Domus Structural Engineering, LLC
P.O. Box 6986
Broomfield, CO 80021
530‐864‐7055
Domusstructural@gmail.com
To: Blue Raven Solar
1220 S. 630 E. Ste. 430
American Fork, UT. 84003
Subject: Certification Letter
Cooper Residence
682 Stonebridge Street
Rexburg, ID. 83440
To Whom It May Concern,
Design Criteria:
● Applicable Codes = 2015 IBC/IRC, ASCE7‐10, and NDS‐12
● Roof Dead Load = 7 psf (MP1&2)
● Roof Live Load = 20 psf
● Wind Speed = 115 mph, Exposure C
●
● Attachments: (1) 5/16" dia lag screw with 2.5" min embedment depth, at spacing shown above.
Sincerely,
John Calvert, P.E.
Project Engineer
The scope of this report is strictly limited to an evaluation of the fastener attachment, underlying framing and supporting
structure only. The attachment's to the existing structure are required to be in a staggered pattern to ensure proper distribution
of loading. All panels, racking and hardware shall be installed per manufacturer specifications and within specified design
limitations. All waterproofing shall be provided by the manufacturer. Domus Structural Engineering assumes no responsibility for
misuse or improper installation of the solar PV panels or racking.
Please contact me with any further questions or concerns regarding this project.
March 31, 2018
The roof structure of (MP1&2) consists of composition shingle on roof plywood that is supported by pre‐manufactured trusses
that are spaced at @ 24"o.c.. The top chords, sloped at 30 degrees, are 2x4 sections, the bottom chords are 2x4 sections and the
web members are 2x4 sections. The truss members are connected by steel gusset plates. The max unsupported projected
horizontal top chord span is approximately 6'‐0''.
The existing roof framing system of (MP1&2) are judged to be adequate to withstand the loading imposed by the installation of
the solar panels. No reinforcement is necessary. Where required for structural attachments, install vertical blocking for
attachments. See structural drawings for additional information.
Ground Snow Load = 50 psf ‐ Roof Snow Load = 35 psf
The spacing of the solar standoffs should be kept at 48" o.c. for landscape and 48" o.c. for portrait orientation, with a staggered
pattern to ensure proper distribution of loads.
A jobsite observation of the condition of the existing framing system was performed by an audit team of Blue Raven Solar as a
request from Domus Structural Engineering. All review is based on these observations and the design criteria listed below and
only deemed valid if provided information is true and accurate.
On the above referenced project, the roof structural framing has been reviewed for additional loading due to the installation of
the solar PV addition to the roof. The structural review only applys to the section of the roof that is directly supporting the solar
PV system and its supporting elements. The observed roof framing is described below. If field conditions differ, contractor to
notify engineer prior to starting construction.
Cooper Residence, Rexburg, ID 1
____________________________________________________________________________________
Domus Structural Engineering, LLC
P.O. Box 6986
Broomfield, CO 80021
530‐864‐7055
Domusstructural@gmail.com
50 psf
(ASCE7 - Eq 7-1)
1 (ASCE7 - Table 7-2)
1 (ASCE7 - Table 7-3)
1
35.0 psf
(ASCE7 - Eq 7-2)
1
35.0 psf
3.0 psf
4.00 ft
2.67 ft
10.68 sft
32 lb
4.00
2.00
0.73
0.00 (Ceiling Not Vaulted)
0.27
7.0 psf
8.1 psf
PV Dead Load = 3 psf (Per Blue Raven Solar)
DL Adjusted to 30 Degree Slope
Point Loads of Standoffs
Miscellaneous
Vaulted Ceiling
Total Roof DL (MP1&2)
Roof Live Load = 20 psf
Roof Plywood
Roof Dead Load (MP1&2)
Composition Shingle
Note: Roof live load is removed in area's covered by PV array.
Roof Snow Load Calculations
pg = Ground Snow Load =
Ce = Exposure Factor =
pf = 0.7 Ce Ct I pg
Ct = Thermal Factor =
I = Importance Factor =
Cs = Slope Factor =
Standoff Tributary Area =
ps = Cspf
ps = Sloped Roof Snow Load =
pf = Flat Roof Snow Load =
Gravity Loading
PV System Weight
Weight of PV System (Per Blue Raven Solar)
X Standoff Spacing =
Y Standoff Spacing =
Note: PV standoffs are staggered to ensure proper distribution of loading
2x4 Top Chords @ 24"o.c.
