HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00312 - 525 S Center St - BYUI - Hart Building - RemodelPermit
Inspection
Summary
Permit Status of (Issue) as of Report Date: 01/23/2018 10:03 am
Permit Details Permit Number: 17-00312
BYUI - Hart Building - Remodel
525 S Center St
Commercial Remodel
Permit Issued Date: 07/27/2017
Permit Inspection Statistics
14Total Inspections Completed:
10Total Inspections Passed:
Inspection Pass Rate
71.43%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
09/06/2017PassTed DyeCommercial Footing Inspection
09/11/2017PassTed DyeFoundation Inspection
10/27/2017PassTed DyeCommercial Framing/Structure Inspection
All walls of steel stud construction.Inspector Comments:
01/19/2018PassQuinton OwensCommercial Building Final
Electrical Inspection Type
10/27/2017PARTPASSBret StoddardCommercial Electrical Rough-in
11/07/2017PARTPASSBret StoddardCommercial Electrical Rough-in
01/22/2018PassBret StoddardCommerical Electrical Final Inspection
Fire Inspection Type
01/03/2018PassDale PickeringFire Sprinkler Rough-in
Mechanical Inspection Type
10/24/2017FailDon AllenHVAC Rough-in
01/16/2018PassQuinton OwensHVAC Final Inspection
01/16/2018PassQuinton OwensHVAC Rough-in
Ceiling grid partially open in all rooms. Rough-in looks completed as required.Inspector Comments:
Plumbing Inspection Type
09/26/2017PassDon AllenPlumbing Underground Inspection
Good to cover the ground work in the remodelInspector Comments:
10/25/2017PARTPASSDon AllenPlumbing Rough-in
01/22/2018PassDon AllenPlumbing Final Inspection
The remodel on the main floor is good for the C/O According to crig womakInspector Comments: