HomeMy WebLinkAboutINSPECTION SUMMARY - 13-00326 - 101 E Main - Ace HardwarePermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 04/13/2018 10:12 am
Permit Details Permit Number: 13-00326
Ace Hardware
101 East Main
Building - Commercial
Permit Issued Date: 10/23/2013
Permit Inspection Statistics
60Total Inspections Completed:
41Total Inspections Passed:
Inspection Pass Rate: 68.33%
Permit Inspection History *Refer to Individual Inspection Report for more Details
9/20,QO: Front,Elevator pit, and widened ftgs on west side approved.Inspector Comments:
9/24,QO: East side approved as per plans.Inspector Comments:
10/10,QO: West end of North wall approved. Other footings were existing and
inspected by MTI (need reports)
Inspector Comments:
10-4-13north exterior footing-east looked good. as per plans
west side and pads looked good. as per plans.
Inspector Comments:
10/10/2013PassQuinton OwensFooting Inspection
10-2-13 center footings as per plansInspector Comments:
9/23,QO: Elevator pit foundationInspector Comments:
10/11/2013PassQuinton OwensFoundation Inspection
10/11,QO: West end of North wall. Other fnd existing and tested by MTI (need
reports)
Inspector Comments:
01/10/2014PassBret StoddardElectrical Service Inspection
Approved to be energized for permanent power on both services(2).Inspector Comments:
01/24/2014PassBret StoddardCommercial Electrical Rough-in
Main floor only, per Jane ShawInspector Comments:
02/06/2014PassQuinton OwensSheetrock/Drywall Inspection
02/11/2014PassDon AllenPlumbing Rough-in
Good to cover roughInspector Comments:
02/18/2014PassDon AllenPlumbing Sewer
All good to cover the sewerInspector Comments:
02/18/2014PassDon AllenPlumbing Water
good to cover the waterInspector Comments:
02/18/2014PassDon AllenPlumbing Underground Inspection
good to cover the under groundInspector Comments:
02/18/2014N/AQuinton OwensSuspending Ceiling Inspection
03/07/2014N/AQuinton OwensSidewalk Inspection
03/23/2016FailJoel GrayPublic Works Final Inspection
Storm drain manhole from roof drain has not been raised.Inspector Comments:
Page 1 of 6
(Continued)
Permit Details Permit Number: 13-00326
Ace Hardware
101 East Main
Building - Commercial
Permit Status of (Open) as of Report Date: 04/13/2018 10:12 am
Permit
Inspection
Summary
03/23/2016FailJoel GrayPublic Works Final Inspection
04/04/2016PassDale PickeringFire Department Final Inspection
04/14/2016PassJoel GrayPublic Works Final Inspection
Page 2 of 6
(Continued)
Permit Details Permit Number: 13-00326
Ace Hardware
101 East Main
Building - Commercial
Permit Status of (Open) as of Report Date: 04/13/2018 10:12 am
Permit
Inspection
Summary
Building Inspection Type
10/30/2013PassQuinton OwensFooting Inspection
12/24/2013PassQuinton OwensFoundation Inspection
Rebar - *high concrete slump at beginning of pour (from pump truck start up
"prime"). No special inspections indicated for slab. 6X6 WWF & (2) #4 bars at
perimeter.
*approved with exception.
Inspector Comments:
12/30/2013PassQuinton OwensFoundation Inspection
Rebar (slab on grade) - #4 bars at 24" o.c. each way.
Elevation change at south entry vestibule 4% slope -
door to door, slope increases if landing added to door(s). IBC 1008.1.5 required
to be level, but "floor" is or isn't(?)
Accessible route available in back.
Action Required: Any changes in plans must be addressed EARLIER - NOT
at last minute! -Submit designer's change from 5" to 4" thick slab.
Inspector Comments:
01/02/2014PassQuinton OwensFoundation Inspection
01/03/2014PassQuinton OwensFooting Inspection
Interior spot footings at front and back stairs.Inspector Comments:
1/30: Anchor Bolts needed in bearing walls. Seal holes in fire blocking.Inspector Comments:
1/31: Anchor Bolts installedInspector Comments:
02/05/2014PassQuinton OwensFraming/Structure Inspection
2/5: Fireblocking fixed.Inspector Comments:
Entry mats not in yet (slip resistant). "Paint aisle" to be designated for employees
only (too narrow). Finish Aisle setup. Move Back grab bar in bthrm 6" away from
corner. Walls and partitions within 2 feet of water closets shall have a smooth,
hard, nonabsorbent surface, to a height of 4 feet above the floor. Restroom
identification from main floor area and men's & women's accessible signs at
doors. Special inspection reports needed.
Inspector Comments:
02/24/2014FailQuinton OwensBuilding Final
Some Mechanical roof penetrations. temporarily sealed with silicone. Finish with
proper roofing seal and reinspect. Inspection does not include Upper level, stairs,
elevator or entrances to these areas.
Inspector Comments:
03/06/2014FailQuinton OwensBuilding Final
"Men's & women's" restroom signs meant separate facilities per IBC 2902.2. Who
is submitting the special inspection reports? I don't think I received them all.
TEMPORARY C.O. approved only.
Inspector Comments:
Page 3 of 6
(Continued)
Permit Details Permit Number: 13-00326
Ace Hardware
101 East Main
Building - Commercial
Permit Status of (Open) as of Report Date: 04/13/2018 10:12 am
Permit
Inspection
Summary
05/15/2014FailQuinton OwensFraming/Structure Inspection
No building or mechanical inspections in relation to upstairs finished office &
lobby area have ever been done except for slab on deck.
