Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ELEVATIONS EAST/NORTH - 17-00626 - 1175 W Main St - Valley Wide - Addition & Remodel
20 8 . 5 7 8 . 5 2 2 6 jc o n e @ j a y c o n e a r c h i t e c t u r e . c o m ww w . j a y c o n e a r c h i t e c t u r e . c o m DATE Job: Date: Scale: Drawn: REV. Date: Seal: DATEREV. 3/7/18Misc. 3/19/18Site 4/2/18Site 4/3/18Trash 4/13/18Roofs # EE-1 Issue: 4/13/2018 AS NOTED IF THE ABOVE DIMENSION DOES NOT MEASURE ONE INCH (1") EXACTLY, THIS DRAWING HAS BEEN ENLARGED OR REDUCED, AFFECTING ALL LABELED SCALES. 1" ACTUAL JC BUILDING PERMIT # IF THE ABOVE DIMENSION DOES NOT MEASURE ONE INCH (1") EXACTLY, THIS DRAWING HAS BEEN ENLARGED OR REDUCED, AFFECTING ALL LABELED SCALES. FA R M ST O R E RE M O D E L Va l l e y Wi d e Co o p e r a t i v e 11 7 5 We s t Ma i n St r e e t Re x b u r g Id a h o Jan. 16, 2018 1 2 3 4 5 © JAY CONE ARCHITECTURE P.C. EXPRESSLY RESERVES COMMON LAW COPY RIGHT AND OTHER PROPERTY RIGHTS FOR THESE PLANS. THESE PLANS ARE NOT TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER. NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING EXPRESS WRITTEN PERMISSION AND CONSENT FROM JAY CONE ARCHITECTURE PC. New illuminated sign New windows. Remove (E) decorative door trim and complete (E) wainscot to match.(E) stucco. To be painted. (E) wainscot to remain. Clean and repair as Req. New Vestibule at North. New Vestibule at East. (E) roof and walls. (E) faux door trim. (E) walls to be painted. EF-1 EF-2EF-1 EF-7 5 27 ' Ma i n Bu i l d i n g 30 ' - 6 " Cu p p o l a (E) roof and walls. New vestibule at East. (E) stucco to be painted. Remove (E) windows. Infill to match (E) wall. (E) walls to be painted. ADDITION EF-2 EF-2 EF-1 EF-1 EF-8 EF-1 EF-1 EF-1 EF-1 EF-1 MANUF.MODEL #FINISH COLORTYPE EXTERIOR FINISH SCHEDULE EF-1 STAIN EF-2 EF-3 EF-4 EF-5 SIDING FLASHING EF-6 METAL SALES BAKED ENAMEL-- 1. Provide order list to Arch. for review. 2. Color and siding/paint samples coordinated w/ Arch. EF-7 EF-8 MK NOTES JAMES HARDIE SMOOTHHARDIPLANK 7.25 SOLID VERIFY SAMPLE W/ ARCH. -- MATCH (E) "ARTISAN SERIES", MITRE CORNERS VERIFY SAMPLE W/ ARCH. STAIN VERIFY SAMPLE W/ ARCH. BEN MOORE HC 69 --SMOOTHGUTTER SNOW CLIPS METAL SALES ---- VERIFY SAMPLE W/ ARCH. FENCE --CHAIN LINK -- GALVANIZED VERIFY SAMPLE W/ ARCH. PAINT MATCH PHILIPS 66 RED------BOLLARDS AND ISLAND TRIM -- --VERIFY IF SLATS ARE TO BE PROVIDED WHITALL BROWN SOLIDBEN MOORE AC 33 MESA VERDE TAN MATCH (E) NOTES: EAST ELEVATION 1/8" = 1'-0" NORTH ELEVATION 1/8" = 1'-0"