Loading...
HomeMy WebLinkAboutFS HYDRO CALCS 2 - 17-00626 - 1175 W Main St - Valley Wide - Addition & Remodel Project Name : VALLEY WIDE COOP Drawing No. : Project Location: 1175 W MAIN STREET City: REXBURG , IDAHO 83440 CALCULATION SUMMARY Design Areas Design Area Name Min. Density Area of Application Occupancy Calculated Heads Min. Pressure Hose Streams Total Water Pressure @ Source Margin To Source (gpm/ft²)(ft²)#(psi)(gpm)(gpm)(psi)(psi) Min. Flow (gpm) Calc. Mode (Model) 2 LIGHT 1610 307 Required 66.5 0.1 22.5 8 100 12.716.1Demand (HW) Date 2/8/2018 Page 1Copyright © 2002-2012 Tyco Fire Protection Products File: D:\Dropbox (Phoenix Fire)\Phoenix Fire - Design\Current Jobs\2017\17-245 Valley Wide Cooperative - Rexburg\17-245 FP.dwg Design Remote Area Name Remote Area Location Occupancy Classification Density (gpm/ft²) Area of Application (ft²) Coverage per Sprinkler (ft²) Number of Calculated Sprinklers In-Rack Demand (gpm) Special Heads Hose Streams (gpm) Total Water Required (incl. Hose Streams) (gpm) Required Pressure at Source (psi) Type of System Volume - Downstream DPV (gal) 2 DORMER LIGHT 0.1 1610 225 8 0 100 307 66.5 Dry 50 gal Water Supply Information Date Location Source HYDRAULIC CALCULATIONS for 1.19.18 1175 W MAIN SRC Project Name : VALLEY WIDE COOP Contract No. : Project Location: 1175 W MAIN STREET City: REXBURG , IDAHO 83440 Date: 1/1/2018 Name of Contractor: RIEMANN DES. AND CONST. LLC Address: P.O. BOX 4294 Phone Number: 208-731-8926 Name of Designer: TRENT BICEE Authority Having Jurisdiction: REXBURG FD City: HAILEY , IDAHO 83333 E-mail: Job Information Contractor Information Notes Date 2/8/2018 Page 2Copyright © 2002-2012 Tyco Fire Protection Products File: D:\Dropbox (Phoenix Fire)\Phoenix Fire - Design\Current Jobs\2017\17-245 Valley Wide Cooperative - Rexburg\17-245 FP.dwg Job : VALLEY WIDE COOP Diagram for Design Area : 2 (Optimized Hydraulic Simplified) Node Labels: Pipe Labels: Off Off Date 2/8/2018 Page 3Copyright © 2002-2012 Tyco Fire Protection Products File: D:\Dropbox (Phoenix Fire)\Phoenix Fire - Design\Current Jobs\2017\17-245 Valley Wide Cooperative - Rexburg\17-245 FP.dwg Job : VALLEY WIDE COOP Hydraulic Analysis for : 2 Water Supply Parameters Calculation Info Calculation Mode Hydraulic Model Fluid Name Fluid Weight, (lb/ft³) Fluid Dynamic Viscosity, (lb·s/ft²) Demand Hazen-Williams Water @ 60F (15.6C) N/A for Hazen-Williams calculation. N/A for Hazen-Williams calculation. Supply 1 : SRC Flow (gpm)Pressure (psi) 0 80 1100 72 Node at Source Static Pressure (psi) Residual Pressure (psi) Flow (gpm) Available Pressure (psi) Total Demand (gpm) Required Pressure (psi) Supply Analysis SRC 80 72 1100 79.6 307 66.5 Inside Hose Flow / Standpipe Demand (gpm) Outside Hose Flow (gpm) Additional Outside Hose Flow (gpm) Other (custom defined) Hose Flow (gpm) Total Hose Flow (gpm) 100 100 Hoses Ovehead Sprinkler Flow (gpm) InRack Sprinkler Flow (gpm) Other (custom defined) Sprinkler Flow (gpm) Total Sprinkler Flow (gpm) 207 0 0 207 Required Margin of Safety (psi) SRC - Pressure (psi) SRC - Flow (gpm) Demand w/o System Pump(s) 0 66.5 207 N/A Sprinklers Other Date 2/8/2018 Page 4Copyright © 2002-2012 Tyco Fire Protection Products File: D:\Dropbox (Phoenix Fire)\Phoenix Fire - Design\Current Jobs\2017\17-245 Valley Wide Cooperative - Rexburg\17-245 FP.dwg Job : VALLEY WIDE COOP Hydraulic