Loading...
HomeMy WebLinkAboutRESCHECK - 14-00539 - 260 Baldwin Dr - SFRREScheck Software Version 4,6.0 14 260 Baldwin n Dr39 ive -SFR Compliance Certificate Office Copy (1 of 2) Project Kartchner %88 Energy Code: 2009 IECC Location: Construction Type: Idaho Falls, Idaho Project Type: Single-family Conditioned Floor Area: New Construction Glazing Area 2,347 ft2 11% Climate Zone: 6 (7918 HDD) Permit Date: 11-10.14 Permit Number: 0.057 Construction Site: 3758 Yellowstones Hwy OWner/Agent: Designer/Contractor: Idaho Falls, Id 83401 Cody Puzey High Country Heating 3758 Yellowstones Hwy High Country Heating Idaho Falls, Id 83401 P 208-529-2116 .O. Box 627 Rigby, Id 83442 208-745-8056 Nghcountryhtg@g maiI.com • h cPI 0TM UA 298 Your UA. 298 The %Better Or Worse Thso code Index MIeRe how close IO C It ONES NOT Provide an eshoor, or eneryy use or Coo Mative M e roinnonlode M1omese0 on cotle tratle-off roles. Envelope Assemblies Wall 1: Wood Frame, 16" o.c. Door 1: Solid Window 1: Other:Double Pane with Low -E Wall 2: Wood Frame, 16" o.c. Door 1: Solid Window 1: Other:Double Pane with Low -E Wall 3: Wood Frame, 16" o.c. Door 1: Solid Window 1: Other:Double Pane with Low -E Wall 4: Wood Frame, 16" N.C. Window 1: Other:Double Pane with Low -E Basement Wall 1: Solid Concrete or Masonry Wall height: 8.0' Depth below grade: 4.0' Insulation depth: 8.0' Window 1: Other:Double Pane with Low -E 492 21.0 0.0 0.057 24 21 0.290 6 50 0.300 15 384 21.0 0.0 0.057 19 21 0.290 6 25 0.300 8 492 21.0 0.0 0.057 25 21 0.290 6 25 0.300 8 384 21.0 0.0 0.057 20 25 0.300 8 244 19.0 0.0 0.054 12 20 0.340 rmlecr O:Ie: Rancnner SF2BB Report date: 11/14/14 Data filename: C:\Users\OWNER\AppData\Local\Check\REScheck\FS2B8 Raleigh Right.rck Page 1 of 8 Wall height: 8.0' Depth below grade: 4.0' Insulation depth: 8.0' Window 1: Other:Double Pane with Low -E Basement Wall 3: Solid Concrete or Masonry Wall height: B.0' Depth below grade: 4.0' Insulation depth: 8.0' Basement Wall 4: Solid Concrete or Masonry Wall height: 8.0' Depth below grade: 4.0' Insulation depth: 8.0' Wind 1'0th 228 19.0 0.0 0.054 11 20 0.340 7 272 19.0 0.0 0.054 15 220 19.0 0.0 0.054 30 ow . er.Double Pane with Low -E 40 0.340 14 Floor 1: All -Wood JoisVimss:Over Unconditioned Space 330 19.0 0.0 0.047 16 Ceiling 1: Flat Ceiling or Scissor Truss 2,347 50.0 0.0 0.026 61 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.6.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name - Title Signature Date Project Notes: Job Number: 51259 Project title: Kartchner SF2B8 Report date: 11/14/14 Data filename: C:\Users\OWNER\AppData\Local\Check\REScheck\FS2138 Raleigh Right.rck Page 2 of 8 0 REScheck Software Version 4.6.0 Inspection Checklist NX` Energy Code: 2009 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. section # Pre-Inspectfonrylan Review Plans Verified Value Field Verified Value �ompllesT Comments/Assumptions & Req.ID 103.2 Construction drawings and OComplies [PRll' documentation demonstrate Oboes Not energy code compliance for the building envelope. ONot Observable ONot Applicable 103 .2, 'Construction drawings and []Complies 403.1 documentation demonstrate []Does Not [PR311 energy code compliance for 8 lighting and mechanical systems. ❑Not Observable Systems serving multiple ❑Not Applicable dwelling units must demonstrate compliance with the commercial code. 403.6 Heating and cooling equipment is Heating: Heating: OComplies (PR21' sized per ACCA Manual S based Btu/hr_ Btu/hr_ ❑Does Not 46 'on loads per ACOA Manual J or approved methods. Cooling: Cooling: ]Not Observable ,:other Btu/hr_ Btu/hr— EJNot Applicable Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Kartchner SF286 Report date: 11/14/14 Data filename: C:\Usem\OWNERWppData\Local\Check\RESchecktFS2BB Raleigh Right.rck Page 3 of 8 Section # Fountletlon Inspection plans Verified Value Field Verified Value Complies? Comments/Assumptions B Re .ID 402.1.1 Conditioned basement wall R- R. OComplies See the Envelope assemblies IF0411 insulation R-value. Where interior ODoes Not table for values. insulation is used, verification may need to occur during ONot Observable Insulation Inspection. Not ONot Applicable required in warm-humid locations in Climate Zone 3. 