HomeMy WebLinkAboutPA SUMMARY - 18-00094 - 172 K St - PV Electric Solar Array 4.64 kWApplication
Summary
Application Number: 18-00094
BLD-ELER - Electrical Only Residential
Received Date: 02/16/2018 PV Electric Solar Array 4.64 kW
Address: 172 K St
Property Information
172 K St
People Information
Applicant - Blue Raven Solar 1220 S 630 E #430
permitting.department@blueravensolar.com American Fork, UT 84003
Home: 3854820045Mobile: 3854820045
Owner - Alton Hansen 172 K Street
Rexburg, UT 83440
Contractor Information
Electrical Contractor - Blue Raven Solar - Melea Egbert 028923 (02/27/2020)
permitting@blueravensolar.com 1220 S 630 E
American Fork, UT 84003Work: 855-205-2530
Power Company - Rocky Mountain Power - Gregory Andrus NONE (12/31/2020)
gregory.andrus@rockymountainpower.net
Page 1 of 2Print Date: 02/20/2018
Application
Summary
Application Number: 18-00094
BLD-ELER - Electrical Only Residential
Received Date: 02/16/2018 PV Electric Solar Array 4.64 kW
Address: 172 K St
Permit Information
Detail Description Quantity Value
Electric solar system installationPlease describe the work being done
9,893.00What is the cost of electrical system being installed? 9,893.00
Number of Main Services being Installed/Updated 0.00
Number of temporary services being installed 0.00
1.00How many circuits are being installed? 1.00
Are any generators being installed? No = 0 Yes = 1 0.00
Number of irrigation machines being installed 0.00
Number of irrigation pumps being installed 0.00
Number of spas, hot tubs, and/or swimming pools being
installed
0.00
Temporary amusement - number of rides, concessions,
and/or generators
0.00
NOther Electrical work? If yes, explain
YBy checking this box, I acknowledge the requirement for
contractors to be registered with the State and/or claim
exemption from this requirement as a homeowner working
on my own home.
Comments
Fee Information
Fee Code & Description Amount
$0.00Electrical - Misc./Hourly/Extra/Reinspec (BLDELWRK)
$0.00Electrical - Misc. $65 base + $10 per ea (BLDELWRK2)
$0.00
Payment Information
Payment AmountTender Type Reference InfoPayment Date
Page 2 of 2Print Date: 02/20/2018