Analysis for : 2 Date 2/8/2018 Page 5 Copyright © 2002-2012 Tyco Fire Protection Products File: D:\Dropbox (Phoenix Fire)\Phoenix Fire - Design\Current Jobs\2017\17-245 Valley Wide Cooperative - Rexburg\17-245 FP.dwg Job : VALLEY WIDE COOP Hydraulic Analysis for : 2 Pressure (psi)Label Graph Labels Flow (gpm) ValuesDescription 0S1 80Supply point #1 - Static 1100S2 72Supply point #2 - Residual 0D1 11.7Elevation Pressure 207D2 66.5System Demand 307D3 66.5System Demand + Add.Out.Hose Pressure (psi)Curve Name Curve Intersections & Safety Margins Flow (gpm) Safety MarginIntersection Pressure (psi)@ Flow (gpm) 232.3Supply79.5 12.7 307 Open Heads Head Ref. DensityDensity K-Factor PressureFlowPressure (gpm/ft²)(gpm/ft²)(gpm/psi½)(psi)(gpm)(psi) Flow (gpm) Coverage (ft²) Required Calculated Head Type S201 5.6 0.1 22.5 16.1 0.1 16.122.5225Overhead Sprinkler S202 5.6 0.1 22.5 16.1 0.1 16.122.5225Overhead Sprinkler S203 5.6 0.1 22.5 16.1 0.102 16.822.9225Overhead Sprinkler S204 5.6 0.1 22.5 16.1 0.102 16.822.9225Overhead Sprinkler S205 5.6 0.1 22.5 16.1 0.104 17.623.5225Overhead Sprinkler S206 5.6 0.1 22.5 16.1 0.104 17.623.5225Overhead Sprinkler S207 8 0.1 13 7.2 0.267 18.934.8130Overhead Sprinkler S208 8 0.1 13 7.2 0.264 18.434.3130Overhead Sprinkler Date 2/8/2018 Page 6Copyright © 2002-2012 Tyco Fire Protection Products File: D:\Dropbox (Phoenix Fire)\Phoenix Fire - Design\Current Jobs\2017\17-245 Valley Wide Cooperative - Rexburg\17-245 FP.dwg Job : VALLEY WIDE COOP Node Data Hydraulic Calculations / Fluid Delivery Time Analysis Node# Elev ft Type Hgroup K-Fact. Open/Closed gpm/psi½ Discharge Overdischarge gpm gpm Coverage Density ft² gpm/ft² Tot. Pres. Elev. Pres. psi psi Req. Pres. Req. Discharge psi gpm S202 21 Overhead Sprinkler HEAD 5.6 Open 22.5 0 225 0.1 16.1 -11.7 16.1 22.5 S201 21 Overhead Sprinkler HEAD 5.6 Open 22.5 0 225 0.1 16.1 -11.7 16.1 22.5 S203 21 Overhead Sprinkler HEAD 5.6 Open 22.9 0.4 225 0.102 16.8 -11.7 16.1 22.5 S204 21 Overhead Sprinkler HEAD 5.6 Open 22.9 0.4 225 0.102 16.8 -11.7 16.1 22.5 S205 21 Overhead Sprinkler HEAD 5.6 Open 23.5 1 225 0.104 17.6 -11.7 16.1 22.5 S206 21 Overhead Sprinkler HEAD 5.6 Open 23.5 1 225 0.104 17.6 -11.7 16.1 22.5 S208 20 Overhead Sprinkler HEAD 8 Open 34.3 21.3 130 0.264 18.4 -11.3 7.2 13 S207 20 Overhead Sprinkler HEAD 8 Open 34.8 21.8 130 0.267 18.9 -11.3 7.2 13 010 21 Node NODE 17.6 -11.7 011 21 Node NODE 18.3 -11.7 492 21 Node NODE 19.2 -11.7 007 20 Node NODE 19.5 -11.3 001 20 Node NODE 20.4 -11.3 006 20 Node NODE 24.7 -11.3 025-O 9.63 Node NODE 55.3 -6.8 025-I 8.61 Node NODE 56.2 -6.3 398-O 5.18 Node NODE 57.7 -4.8 398-I 2.75 Node NODE 62.5 -3.8 399 0 Node NODE 63.8 -2.6 400 -6 Node NODE 66.4 0 SRC -6 Supply SUPPLY -207 66.5 0 Date 2/8/2018 Page 7Copyright © 2002-2012 Tyco Fire Protection Products File: D:\Dropbox (Phoenix Fire)\Phoenix Fire - Design\Current Jobs\2017\17-245 Valley Wide Cooperative - Rexburg\17-245 FP.dwg Hydraulic CalculationsJob : VALLEY WIDE COOP PIPE INFORMATION Node 1 Node 2 Elev 1 Elev 2 (ft) K-Factor 1 K-Factor 2 (gpm/psi½) Flow added (q) Total flow (Q) (gpm) Nominal ID Actual ID (in) Fittings quantity x (name) = length (ft) L F T (ft) C Factor Pf per ft (psi) total (Pt) elev (Pe) frict (Pf) (psi) NOTES 1Path No: S202 010 21 21 5.6 22.5 22.5 1 1.049 1x(us.Tee-Br)=3.56 3 3.56 6.56 100 0.226 16.1 0 1.5 010 007 21 20 22.5 45 1.5 1.61 