303.2 Conditioned basement wall OComplies [F0511 insulation installed per OCom Not e, manufacturer's instructions. []Not Observable []Not Applicable 402.2.7 Condition mburial l ft ft OComplies see the Envelope Assemblies [FO61r depth insulation depth of burial or ODoes Not table for values. distance from top of wall. []Not Observable ONot Applicable 303.2.1 A protective covering is installed OComplies [FO1112 to protect exposed exterior Oboes Not U, insulation and extends a minimum of 6 in. below grade. ONot Observable ONot Applicable Snow. and ice-melting system OComplies r4003.8 2]' controls installed. ODoes Not []Not Observable ONot Applicable Additional Comments/Assumptions: 1 High Impact (Tier 11 2 Medium Impact (Tier 2) 3 Law Impact (Tier 31 Project Title: Kartchner SF2BB Report date: 11/14/14 Data filename: C:Wsems OWNER\AppData\Local\Check\REScheck\FS2B8 Raleigh Right.rck Page 4 of 8 Section #Framing / Rough -In Inspection Flans Verified Value Field Verified Value Complies? Comments/Assum Ions PC 6 Req.ID 402.1.1, Door U -factor. U-_ U-_ OCompiies See the Envelope Assemblies 402.3.4 ODoes Not table for values. FR111 p ONot Observable ONot Applicable 402.1.1, Glazing U -factor (area -weighted U-_ U-_ OComplies See the Envelope Assemblies 402.3.1, average). ODoes Not table nor values. 402.3.3, 402.5 ONot Observable [FR2]1 ONot Applicable A 303.1.3 U -factors of fenestration products []Complies [FR411 are determined in accordance ODoes Not with the NFRC test procedure or taken from the default table. ONot Observable ONot Applicable 402.4. Fenestration that is not site built OComplies [FR20]1 is listed and labeled as meeting [-]Does Not AAMAANDMA/CSA 101/1.5.2/A440 or has infiltration rates per NFRC [-]Not Observable 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC -rated recessed lighting fixtures OComplies [FR16]2 sealed at housing/! manor finish ODoes Not and labeled to indicate ,2.0 ctm leakage at 75 Pa. ❑Nat Observable ❑Not Applicable 403.2.1 Supply ducts in attics are R-_ R- OCo [FR12F insulated to aR -8. All other ducts R R- ODoes Not Not ot in unconditioned spaces or — outside the building envelope are []Not Observable insulated to alk -6. []Not Applicable 403.2.2 All joints and seams af air ducts, OComplies [FR13]1 air handlers, filter boxes, and Oboes Not Y building cavities used as return ducts are sealed. ONot Observable ONot Applicable 403.2.3 Building cavities are not used for OComplies [FR15P supply ducts. ODoes Not 40 [-]Not Observable ONot Applicable 403.3 HVAC piping conveying fluids R- R- OComplies [FR1712 above 105 aF or chilled fluids ODoes Not ffi below 55 QF are insulated to -R- 3. ONot Observable ONot Applicable 403.4 Circulating service hot water R- R- OCom lies [FA18]1 pipes are insulated to R-2. Oboes Not []Not Observable ONot Applicable 403.5 Automatic or gravity dampers are. OCom plies [FR19F installed on all outdoor air Oboes Not intakes and exhausts. ONot Observable _ ONot Applicable Comments/Assumptions: 1 High Impact (Tier 1) 2 I Medium Impact [r'er 2) 3 L I D t (Tia 3) Project Title: Kartchner SF2B8 Reportdate: 11/14/14 Data filename: C:\Users\OWNER\AppData\Local\Check\REScheck\FS2B8 Raleigh Right.rck Page 5 of 8 Section # Insulation Inspection plans Verifted value Field Verified Value Compiles? Comments/Assumpilons & Req.ID 303.1 All installed insulation is labeled QComplies [I14131t .,the installed R -values QDoes Not 0 provided. QNot Observable QNot Applicable 402.1.1, Floor insulation R -value. R- R. QComplies See the Envelope Assemblies 402.2.5, ElWood Q Wood []Does Not table hr values. 402.2.6 [INlp ❑ Steel Q Steel QNot Observable QNot Applicable 303.2, Floor insulation installed per QComplies 402.2.6 manufacturer's instructions, and QDoes Not [I1,1211 in substantial contact with the 0 underside of the subfloor. QNot Observable QNot Applicable 402.1.1, Wall Insulation R -value. If this is a R- R-_ QComplies See the Ema1ppe Assemdies 402.2.4, mass wall with at least h of the Q Wood Q Wood QDoes Not table for values. 402.2.5 [IN31- wall insulation on the wall exterior, the exterior Insulation Mass Q Mass El Not Observable 0 requirement applies. ❑ Steel Q Steel ❑Not Applicable 303.2 Wall insulation is installed per QComplies [I1,141° manufacturer's instructions. QDoes Not QNot Observable QNot Applicable Comments/Assumptions: 1 High Impact Mier 11 2 Medium Impact (T'er 21 3 lnw Imnan irar a Project Title: Kartchner SF2BB Report date: 11/14/14 Data filename: C:\Users\OWNERWppData\Local\Check\RESCheck\FS2B8 Raleigh Right.rck Page 6 of 8 Section # Final Inspection Provisions Plans Verifietl value Field Verlfletl Value Complies? Comments/Assumptions 6 Req.ID 402.1.1, Ceiling insulation R -value. Where R- R- OComplies See Me Envelope Assemblies 402.2.1, > R-30 is required, R-30 can be O Wood Wood CDoes Not table for values, 402.2.2 [Fill' used if insulation is not compressed at eaves. R-30 may Steel ❑Steel ONot Observable y be used for 500 ft2 or 20% ONot Applicable (whichever is less) where sufficient space is not available. 303.1.1.1, Ceiling insulation installed per OComplies 303.2 manufacturer's instructions. CDoes Not [F1211 Blown insulation marked every �. 300 W. DNot Observable ONot Applicable 402.2.3 Attic access hatch and door R- R- []Complies p [F1311 insulation s:R-value of the []Does Not 40 adjacent assembly. ONot Observable ONot Applicable 402.4.2, Building envelope tightness ACH 50 =_ ACH 50=_ OComplies 402.4.2.1 verified by blower door test result []Does Not [F11711 of <7 ACH at 50 Pa. This 0 requirement may instead be met []Not Observable via visual inspection, in which ONot Applicable case verification may need to occur during Insulation Inspection. 403.2.2 Post construction duct tightness cfm cfm OCom Iles [FI411 test result of sB dm to outdoors, ODoes Not or <12 cfm across systems. Or, rough -in test result of s6 cfm ONot Observable across systems or s4 cfm ONot Applicable without air handler. Rough -in test verification may need to occur during Framing Inspection. 403.1.1 Programmable thermostats OComplies [Fig] .installed on forced air furnaces. []DOES Not A []Not Observable ONot Applicable 403,1.2 Heat pump thermostat Installed OCompNot [FI10]2 on heat pumps. ODoes Not ONot Observable ONot Applicable 403.4 Circulating service hot water OComplies [Fill]1 ',systems have automatic or CDoes Not 41 accessible manual controls. ONot Observable ONot Applicable 404.1 50% of lamps in permanent OCom lies [FI61l fixtures are high efficacy lamps. Copes No b ❑Not Observable ONot Applicable 401.3 Compliance certificate posted. OComplies [FI712 ODoes Not J% ❑Not Observable ONot Applicable 303.3 Manufacturer manuals for OComplies [1`I18j' mechanical and water heating []Does Not equipment have been provided. ONot Observable ONot Applicable j comments/assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 21 3 Low Impact (Tier 31 Project Title: Kartchner SF2138 Report date: 11/14/14 Data filename: C:\Users\OWNER\AppData\Local\Check\REScheck\FS2B8 Raleigh Right.rck Page 7 of 8 1 High Impact (Tier 11 2 Medium Impact (Tier 21 3 Low ImDatt ITier 31 Project Title: Kartchner SF2BB Reportdate: 11/14/14 Data filename: C\Usem\OWNER�pppData\Local\Check\REScheck\F52B8 Raleigh Right.rck Page 8 of 8 N0 2009 IECC Energy Efficiency Certificate Above -Grade Wall 21.00 Below -Grade Wall 19.00 Floor 19.00 Ceiling / Roof 50.00 Ductwork (unconditioned spaces): Glass & Door - Window 0.30 0.32 Door 0.29 Heating & Cooling Equipment Effirwricy Heating System: _ Cooling System: Water Heater: Name: Date: Comments