HomeMy WebLinkAboutRESCHECK - 14-00539 - 260 Baldwin Dr - SFRREScheck Software Version 4,6.0 14
260 Baldwin n Dr39 ive -SFR
Compliance Certificate Office Copy (1 of 2)
Project Kartchner %88
Energy Code:
2009 IECC
Location:
Construction Type:
Idaho Falls, Idaho
Project Type:
Single-family
Conditioned Floor Area:
New Construction
Glazing Area
2,347 ft2
11%
Climate Zone:
6 (7918 HDD)
Permit Date:
11-10.14
Permit Number:
0.057
Construction Site:
3758 Yellowstones Hwy OWner/Agent: Designer/Contractor:
Idaho Falls, Id 83401 Cody Puzey High Country Heating
3758 Yellowstones Hwy High Country Heating
Idaho Falls, Id 83401 P
208-529-2116 .O. Box 627
Rigby, Id 83442
208-745-8056
Nghcountryhtg@g maiI.com
• h cPI 0TM UA 298 Your UA. 298
The %Better Or Worse Thso code Index MIeRe how close IO C
It ONES NOT Provide an eshoor, or eneryy use or Coo Mative M e roinnonlode M1omese0 on cotle tratle-off roles.
Envelope Assemblies
Wall 1: Wood Frame, 16" o.c.
Door 1: Solid
Window 1: Other:Double Pane with Low -E
Wall 2: Wood Frame, 16" o.c.
Door 1: Solid
Window 1: Other:Double Pane with Low -E
Wall 3: Wood Frame, 16" o.c.
Door 1: Solid
Window 1: Other:Double Pane with Low -E
Wall 4: Wood Frame, 16" N.C.
Window 1: Other:Double Pane with Low -E
Basement Wall 1: Solid Concrete or Masonry
Wall height: 8.0'
Depth below grade: 4.0'
Insulation depth: 8.0'
Window 1: Other:Double Pane with Low -E
492
21.0
0.0
0.057
24
21
0.290
6
50
0.300
15
384
21.0
0.0
0.057
19
21
0.290
6
25
0.300
8
492
21.0
0.0
0.057
25
21
0.290
6
25
0.300
8
384
21.0
0.0
0.057
20
25
0.300
8
244
19.0
0.0
0.054
12
20
0.340
rmlecr O:Ie: Rancnner SF2BB Report date: 11/14/14
Data filename: C:\Users\OWNER\AppData\Local\Check\REScheck\FS2B8 Raleigh Right.rck Page 1 of 8
Wall height: 8.0'
Depth below grade: 4.0'
Insulation depth: 8.0'
Window 1: Other:Double Pane with Low -E
Basement Wall 3: Solid Concrete or Masonry
Wall height: B.0'
Depth below grade: 4.0'
Insulation depth: 8.0'
Basement Wall 4: Solid Concrete or Masonry
Wall height: 8.0'
Depth below grade: 4.0'
Insulation depth: 8.0'
Wind 1'0th
228
19.0
0.0
0.054
11
20
0.340
7
272
19.0
0.0
0.054
15
220
19.0
0.0
0.054
30
ow . er.Double Pane with Low -E 40 0.340 14
Floor 1: All -Wood JoisVimss:Over Unconditioned Space 330 19.0 0.0 0.047 16
Ceiling 1: Flat Ceiling or Scissor Truss 2,347 50.0 0.0 0.026 61
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version 4.6.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name - Title Signature Date
Project Notes:
Job Number: 51259
Project title: Kartchner SF2B8 Report date: 11/14/14
Data filename: C:\Users\OWNER\AppData\Local\Check\REScheck\FS2138 Raleigh Right.rck Page 2 of 8
0 REScheck Software Version 4.6.0
Inspection Checklist
NX` Energy Code: 2009 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
section
#
Pre-Inspectfonrylan Review
Plans Verified
Value
Field Verified
Value
�ompllesT
Comments/Assumptions
& Req.ID
103.2
Construction drawings and
OComplies
[PRll'
documentation demonstrate
Oboes Not
energy code compliance for the
building envelope.
ONot Observable
ONot Applicable
103 .2, 'Construction
drawings and
[]Complies
403.1
documentation demonstrate
[]Does Not
[PR311
energy code compliance for
8
lighting and mechanical systems.
❑Not Observable
Systems serving multiple
❑Not Applicable
dwelling units must demonstrate
compliance with the commercial
code.
403.6
Heating and cooling equipment is
Heating:
Heating:
OComplies
(PR21'
sized per ACCA Manual S based
Btu/hr_
Btu/hr_
❑Does Not
46 'on
loads per ACOA Manual J or
approved methods.
Cooling:
Cooling:
]Not Observable
,:other
Btu/hr_
Btu/hr—
EJNot Applicable
Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Kartchner SF286 Report date: 11/14/14
Data filename: C:\Usem\OWNERWppData\Local\Check\RESchecktFS2BB Raleigh Right.rck Page 3 of 8
Section
#
Fountletlon Inspection
plans Verified
Value
Field Verified
Value
Complies?