1x(us.90)=2.85 11 2.85 13.85 100 0.1013 17.6 0.4 1.4 007 006 20 20 45.9 90.9 1.5 1.61 1x(us.Tee-Br)=5.7 8.35 5.7 14.06 100 0.3724 19.5 0 5.2 006 025-O 20 9.63 116.1 207 2.5 2.635 1x(coupling)=0.98 4x(us.90)=23.49 3x(us.Tee-Br)=35.24 108.5 59.71 168.21 100 0.1552 24.7 4.5 26.1 025-O 025-I 9.63 8.61 0 207 2.5 0 1.02 0 1.02 0 0.4418 55.3 0.4 0.5 DPV-1 *** 025-I 398-O 8.61 5.18 0 207 4 4.26 1x(coupling)=1.32 3.43 1.32 4.74 120 0.0107 56.2 1.5 0.1 398-O 398-I 5.18 2.75 0 207 4 0 2.43 0 2.43 0 1.5341 57.7 1.1 3.7 AmesC200H *** 398-I 399 2.75 0 0 207 4 4.26 1x(coupling)=1.32 2.75 1.32 4.07 120 0.0107 62.5 1.2 0.0 399 400 0 -6 0 207 6 6.08 1x(us.90)=21.4 6 21.4 27.4 150 0.0012 63.8 2.6 0.0 400 SRC -6 -6 0 207 6 6.357 78.02 0 78.02 120 0.0015 66.4 0 0.1 SRC 66.5 2Path No: S201 010 21 21 5.6 22.5 22.5 1 1.049 1x(us.Tee-Br)=3.56 3 3.56 6.56 100 0.226 16.1 0 1.5 010 17.6 3Path No: S204 011 21 21 5.6 22.9 22.9 1 1.049 1x(us.Tee-Br)=3.56 3 3.56 6.56 100 0.2344 16.8 0 1.5 011 007 21 20 22.9 45.9 1.5 1.61 1x(us.Tee-Br)=5.7 1 5.7 6.7 100 0.105 18.3 0.4 0.7 007 19.5 Date 2/8/2018 Page 8Copyright © 2002-2012 Tyco Fire Protection Products File: D:\Dropbox (Phoenix Fire)\Phoenix Fire - Design\Current Jobs\2017\17-245 Valley Wide Cooperative - Rexburg\17-245 FP.dwg Hydraulic CalculationsJob : VALLEY WIDE COOP PIPE INFORMATION 4Path No: S203 011 21 21 5.6 22.9 22.9 1 1.049 1x(us.Tee-Br)=3.56 3 3.56 6.56 100 0.2344 16.8 0 1.5 011 18.3 5Path No: S206 492 21 21 5.6 23.5 23.5 1 1.049 1x(us.Tee-Br)=3.56 3 3.56 6.56 100 0.2451 17.6 0 1.6 492 001 21 20 23.5 47 1.5 1.61 1x(us.Tee-Br)=5.7 1 5.7 6.7 100 0.1098 19.2 0.4 0.7 001 006 20 20 69.1 116.1 1.5 1.61 1x(us.Tee-Br)=5.7 1.65 5.7 7.35 100 0.586 20.4 0 4.3 006 24.7 6Path No: S205 492 21 21 5.6 23.5 23.5 1 1.049 1x(us.Tee-Br)=3.56 3 3.56 6.56 100 0.2451 17.6 0 1.6 492 19.2 7Path No: S208 S207 20 20 8 8 34.3 34.3 1.5 1.61 7.48 0 7.48 100 0.0614 18.4 0 0.5 S207 001 20 20 8 34.8 69.1 1.5 1.61 6.79 0 6.79 100 0.2241 18.9 0 1.5 001 20.4 * Pressures are balanced to a high degree of accuracy. Values may vary by 0.1 psi due to display rounding. *** Device pressure loss (gain in the case of pumps) is calculated from the device’s curve. If the device curve is printed with this report, it will appear below. The length of the device as shown in the table above comes from the CAD drawing. The friction loss per unit of length is calculated based upon the length and the curve-based loss/gain value. Internal ID and C Factor values are irrelevant as the device is not represented as an addition to any pipe, but is an individual item whose loss/gain is based solely on the curve data. * Maximum Velocity of 18.29 ft/s occurs in the following pipe(s): (006-001) Date 2/8/2018 Page 9Copyright © 2002-2012 Tyco Fire Protection Products File: D:\Dropbox (Phoenix Fire)\Phoenix Fire - Design\Current Jobs\2017\17-245 Valley Wide Cooperative - Rexburg\17-245 FP.dwg Device GraphsJob : VALLEY WIDE COOP Date 2/8/2018 Page 10Copyright © 2002-2012 Tyco Fire Protection Products File: D:\Dropbox (Phoenix Fire)\Phoenix Fire - Design\Current Jobs\2017\17-245 Valley Wide Cooperative - Rexburg\17-245 FP.dwg Device GraphsJob : VALLEY WIDE COOP Date 2/8/2018 Page 11Copyright © 2002-2012 Tyco Fire Protection Products File: D:\Dropbox (Phoenix Fire)\Phoenix Fire - Design\Current Jobs\2017\17-245 Valley Wide Cooperative - Rexburg\17-245 FP.dwg