Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 13-00093 - 1103 Greenside Loop - SFRPermit Inspection Summary Permit Status of (Open) as of Report Date: 04/12/2018 8:20 am Permit Details Permit Number: 13-00093 Single Family Residential 1103 Greenside Loop Building - Single Family Residence Permit Issued Date: 04/04/2013 Permit Inspection Statistics 19Total Inspections Completed: 13Total Inspections Passed: Inspection Pass Rate: 68.42% Permit Inspection History *Refer to Individual Inspection Report for more Details 04/01/2013PassQuinton OwensFoundation Inspection Not ready as scheduled. Reinspect after noon - Rebar installed per city ordinance.Inspector Comments: 04/05/2013PassTed DyeFooting Inspection Over laps of rebar good rebar held off of ground rebar clean OK to pour Inspector Comments: 04/09/2013PassDon AllenPlumbing Underground Inspection all good to cover the ground workInspector Comments: 05/28/2013PassBret StoddardElectrical Service Inspection Approved to be energized for permanent power-Fall River electric is utility-provider. Inspector Comments: 06/10/2013N/ATed DyeRadon-Ground Inspection 06/24/2013PassBret StoddardElectrical Rough-in Approved for cover-unfinished basement entirely except the bathroom area (for a hot tub). Inspector Comments: 07/01/2013PassDon AllenPlumbing Rough-in All good to cover the rough inInspector Comments: 07/01/2013PassDon AllenHVAC Rough-in All good to cover the rough in Gas presser held at 20#Inspector Comments: 07/08/2013FailTed DyeFraming/Structure Inspection Sheeting approved on walls Roofing sheeting was partialy done OK Framing inspection disapproved: Items are- -Add studs under girder in NW bedroom. -Get approval from truss company where additional rafters are added in front room. -have plans and truss details on site -TJI top cord cut.repair as per TJI experts recommendation. Proved paper work.2 locations in basement in S.East bedroom. Inspector Comments: 07/08/2013FailTed DyeFraming/Structure Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 13-00093 Single Family Residential 1103 Greenside Loop Building - Single Family Residence Permit Status of (Open) as of Report Date: 04/12/2018 8:20 am Permit Inspection Summary 07/15/2013PassBret StoddardSheetrock/Drywall Inspection Approved to begin taping-5/8" type X throughout, garage not sheetrocked other than the common wall with the house. Inspector Comments: 07/16/2013PassTed DyeInsulation Inspection 02/05/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection Approved for a final and C.O.-unfinished basement except bathroom where toilet and shower are installed-finished, no A/C unit installed. Inspector Comments: 02/07/2014FailDon AllenPlumbing Final Inspection need to trim out the main bath tub install the trim on the shower down stairs Inspector Comments: all good for c\oInspector Comments: 02/25/2014PassDon AllenPlumbing Final Inspection all good for c\oInspector Comments: 02/26/2014N/ATed DyeSidewalk Inspection 03/09/2016PassDon AllenHVAC Final Inspection Building Inspection Type 02/25/2014PassTed DyeBuilding Final 2/5/14 - Final - trim out access (to attic) hole Handrail needed on garage steps & landing. CO smote detector need outside bedrooms. Handrail needed on back patio. 1" Clearance around "B" vent. Deck off mail level not complete. Door disables keep until deck complete. Action required: 20 AMP break. Breaker lcok on oven circuit. Inspector Comments: Page 2 of 2