COMMERCIAL APPLICATION CHECKLIST
The following items should be completed before you submit your building permit application.
*Reasonable accommodations will be made upon request.
Submit the Following Documents:
྅ 3 sets of site plans drawn to scale (see Site Plan Checklist)
྅ 3 sets of building plans (see box below to right) – stamped by a licensed professional.
Include the following as applicable
྅ Foundation Plan, Floor Joist Layout, Floor Plan, Roof Layout, Truss Details, Sectional Views, Front, Back, and Side
Elevations, Mechanical Layout, Stair Details, and any details required to illustrate special construction.
྅ Electrical panel layout and calculations included with building plans.
྅ Exterior Lighting Plan including photometric layout.
྅ Structural Calculations (see box below) – stamped by a
licensed Engineer
྅ Energy Compliance Report: As per the 2012 IECC, a COMCheck
is required (available online at www.energycodes.gov)
྅ Digital Plans (PDF Format – can be submitted by USB, CD, or
Dropbox)
྅ **Copies of any Contractors’ State License if not on file already.
Complete the Following Forms
྅ Site Plan Checklist
྅ Permit Policies Acknowledgment signed
྅ Property Line form signed
྅ Building Permit Application signed by a registered General Contractor
྅ Mechanical Permit Application signed by a registered Mechanical Contractor
྅ Electrical Permit Application signed by a licensed Electrical Contractor
྅ Plumbing Permit Application signed by a licensed Plumbing Contractor
྅ Fire Alarm Permit Application (if applicable) signed by a registered professional
྅ Fire Sprinkler Permit Application (if applicable) signed by a registered professional
྅ Subcontractor list filled out
྅ Affidavit of Legal Interest signed by owner
྅ Notifications Distribution List
྅ Business Use Summary Completed
Subdivisions: If you plan to build in a subdivision please check the Rexburg Development Code for
any requirements such as property setbacks, architecture board approval, etc.
This information is available at http://rexburg.org/pages/development-code.
Seismic Design Category – D
(unless soil evaluation confirms category C)
Ground Snow – 50 lbs. per sq. ft.
Roof Snow Load – 35 lbs. per sq. ft.
Wind Load – 90 MPH
Frost Depth – 36”
Inspection Hotline – (208) 372.2344 www.rexburg.org Permit Technician – (208) 372.2341 Revised 10/2016
Building Safety Department
City of Rexburg
35 North 1st East
Rexburg, Idaho 83440
SITE PLAN CHECKLIST
྅ 1 Site plan must be drawn to scale, be legible and also be submitted electronically if possible.
྅ 2. Adjoining streets labeled.
྅ 3. Right-of-way location and width, curb to curb widths and sidewalk location.
྅ 4. Building location, sq footage and dimensions, with distance to property lines and distances
between buildings.
྅ 5. Show existing and proposed easements.
྅ 6. Existing utilities (waterlines, sanitary sewer lines, manholes, storm drains).
྅ 7. Proposed utilities including tie in location to existing services and new easements.
྅ 8. Proposed storm drain and sanitary sewer elevations (for pipe inverts at manholes and catch basins).
྅ 9. Storm drainage plan for parking lot and roof areas, with calculations.
྅ 10. Fire hydrants and fire suppression lines (including tie to City lines).
྅ Sprinkled ྅ Not Sprinkled
྅ 11. Indicate Fire apparatus access.
྅ 12. Parking (including parking lot, drainage arrows, dimension of lot, distance between rows, and total
numbers).
྅ 13. Landscaping (type and total area, including dimensions).
྅ 14. Trash facilities.
྅ 1 Dumpster per 20 doors (non-dormitory) ྅ 1 Dumpster per 50 beds (dormitory)
྅ 15. North Arrow Included
྅ 16. Proposed street improvements (curb, gutter, sidewalk, pavement, etc.)
྅ 17. Legal description of proposed building site included.
྅ 18. Percent of lot covered by building or paving calculated.
྅ 19. Show 10% snow storage area.
྅ 20. Distance of entrances from street corner indicated.
྅ 21. Current Vicinity Map. (8 ½ x 11”) at 1” = 300’ scale, showing location of the property.
྅ 22. Lighting Plan
SITE PLANS MUST BE COMPLETE AND SUBMITTED FOR REVIEW BEFORE THE PROJECT WILL BE PLACED ON
THE PLANNING & ZONING AGENDA.
Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day. Inspection Hotline – (208) 372.2344 www.rexburg.org Permit Technician – (208) 372.2341 Revised 10/2016
Initials
Initials
Initials
Initials
Initials
Building Safety Department
City of Rexburg
35 North 1st East
Rexburg, Idaho 83440
PERMIT POLICIES ACKNOWLEDGMENT
The City of Rexburg Building Safety Department is determined to provide excellent customer service. In an effort to help you
understand the City of Rexburg Permit Policies, listed below are several policies which you are required to know prior to
proceeding with your project.
Any construction within the City of Rexburg which requires a permit shall not begin until an approved permit is
obtained. If you do not have a Pink Building Permit signed by the Building Inspector, then you do not have an
approved permit.
o Building without the pink building permit signed by the Building Inspector will result in double fees to be
assessed and the project to be red tagged. If your project is red tagged, halting all construction, only a City
Official may remove the red tag. If the red tag is removed by anyone but a City Official, citations may be
issued.
No building may be occupied without receiving a signed Certificate of Occupancy.
o If a building is occupied without receiving a signed Certificate of Occupancy, citations may be issued and the
occupants may be evicted.
Scheduling inspections is the responsibility of the applicant and their contractor. Inspections need to be called
into the hotline and not to the inspector. Inspections called in later than 8 AM will be scheduled for the following
business day.
o If an inspection is not done, the inspector may require any measures to be taken to allow him to correctly
perform the inspection. (Example: If the electrical rough in inspection is not done and the sheetrock has been
put up, the inspector may require the sheetrock to be removed in order to perform the electrical rough in
inspection.)
Construction on any project can begin ONLY when you have received a Pink Building Permit from the Building
Department. Occupancy of any structure can begin ONLY when you have received an official Certificate of
Occupancy from the Building Department. These documents must be signed by the appropriate authorities from
the City of Rexburg. Any approvals can be verified by calling (208) 372-2341.
o Even if you hear from an inspector that ‘you’re good to go’, ultimately if you do not have a Building Permit or
Certificate of Occupancy, the above policies will be enforced.
It is your responsibility to inform anyone on your project of the above policies. All sub-contractors will be held
to this standard with no exceptions.
o The above policies will be enforced to all, regardless if this information is passed on to them or not.
Applicant’s Name (print): ___________________________________ Signature: _____________________________________________ Date: ______________
Inspection Hotline – (208) 372.2344 www.rexburg.org Permit Technician – (208) 372.2341 Revised 10/2016
Building Safety Department
City of Rexburg
35 North 1st East
Rexburg, Idaho 83440
PROPERTY LINES
Each site plan that is submitted to the City of Rexburg for the Building Permit process requires that property lines
are shown accurately. It is the Developer’s responsibility to correctly identify on the site plan the location of these
lines in reference to the public right-of-way, other adjoining property lines, the street, other structures and all
utility lines. The Developer should find property pins that are still available at the lot in question. If these pins do
not exist or have become unrecognizable then a new survey should be performed.
Accurate property line information is a must for a timely review. In addition to finding existing property pins, legal
descriptions should be checked. The best way to identify property line location is with a land survey. The City of
Rexburg has aerial photos and a parcel line layer that can be checked, but they are only a tool and are not
guaranteed for accuracy. If you want to request a copy of your lot, see the front counter at the Community
Development Department.
I have read and understand the above requirements.
______________________________________________________________ __________________
Signature Date
______________________________________________________________
Printed Name
Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day.
Inspection Hotline – (208) 372.2344 www.rexburg.org Permit Technician – (208) 372.2341
Building Safety Department
City of Rexburg
35 North 1st East
Rexburg, Idaho 83440
BUILDING APPLICATION
Commercial Addition
For Office Use
Permit Number: ____________________ Zoning: ________________________________
Application Fee: ྅ $1000/Building
1. Property Owner
Name: ___________________________________________________________
Address: ___________________________________________________ City: __________________________ State: ____________ Zip Code: _________________
Phone: _____________________________________________ Email: _____________________________________________________________
2. Applicant
Name: __________________________________________________________ Role: (Owner, Tenant, Contractor, etc.) _______________________________
Address: ___________________________________________________ City: __________________________ State: ____________ Zip Code: _________________
Phone: _____________________________________________ Email: _____________________________________________________________
Contact/Rep. Name: _________________________________
3. General Contractor
Under Idaho Building Code, a registered contractor must do the work for a Commercial Building.
