Loading...
HomeMy WebLinkAboutPA SUMMARY - 18-00094 - 172 K St - PV Electric Solar Array 4.64 kWApplication Summary Application Number: 18-00094 BLD-ELER - Electrical Only Residential Received Date: 02/16/2018 PV Electric Solar Array 4.64 kW Address: 172 K St Property Information 172 K St People Information Applicant - Blue Raven Solar 1220 S 630 E #430 permitting.department@blueravensolar.com American Fork, UT 84003 Home: 3854820045Mobile: 3854820045 Owner - Alton Hansen 172 K Street Rexburg, UT 83440 Contractor Information Electrical Contractor - Blue Raven Solar - Melea Egbert 028923 (02/27/2020) permitting@blueravensolar.com 1220 S 630 E American Fork, UT 84003Work: 855-205-2530 Power Company - Rocky Mountain Power - Gregory Andrus NONE (12/31/2020) gregory.andrus@rockymountainpower.net Page 1 of 2Print Date: 02/20/2018 Application Summary Application Number: 18-00094 BLD-ELER - Electrical Only Residential Received Date: 02/16/2018 PV Electric Solar Array 4.64 kW Address: 172 K St Permit Information Detail Description Quantity Value Electric solar system installationPlease describe the work being done 9,893.00What is the cost of electrical system being installed? 9,893.00 Number of Main Services being Installed/Updated 0.00 Number of temporary services being installed 0.00 1.00How many circuits are being installed? 1.00 Are any generators being installed? No = 0 Yes = 1 0.00 Number of irrigation machines being installed 0.00 Number of irrigation pumps being installed 0.00 Number of spas, hot tubs, and/or swimming pools being installed 0.00 Temporary amusement - number of rides, concessions, and/or generators 0.00 NOther Electrical work? If yes, explain YBy checking this box, I acknowledge the requirement for contractors to be registered with the State and/or claim exemption from this requirement as a homeowner working on my own home. Comments Fee Information Fee Code & Description Amount $0.00Electrical - Misc./Hourly/Extra/Reinspec (BLDELWRK) $0.00Electrical - Misc. $65 base + $10 per ea (BLDELWRK2) $0.00 Payment Information Payment AmountTender Type Reference InfoPayment Date Page 2 of 2Print Date: 02/20/2018