Comments/Assumptions
B Re .ID
402.1.1
Conditioned basement wall R-
R. OComplies
See the Envelope assemblies
IF0411
insulation R-value. Where interior
ODoes Not
table for values.
insulation is used, verification
may need to occur during
ONot Observable
Insulation Inspection. Not
ONot Applicable
required in warm-humid locations
in Climate Zone 3.
303.2
Conditioned basement wall
OComplies
[F0511
insulation installed per
OCom Not
e,
manufacturer's instructions.
[]Not Observable
[]Not Applicable
402.2.7
Condition
mburial l ft
ft OComplies
see the Envelope Assemblies
[FO61r
depth
insulation depth of burial or
ODoes Not
table for values.
distance from top of wall.
[]Not Observable
ONot Applicable
303.2.1
A protective covering is installed
OComplies
[FO1112
to protect exposed exterior
Oboes Not
U,
insulation and extends a
minimum of 6 in. below grade.
ONot Observable
ONot Applicable
Snow. and ice-melting system
OComplies
r4003.8
2]'
controls installed.
ODoes Not
[]Not Observable
ONot Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 11 2 Medium Impact (Tier 2) 3 Law Impact (Tier 31
Project Title: Kartchner SF2BB Report date: 11/14/14
Data filename: C:Wsems OWNER\AppData\Local\Check\REScheck\FS2B8 Raleigh Right.rck Page 4 of 8
Section
#Framing
/ Rough -In Inspection
Flans Verified
Value
Field Verified
Value
Complies?
Comments/Assum Ions
PC
6 Req.ID
402.1.1,
Door U -factor.
U-_ U-_
OCompiies
See the Envelope Assemblies
402.3.4
ODoes Not
table for values.
FR111
p
ONot Observable
ONot Applicable
402.1.1,
Glazing U -factor (area -weighted
U-_ U-_
OComplies
See the Envelope Assemblies
402.3.1,
average).
ODoes Not
table nor values.
402.3.3,
402.5
ONot Observable
[FR2]1
ONot Applicable
A
303.1.3
U -factors of fenestration products
[]Complies
[FR411
are determined in accordance
ODoes Not
with the NFRC test procedure or
taken from the default table.
ONot Observable
ONot Applicable
402.4.
Fenestration that is not site built
OComplies
[FR20]1
is listed and labeled as meeting
[-]Does Not
AAMAANDMA/CSA 101/1.5.2/A440
or has infiltration rates per NFRC
[-]Not Observable
400 that do not exceed code
❑Not Applicable
limits.
402.4.5
IC -rated recessed lighting fixtures
OComplies
[FR16]2
sealed at housing/! manor finish
ODoes Not
and labeled to indicate ,2.0 ctm
leakage at 75 Pa.
❑Nat Observable
❑Not Applicable
403.2.1
Supply ducts in attics are
R-_ R-
OCo
[FR12F
insulated to aR -8. All other ducts
R R-
ODoes Not Not
ot
in unconditioned spaces or
—
outside the building envelope are
[]Not Observable
insulated to alk -6.
[]Not Applicable
403.2.2
All joints and seams af air ducts,
OComplies
[FR13]1
air handlers, filter boxes, and
Oboes Not
Y
building cavities used as return
ducts are sealed.
ONot Observable
ONot Applicable
403.2.3
Building cavities are not used for
OComplies
[FR15P
supply ducts.
ODoes Not
40
[-]Not Observable
ONot Applicable
403.3
HVAC piping conveying fluids
R- R-
OComplies
[FR1712
above 105 aF or chilled fluids
ODoes Not
ffi
below 55 QF are insulated to -R-
3.
ONot Observable
ONot Applicable
403.4
Circulating service hot water
R- R- OCom lies
[FA18]1
pipes are insulated to R-2.
Oboes Not
[]Not Observable
ONot Applicable
403.5
Automatic or gravity dampers are.
OCom plies
[FR19F
installed on all outdoor air
Oboes Not
intakes and exhausts.
ONot Observable
_
ONot Applicable
Comments/Assumptions:
1 High Impact (Tier 1) 2 I Medium Impact [r'er 2) 3 L I D t (Tia 3)
Project Title: Kartchner SF2B8 Reportdate: 11/14/14
Data filename: C:\Users\OWNER\AppData\Local\Check\REScheck\FS2B8 Raleigh Right.rck Page 5 of 8
Section
#
Insulation Inspection
plans Verifted
value
Field Verified
Value
Compiles?
Comments/Assumpilons
& Req.ID
303.1
All installed insulation is labeled
QComplies
[I14131t
.,the installed R -values
QDoes Not
0
provided.
QNot Observable
QNot Applicable
402.1.1,
Floor insulation R -value.
R-
R.
QComplies
See the Envelope Assemblies
402.2.5,
ElWood
Q Wood
[]Does Not
table hr values.