Name: _____________________________________________________________ Registration #: _________________________ Exp.: _______________________
Address: ___________________________________________________ City: __________________________ State: ____________ Zip Code: _________________
Phone: _____________________________________________ Email: _____________________________________________________________
Contact/Rep. Name: ______________________________________ Phone: _________________ Email: ______________________________________________
General Contractor Authorized Signature: ____________________________________________________________________ Date: __________________
A copy of your state registration/license is required to be on file. If this is the first time you have done work in the City of Rexburg, please provide
a photo copy of your license. If you are unsure if your license is on file, please check with the Permit Technician by calling (208) 372-2341.
4. Project Description
Address: _______________________________________
Project Description:
x Square footage of addition: ___________________
x Total cost of project - materials and labor: $_____________________
x Check all that apply:
྅ Mechanical: Cost $____________
྅ Fire Alarm: Cost $____________
྅ Electrical: Cost $____________
྅ Fire Sprinkler: Cost $____________
྅ Plumbing: Cost $___________
Note: Any contractors involved will need to fill out their respective application.
x Change of Occupancy? ྅ No ྅ Yes: New occupancy: _____________________________
x Other Comments (if any): _______________________________________________________________________________________________________
Building Permit fees for commercial construction are charged based on square footage and the City’s estimated valuation. The
application fee applies toward the fee total. For details on how fees are calculated, contact the Building Department. There will also be a
plan review fee totaling 10% of the building permit fee.
APPLICANT’S SIGNATURE, CERTIFICATION AND AUTHORIZATION: Under penalty of perjury, I hereby certify that I have read this application and state that the information herein
is correct and I swear that any information which may hereafter be given by me in hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg
shall be truthful and correct. I agree to comply with all City regulations and State laws relating to the subject matter of this application and hereby authorized representatives of the
City to enter upon the above-mentioned property for inspections purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2012
International Code in cases of any false statement or misrepresentation of fact in the application or on the plans on which the permit or approval was based. Permit void if not
started within 180 days. Permit void if work stops for 180 days.
Applicant’s Name (print): ___________________________________ Signature: _____________________________________________ Date: ___________
BUILDING PERMIT FORM
Updated 10/2016 200
Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day.
Inspection Hotline – (208) 372.2344 www.rexburg.org Permit Technician – (208) 372.2341
Building Safety Department
City of Rexburg
35 North 1st East
Rexburg, Idaho 83440
BUILDING APPLICATION
Commercial Electrical
For Office Use
Permit Number: ____________________ Electrical Fees Paid ྅
1. Property Owner
Name: ___________________________________________________________
Address: ___________________________________________________ City: __________________________ State: ____________ Zip Code: _________________
Phone: _____________________________________________ Email: _____________________________________________________________
2. Electrical Contractor
Under Idaho Building Code, a registered contractor must do the work for a Commercial Building.
Business: ___________________________________________________________ State License #: _________________________ Exp.: _______________________
Address: ___________________________________________________ City: __________________________ State: ____________ Zip Code: _________________
Phone: _____________________________________________ Email: _____________________________________________________________
Contact/Rep. Name: ______________________________________ Phone: _____________________ Email: __________________________________________
Electrical Contractor Authorized Signature: ____________________________________________________________________ Date:________________
A copy of your state registration/license is required to be on file. If this is the first time you have done work in the City of Rexburg, please provide
a photo copy of your license. If you are unsure if your license is on file, please check with the Permit Technician by calling (208) 372-2341.
3. Project Description
Address: _______________________________________
Description of work: _____________________________________________________________________________________________________________________
྅ Project Cost: $ ___________________
x Fees for commercial projects are charged by cost:
o First $10,000 = 2% + $60. From $10,000 to $100,000 = 1% + $260. Above $100,000 = .5% +$1,160. i.e. Work costing
$15,000 will be charged $260 for the first $10,000 and 1% of the remaining $5,000 = $260 + $50 = $310 total fee
x There will also be a plan review fee totaling 10% of the above fee.
APPLICANT’S SIGNATURE, CERTIFICATION AND AUTHORIZATION: Under penalty of perjury, I hereby certify that I have read this application and state that the information herein
is correct and I swear that any information which may hereafter be given by me in hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg
shall be truthful and correct. I agree to comply with all City regulations and State laws relating to the subject matter of this application and hereby authorized representatives of the
City to enter upon the above-mentioned property for inspections purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2012
International Code in cases of any false statement or misrepresentation of fact in the application or on the plans on which the permit or approval was based. Permit void if not
started within 180 days. Permit void if work stops for 180 days.
Applicant’s Name (print): ___________________________________ Signature: _____________________________________________ Date: _______________
BUILDING PERMIT FORM