan shut down and monitoring for two large roof top units, flow switch and tamper switch operation witnessed (8/30), 24 hour/ 5 minute test at 9:21AM 9/3 and AC power restored at 9:50AM on 9/4. Report in file. Inspector Comments: 09/10/2013PassQuinton OwensHVAC Final Inspection gas regulator was reinstalled in horizontal, upright position.Inspector Comments: 09/11/2013PassDon AllenPlumbing Underground Inspection All good to cover the under groundInspector Comments: 09/11/2013PassDon AllenPlumbing Rough-in All good to cover the rough inInspector Comments: 09/18/2013PassDon AllenHVAC Rough-in 09/23/2013PassDale PickeringFire Sprinkler Rough-in 09/25/2013PassTed DyeFraming/Structure Inspection OK to hang drywallInspector Comments: 09/25/2013PassTed DyeInsulation Inspection Page 2 of 3 (Continued) Permit Details Permit Number: 13-00024 McDonald's 850 University Blvd Building - Commercial Permit Status of (Issue) as of Report Date: 04/24/2018 9:37 am Permit Inspection Summary 09/25/2013PassTed DyeSheetrock/Drywall Inspection 10/03/2013PassDon AllenPlumbing Final Inspection 10/04/2013FailJoel GrayPublic Works Final Inspection 10/07/2013PassNatalie PowellPlanning and Zoning Final Inspection 12/19/2013PassJohn MillarPublic Works Final Inspection 12/19/2013PassDale PickeringFire Sprinkler Final Inspection 12/23/2013PassBret StoddardElectrical Final Inspection Approved for a final and C.O.-trash enclosure building completed.Inspector Comments: 03/09/2016PassJoel GraySidewalk Inspection Page 3 of 3