Inside surface of one stud broken out in room south of roof access. Not all
glazing by stairs is tempered as required. Foam insulation without thermal
protection high on walls.
Plan review in process (first saw plans a couple days ago that were submitted
just last week).
Inspector Comments:
05/20/2014FailQuinton OwensInsulation Inspection
Batt insulation in wall is additional to insulation in concrete wall panels. Windows
are sealed.
Foam insulation at top portion of exterior wall requires a thermal barrier.
Inspector Comments:
05/23/2014PassQuinton OwensCommercial Framing/Structure Inspection
05/29/2014PassQuinton OwensSheetrock/Drywall Inspection
Did not fix broken stud yet on East wall.
5/29 Fixed (Framing approved). Drywall approved for taping. Fire barrier at stairs
not done yet, but will be inspected at building final.
Inspector Comments:
07/01/2014FailQuinton OwensBuilding Final
Upper level: Restroom vertical grab bars not installed. Roof access ladder to be
installed. Fire rate walls under North stairs. Non-absorbant wall finish within 2 ft
of mop sink, 4' high. Missing accessible route to north entrance (where is
Handicap parking - not done per site plan). Thermal protection over foam
insulation required (1/2" drywall or equal)
Inspector Comments:
08/05/2014PassQuinton OwensCommercial Sheetrock/Drywall Inspection
Interior offices drywalled in southwest tenant space. NO FRAMING INSPECTION
REQUESTED.
Inspector Comments:
08/26/2014FailQuinton OwensCommercial Building Final
Partial Final only:
Southwest tenant space final approved.
Inspector Comments:
06/19/2015PassTed DyeCommercial Sheetrock/Drywall Inspection
03/23/2016FailQuinton OwensCommercial Building Final
Suspended ceiling grid is over 1,000 sf in 2 middle units and requires seismic
bracing. Perimeter wires 8" max from walls are missing.
Inspector Comments:
04/15/2016FailQuinton OwensCommercial Building Final
Under stair fire rating inspection only:
Wall cavities not covered by water heater. Several penetrations are not rated and
are too large to use drywall mud (fill with fire caulk or rated foam). Multiple
corners not taped. Light switch cover missing.
Inspector Comments:
Page 4 of 6
(Continued)
Permit Details Permit Number: 13-00326
Ace Hardware
101 East Main
Building - Commercial
Permit Status of (Open) as of Report Date: 04/13/2018 10:12 am
Permit
Inspection
Summary
04/15/2016FailQuinton OwensCommercial Building Final
INSPECTION UNDER STAIRS ONLY:
Several penetrations/gaps are not rated and are too large to use drywall mud (fill
with fire caulk or rated foam). Wall cavities not covered by water heater. Multiple
corners are not taped. Light switch cover missing.
Inspector Comments:
08/23/2016FailQuinton OwensCommercial Building Final
Drywallers covered openings under stairs, but gaps were left open. Please finish
fire rating at gaps.
Inspector Comments:
10/28/2016PassQuinton OwensCommercial Building Final
Inspected with John McMullin present. Corrections made as requested under
north side stairs. Approved for C.O.
Inspector Comments:
Electrical Inspection Type
01/24/2014PassSAUREY AMANDAElectrical Rough-in
02/19/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a partial final in the sales area except the POS areas, need to
inspect for a complete final after Ace moves counters in.
Inspector Comments:
02/24/2014PassBret StoddardCOM-A, COM-R, COM-T Electrical Rough-in
02/24/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O. Ace hardware-lower level only.Inspector Comments:
05/12/2014FailBret StoddardCommercial Electrical Rough-in
05/15/2014PassBret StoddardCommercial Electrical Rough-in
06/19/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
08/01/2014PassBret StoddardCommercial Electrical Rough-in
08/18/2014FailBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
08/27/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
02/13/2015PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
06/16/2015PassBret StoddardCommercial Electrical Rough-in
07/01/2015PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
03/23/2016FailBret StoddardElectrical Final Inspection COM-A,R,T
08/19/2016PassBret StoddardElectrical Final Inspection COM-A,R,T
Page 5 of 6
(Continued)
Permit Details Permit Number: 13-00326
Ace Hardware
101 East Main
Building - Commercial
Permit Status of (Open) as of Report Date: 04/13/2018 10:12 am
Permit
Inspection
Summary
Mechanical Inspection Type
02/03/2014FailQuinton OwensHVAC Rough-in
Rough-in - b-vent off unit heater does not meet clearance requirement. -seal
ducts.
OK gas pressure test done by Don A.
Inspector Comments:
02/05/2014PassQuinton OwensHVAC Rough-in
Rough-in In Reinspect - mech. rough-in approved. for 1st floor and related vents
on upper floor.
Inspector Comments:
02/24/2014PassQuinton OwensHVAC Final Inspection
Mech. units on roof good. gas piping supported. Mechanical roof penetrations
sealed with silicone needs to be sealed with roofing material (noted on bldg final)
Inspection only for main level store area.
Inspector Comments:
06/20/2014PassDon AllenHVAC Final Inspection
All the rooms on the east side of the building on the 2nd floor are all good to
cover the final.
Will need to inspect the west side when complete
Inspector Comments:
08/26/2014PassDon AllenHVAC Final Inspection
Plumbing Inspection Type
02/24/2014FailDon AllenPlumbing Final Inspection
02/25/2014PassDon AllenPlumbing Final Inspection
all good for c\oInspector Comments:
03/06/2014PassDon AllenPlumbing Final Inspection
all good for the c/oInspector Comments:
03/23/2016PassDon AllenPlumbing Final Inspection
Good for the c/oInspector Comments:
Page 6 of 6