Cooper Residence, Rexburg, ID 2
___________________________________________________________________________________________
Domus Structural Engineering, LLC
P.O. Box 6986
Broomfield, CO 80021
530‐864‐7055
Domusstructural@gmail.com
115 mph
C
Gable/Hip
30 degrees
20 ft
19.3 ft
(Eq. 30.3-1)
0.9 (Table 30.3-1)
1 (Fig. 26.8-1)
0.85 (Table 26.6-1)
115 mph (Fig. 26.5-1A)
II (Table 1.5-1)
qh = 25.90
15.54
Zone 1 Zone 2 Zone 3 Positive
GCp = -0.92 -1.12 -1.12 0.86 (Fig. 30.4-1)
Uplift Pressure = -14.36 psf -17.47 psf -17.47 psf 22.3 psf
X Standoff Spacing = 4.00 4.00 2.67
Y Standoff Spacing = 2.67 2.67 2.67
Tributary Area = 10.68 10.68 7.12
Footing Uplift = -153 lb -187 lb -124 lb
Zone 1 Zone 2 Zone 3 Positive
GCp = -0.92 -1.12 -1.12 0.86 (Fig. 30.4-1)
Uplift Pressure = -14.36 psf -17.47 psf -17.47 psf 10.0 psf (Minimum)
X Standoff Spacing = 4.00 4.00 2.67
Y Standoff Spacing = 1.67 1.67 1.67
Tributary Area = 6.68 6.68 4.45
Footing Uplift = -96 lb -117 lb -78 lb
-187 lb
450 lb
Therefore, OK
Fastener =1 - 5/16" dia Lag
Number of Fasteners = 1
Embedment Depth = 2.5
Pullout Capacity Per Inch = 250 lb
Fastener Capacity = 625 lb
w/ F.S. of 1.5 & DOL of 1.6= 667 lb
Therefore, OK
Input Variables
Wind Speed
Effective Wind Area
Design Wind Pressure Calculations
Roof Shape
Standoff Uplift Calculations-Portrait
Mean Roof Height
Roof Slope
667.2 lb capacity > 187 lb demand
0.6 * qh =
Standoff Uplift Calculations-Landscape
Wind Calculations
Maximum Design Uplift =
Standoff Uplift Capacity =
450 lb capacity > 187 lb demand
Fastener Capacity Check
Standoff Uplift Check
Kz (Exposure Coefficient) =
Kzt (topographic factor) =
Kd (Wind Directionality Factor) =
V (Design Wind Speed) =
Risk Category =
qh = 0.00256 * Kz * Kzt * Kd * V^2
Wind Pressure P = qh*G*Cn
Exposure Category
Per ASCE7‐10 Components and Cladding
Cooper Residence, Rexburg, ID 3
___________________________________________________________________________________________
Domus Structural Engineering, LLC
P.O. Box 6986
Broomfield, CO 80021
530‐864‐7055
Domusstructural@gmail.com
(MP1&2)PASS
Dead Load 8.1 psf
PV Load 3.0 psf
Snow Load 35.0 psf
Governing Load Combo = DL + SL
Total Load 46.1 psf
Fb (psi) = f'b x Cd x Cf x Cr (NDS Table 4.3.1)
900 x 1.15 x 1.5 x 1.15
Allowed Bending Stress = 1785.3 psi
(wL^2) / 8
= 414.7461 ft#
= 4976.954 in#
Actual Bending Stress = (Maximum Moment) / S
= 1625.2 psi
L/180 (E = 1600000 psi Per NDS)
= 0.4 in
Deflection Criteria Based on =
(w*L^4) / (185*E*I)
=
= L/550 > L/180 Therefore OK
Allowed Deflection (Live Load) =L/240
0.3 in
(w*L^4) / (185*E*I)
L/728 > L/240 Therefore OK
Member Area = Fv (psi) = 180 psi (NDS Table 4A)
Allowed Shear = Fv * A = Max Shear (V) = w * L / 2 = 276 lb
Check Bending Stress
Continuous Span
0.131 in
0.099 in
Member Properties
Member Size
2x4
S (in^3)
3.06 DF#2
Member Spacing
@ 24"o.c.
Maximum Moment =
Check Deflection
I (in^4)
5.36
Lumber Sp/Gr
Actual Deflection (Live Load) =
Allowed Deflection (Total Load) =
Actual Deflection (Total Load) =
Allowed > Actual -- 91.1% Stressed -- Therefore, OK
945 lb
Allowed > Actual -- 29.3% Stressed -- Therefore, OK
(True Dimensions)
5.3 in^2
Check Shear
w = 92 plf
2x4 Top Chords @ 24"o.c.
Member Span = 6' - 0"
Framing Check
Cooper Residence, Rexburg, ID 4
___________________________________________________________________________________________
_
Domus Structural Engineering, LLC
P.O. Box 6986
Broomfield, CO 80021
530‐864‐7055
Domusstructural@gmail.com
Level Area Weight (psf) Weight (lb)
Roof 3300 sf 8.1 psf 26674 lb
Ceiling 3300 sf 6.0 psf 19800 lb
Wood Siding 100 ft 5.0 psf 2000 lb (8'-0" Wall Height)
Int. Walls 100 ft 6.4 psf 2560 lb
51034 lb
3.0 psf
212 sf
636 lb
5103 lb
636 lb
1.2%
Lateral Check
5103 lb > 636 lb, Therefore OK
Per 2015 IBC Chapter 34
Existing Weight of Effected Building
Existing Weight of Effected Building
Proposed Weight of PV System
Weight of PV System (Per Blue Raven Solar)
Approx. Area of Proposed PV System
Approximate Total Weight of PV System
10% Comparison
10% of Existing Building Weight (Allowed)
Approximate Weight of PV System (Actual)
Percent Increase