Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 14-00473 - 374 Eagle Summit - Cooper Twin HomePermit Inspection Summary Permit Status of (Open) as of Report Date: 04/18/2018 10:16 am Permit Details Permit Number: 14-00473 374 Eagle Summit - Cooper Twin Home 374 Eagle Summit Building - Single Family Residence Permit Issued Date: 10/28/2014 Permit Inspection Statistics 25Total Inspections Completed: 17Total Inspections Passed: Inspection Pass Rate: 68.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 10/30/2014PassTed DyeResidential Footing Inspection 11/03/2014PassTed DyeFoundation Inspection 03/27/2015FailTed DyeCommercial Framing/Structure Inspection 03/31/2015FailTed DyeCommercial Framing/Structure Inspection 04/02/2015PassTed DyeCommercial Framing/Structure Inspection All corrections madeInspector Comments: 04/10/2015Pass Residential Insulation Inspection 04/15/2015FailTed DyeResidential Sheetrock/Drywall Inspection 04/17/2015PassTed DyeCommercial Sheetrock/Drywall Inspection 04/27/2015PassTed DyeResidential Sheetrock/Drywall Inspection 09/22/2015FailTed DyeResidential Building Final 10/09/2015PassTed DyeResidential Building Final 11/04/2015FailTed DyeResidential Building Final Electrical Inspection Type 01/20/2015PassBret StoddardResidential Electrical Service Inspection 03/27/2015PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in 09/10/2015FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection 09/24/2015PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection 11/03/2015FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 14-00473 374 Eagle Summit - Cooper Twin Home 374 Eagle Summit Building - Single Family Residence Permit Status of (Open) as of Report Date: 04/18/2018 10:16 am Permit Inspection Summary Mechanical Inspection Type 03/18/2015PassDon AllenHVAC Rough-in Good to cover the mechanical roughinInspector Comments: 09/23/2015FailDon AllenHVAC Final Inspection need to have the fire place turned on. need to find the heat vent in the middle brdroom in the basement. Inspector Comments: 10/09/2015PassDon AllenHVAC Final Inspection GOOD FOR THE C/OInspector Comments: Plumbing Inspection Type 11/10/2014PassDon AllenPlumbing Sewer All good to cover the sewer line on the west side of the lot.Inspector Comments: 11/12/2014PassDon AllenPlumbing Underground Inspection All good to cover the plumbing ground workInspector Comments: 11/21/2014PassDon AllenPlumbing Water Water meter looks good. Will check final grade of the meter at the final of the jobInspector Comments: 04/01/2015PassDon AllenPlumbing Rough-in Good to cover the plumbing rough inInspector Comments: 09/23/2015PassDon AllenPlumbing Final Inspection good for the c/oInspector Comments: Page 2 of 2