Loading...
HomeMy WebLinkAboutAPPLICATION PRELIMINARY PLAT - 18-00080 - Approx 472 N Yellowstone Hwy - Thomson Farms Prelim. Platcw#P&Z Date Preliminary Plat Application City of Rexburg 35 North J*East Rexburg, ID 83440 www.rexburg.org Phone: 208.359.3020 Fax: 208.359.3022 Cl T* Of REXBURG Ckmrmmty TIME: 2 Months Size Fee Greater of $4/lot: OR $8/acre: Base Fire Fee: $50.00 Total Fees Due: Fee(s) Paid: Yes/No (Size Fee $100 min.) In addition to City of Rexburg fees, the County Surveyor Review fee will be calculated by the Madison County Planning & Zoning office. Madison County will send the bill direcdy to the applicant when the County Surveyor Review has been completed. □ □ □ □ □ □ □ Submittal Requirements Pre-application conference with staff prior to the submittal of this application. Legal description of the subdivision (please attach). A statement of the intended use of the proposed subdivision (Ex: Residential single family, Commercial, etc.) A map of the entire area scheduled for development A vicinity map showing the relationship of the proposed plat to the surrounding area (Vá mile min. radius) Four (41 copies of the application and all supporting documents will be needed (Four (4) 24”x36” copies of plat) Digital .pdf copy of application and supporting documents submitted to the Planning & Zoning office. APPLICANT Name: Paul Bringhurst, Stillwater Equity Partners Address: 160 W. Canyon Crest Rd. Suite 3 Alpine, UT 84004 Phone Number: 801.216.8850 Cell Number: 385.321.1403 Email: paul@stillwatermail.com ENGINEER OR SURVEYOR Name: Jared Ford, Ensign Engineering Address: 45 Sego Uly Dr# 500, Sandy, UT 84070 Phone Number: 801.255.0259 Cell Number: Email: jford@ensignutah .com OWNER/CONTROLLER for ENTIRE DEVELOPMENT Name: Paul Bringhurst, Stillwater Equity Partners Address: 160 W Canyon Crest Dr. Suite 3 Alpine, UT 84004 Phone Number: 801.216.8850 Cell Number: Email: Please complete the following: (If not applicable, please fill in with N/A)a) Is this Plat a Planned Unit Development (PUD)? Yes X NoIf so, are you requesting flexibility in site and building design? (Density Bonus Points) Yes X Nob) What is the land use and existing zoning of the proposed subdivision and the adjacent land? Existing land use is agriculture. Adjacent land uses include single-family, multi-family, and commercial uses. Existing zoning is MDR1, LDR2, and CBC c)Does the subdivision conform to present zoning?Yes X No (If no, also fill out rezone application) d)Variance Requested:Yes No X (If yes, also fill out variance application) e)Requesting annexation to City?Yes No X (If yes, also fill out annexation application) The attached Subdivision plan has been prepared in accordance with the Subdivision Regulations of the City of Rexburg, and the items needed for review are shown on the plan or plans, or explanations given with respect thereto. All applications that are complete will bg_přeee^ed wiţhdue diHgenee-and-wjll be scheduled, dependent upon availability, for an upcoming agenda. f Ap Date ITEMS NEEDED FOR REVIEW See Subdivision chapter in Rexburg Development Code. The following shall be shown on the Preliminary Plat:□ The name of the proposed subdivision Thomson Farms pud□ The location Approx. 472 N Yellowstone HWY Acreage 60.33 Number of Lots 30 □ The names, addresses and telephone numbers of the sub-divider or sub-dividers and theengineer or surveyor who prepared the plat. □ Streets — cross sections of proposed streets showing widths of roadway, curbs, locations and width of sidewalks andlocation and size of utility mains. □ Vehicular circulation: Streets, street names, rights-of-way, and roadway widths, including adjoining streets orroadways, curbs; central line profiles showing finished grades of all streets □ Streets and drainage way dedications □ Access and Transportation □ Pedestrian connections with adjacent properties □ Profiles of sanitary sewer, street drainage, drainage pre-treatment, storm water detention and water distributionsystems, showing pipe size and location of valves and fire hydrants, all to conform to city and state standards and theirestimated costs. □ Proposed and existing detailed water, sewer, drainage and drainage pre-treatment, storm water detention and streetsystem plans including: o Gas mains, electrical,o Water main lines communications, etc.o Street lighting o Sewer main lines o Fire hydrants o Storm water plan □ Zoning requirements □ Special development issues (steep slopes, hazards, etc.) □ Design of lots meet code requirements □ Neighborhood collaboration □ Show sites proposed for parks, playgrounds, schools, churches or other public areas. □ Contour lines, shown at five (5’) feet intervals where land slope is greater than ten percent (10%) and at two (2”)feet intervals where land slope is ten percent (10%) or less, referenced to an established bench mark, includinglocation and elevation. □ Detailed landscaping plans showing the type and size of all plant material and its location, the irrigation system,decorative materials, and the schedule for removal and replanting of vegetation. 2 SITE PLAN ADDITIONAL ITEMS NEEDED: □ Position of utility boxes □ Bldg, location, sq.ft., dimensions, and dimensions in comparison to lot lines and other buildings □ Easements should show existing and proposed □ Clear site triangle □ Driveway, parking lot dimensions □ Parking space numbers, sizes, and widths (including handicap and loading, unloading areas) □ Sidewalks — both along rights-of-way and internal walkways □ Snow storage □ Open/Common spaces □ Fencing/screening (HVAC equipment, dumpsters, parking, etc.)□ Trash dumpsters for right-hand truck □ Buffering/landscaping □ Elevations showing Architectural design standards: building heights & design to be appealing Preliminary Plat Process 1. Pre-application meeting may be required 2. Complete application is received by Planning and Zoning and fees are paid3. Preliminary plat reviews (Revisions may require plans be resubmitted with changes completed)4. Work with public works to draft development agreement5. Staff Report is sent to applicant6. Planning & Zoning meeting7. City Council Meeting 8. All Zone Changes 9. Start Final Plat Process 3