402.2.6
[INlp
❑ Steel
Q Steel
QNot Observable
QNot Applicable
303.2,
Floor insulation installed per
QComplies
402.2.6
manufacturer's instructions, and
QDoes Not
[I1,1211
in substantial contact with the
0
underside of the subfloor.
QNot Observable
QNot Applicable
402.1.1,
Wall Insulation R -value. If this is a
R-
R-_
QComplies
See the Ema1ppe Assemdies
402.2.4,
mass wall with at least h of the
Q Wood
Q Wood
QDoes Not
table for values.
402.2.5
[IN31-
wall insulation on the wall
exterior, the exterior Insulation
Mass
Q Mass
El Not Observable
0
requirement applies.
❑ Steel
Q Steel
❑Not Applicable
303.2
Wall insulation is installed per
QComplies
[I1,141°
manufacturer's instructions.
QDoes Not
QNot Observable
QNot Applicable
Comments/Assumptions:
1 High Impact Mier 11 2 Medium Impact (T'er 21 3 lnw Imnan irar a
Project Title: Kartchner SF2BB Report date: 11/14/14
Data filename: C:\Users\OWNERWppData\Local\Check\RESCheck\FS2B8 Raleigh Right.rck Page 6 of 8
Section
#
Final Inspection Provisions
Plans Verifietl
value
Field Verlfletl
Value
Complies?
Comments/Assumptions
6 Req.ID
402.1.1,
Ceiling insulation R -value. Where
R- R-
OComplies See Me Envelope Assemblies
402.2.1,
> R-30 is required, R-30 can be
O Wood Wood
CDoes Not table for values,
402.2.2
[Fill'
used if insulation is not
compressed at eaves. R-30 may
Steel ❑Steel
ONot Observable
y
be used for 500 ft2 or 20%
ONot Applicable
(whichever is less) where
sufficient space is not available.
303.1.1.1,
Ceiling insulation installed per
OComplies
303.2
manufacturer's instructions.
CDoes Not
[F1211
Blown insulation marked every
�.
300 W.
DNot Observable
ONot Applicable
402.2.3
Attic access hatch and door
R- R-
[]Complies
p
[F1311
insulation s:R-value of the
[]Does Not
40
adjacent assembly.
ONot Observable
ONot Applicable
402.4.2,
Building envelope tightness
ACH 50 =_ ACH 50=_
OComplies
402.4.2.1
verified by blower door test result
[]Does Not
[F11711
of <7 ACH at 50 Pa. This
0
requirement may instead be met
[]Not Observable
via visual inspection, in which
ONot Applicable
case verification may need to
occur during Insulation
Inspection.
403.2.2
Post construction duct tightness
cfm cfm
OCom Iles
[FI411
test result of sB dm to outdoors,
ODoes Not
or <12 cfm across systems. Or,
rough -in test result of s6 cfm
ONot Observable
across systems or s4 cfm
ONot Applicable
without air handler. Rough -in test
verification may need to occur
during Framing Inspection.
403.1.1
Programmable thermostats
OComplies
[Fig] .installed
on forced air furnaces.
[]DOES Not
A
[]Not Observable
ONot Applicable
403,1.2
Heat pump thermostat Installed
OCompNot
[FI10]2
on heat pumps.
ODoes Not
ONot Observable
ONot Applicable
403.4
Circulating service hot water
OComplies
[Fill]1 ',systems
have automatic or
CDoes Not
41
accessible manual controls.
ONot Observable
ONot Applicable
404.1
50% of lamps in permanent
OCom lies
[FI61l
fixtures are high efficacy lamps.
Copes No
b
❑Not Observable
ONot Applicable
401.3
Compliance certificate posted.
OComplies
[FI712
ODoes Not
J%
❑Not Observable
ONot Applicable
303.3
Manufacturer manuals for
OComplies
[1`I18j'
mechanical and water heating
[]Does Not
equipment have been provided.
ONot Observable
ONot Applicable j
comments/assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 21 3 Low Impact (Tier 31
Project Title: Kartchner SF2138 Report date: 11/14/14
Data filename: C:\Users\OWNER\AppData\Local\Check\REScheck\FS2B8 Raleigh Right.rck Page 7 of 8
1 High Impact (Tier 11 2 Medium Impact (Tier 21 3 Low ImDatt ITier 31
Project Title: Kartchner SF2BB Reportdate: 11/14/14
Data filename: C\Usem\OWNER�pppData\Local\Check\REScheck\F52B8 Raleigh Right.rck Page 8 of 8
N0 2009 IECC Energy
Efficiency Certificate
Above -Grade Wall 21.00
Below -Grade Wall
19.00
Floor
19.00
Ceiling / Roof
50.00
Ductwork (unconditioned spaces):
Glass & Door -
Window 0.30 0.32
Door 0.29
Heating & Cooling Equipment Effirwricy
Heating System: _
Cooling System:
Water Heater:
Name: Date:
Comments