Loading...
HomeMy WebLinkAboutAPPLICATIONS - 17-00760 - 215 E 3rd S - RemodelCITY OF REXBURG 7(90 CW America's Family Community 11-W Building Safety Department City of Rexburg 35 North 1st East Rexburg, Idaho 83440 SINGLE FAMILY RESIDENTIAL REMODEL APPLICATION CHECKLIST The following items should be completed before you submit your building permit application. *Reasonable accommodations will be made upon request. Submit the Following Documents: ❑ 2 sets of building plans drawn to scale ❑ Include the following as applicable: Floor Plan, Sectional Views, Mechanical Layout, Stair Details, and any details required to illustrate special construction. ❑ Digital Plans (PDF Format- can be submitted by USB, CD, or Dropbox) ❑ **Copies of any Contractors' State License if not on file already. Complete the Following Forms: ❑ Permit Policies Acknowledgment signed. ❑ Building Permit Application signed by a registered General Contractor. ❑ Mechanical Permit Application signed by a registered Mechanical Contractor. ❑ Electrical Permit Application signed by a registered Electrical Contractor. ❑ Plumbing Permit Application signed by a registered Plumbing Contractor. ❑ Subcontractor list completed. ❑ Homeowner's Exemption signed, if Homeowner is doing work on their own home. ❑ Affidavit of Legal Interest signed by owner, if applicant is not working directly with owner. ❑ Notifications Distribution List, Subdivisions: If you plan to build in a subdivision please check the Rexburg Development Code for any requirements such as property setbacks, architecture board approval, etc. This information is available at http:llrexburg.org/pages/developiiient-code. Inspection Hotline -(208)372.2344 w rezburg.org Permit Technician -(208)372.2341 Revised 10/2016 12/11/17 Dear Rexburg Planning and Zoning: I have recently purchased the home and property at 215 E. 3rd S. in Rexburg. In November, Larry and Don from the city building inspectors came and did a walkthrough of the property and gave me a list of items that needed to be done in order to update the home to code and make it a du-plex and rent the basement apartment. One of the major findings was the basement stair case was only 30 inches wide while code requires 36 inches. This will require us to make a new stair case on the outside of the home by pouring excavating and pouring concrete for a new stair case into the basement. I am willing to do this and am not trying to get around any of the city codes, but an inquiring to receive an extension of time to complete this step of updating the home to code for rental. The previous owner would not allow us to start work on the property until we closed and we finally were able to close last week. Because of this and the extreme cold weather we've been having, we are respectfully requesting a variance on the stair case until June 1, 2018 and allow us to rent the basement out starting January 1, 2017. We will of course update all other requirements including the window wells in the basement bedrooms. Thank you for your consideration on this matter. Please let me know if you have any further questions. Thanks, VVI 4 Ive Weston Crapo CITY OF REXBURG 0& AmMcds rnndly, Community PERMIT POLICIES ACKNOWLEDGMENT Building Safety Department City of Rexburg 35 North 1st East Rexburg, Idaho 83440 The City of Rexburg Building Safety Department is determined to provide excellent customer service. In an effort to help you understand the City of Rexburg Permit Policies, listed below are several policies which you are required to know prior to proceeding with your project, Any construction within the City of Rexburg which requires a permit shall not begin until an approved permit is obtained. If you do not have a Pink Building Permit signed by the Building Inspector, then you do not have an approved permit. /t (� o Building without the pink building permit signed by the Building Inspector will result in double fees to be assessed and the project to be red tagged, if your project is red tagged, halting all construction, only a City^ilial: Official may remove the red tag. If the red tag is removed by anyone but a City Official, citations may be issued. No building may be occupied without receiving a signed Certificate of Occupancy. o If a building is occupied without receiving a signed Certificate of Occupancy, citations may be issued and the occupants may be evicted. Initials Scheduling inspections is the responsibility of the applicant and their contractor. Inspections need to be called into the hotline and not to the inspector. Inspections called in later than 8 AM will be scheduled for the following business day. o If an inspection is not done, the inspector may require any measures to be taken to allow him to correctly perform the inspection. (Example: If the electrical rough in inspection is not done and the sheetrock has been Initials put up, the inspector may require the sheetrock to be removed in order to perform the electrical rough in inspection.) Construction on any project can begin ONLY when you have received a Pink Building Permit from the Building Department. Occupancy of any structure can begin ONLY when you have received an official Certificate of Occupancy from the Building Department. These documents mast be signed by the appropriate authorities from the City of Rexburg. Any approvals can be verified by calling (208) 372.2341. f f/ o Even if you hear from an inspector that'you're good to go', ultimately if you do not have a Building Permit or Certificate of Occupancy, the above policies will be enforced. Initials It is your responsibility to inform anyone on your project of the above policies. All sub -contractors will be held to this standard with no exceptions. o The above policies will be enforced to all, regardless if this information is passed on to them or not. Initials (/ Applicant's Name (print): a V 6 Signature: Date: Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after a AM will be scheduled for the next business day. Inspection Hotline -(208)372.2344 www.rexburg.org Permit Technician -(208)372.2341 Revised 10/2016 CITY OF REXBURG cw Amerlwu &n Hy Community HOMEOWNER'S EXEMPTION Building Safety Department City of Rexburg 35 North 1st East Rexburg, Idaho 83440 As of January 1, 2006, the City of Rexburg can no longer sell permits without having a copy of your State registration number or your exemption from the State registration. Please fill out this form showing your exemption and send it with your permit application. Idaho State Statute allows a homeowner to do work on their own residence: An owner performing construction on the owner's personal residential real property, whether or not occupied by the owner, provided however, this exemption shall not apply to an owner who is otherwise regulated by this chapter who constructs a building, residence or other improvement on the owner's property with the intention and for the purpose of promptly selling the improved property, unless the owner has continuously occupied the property as the owner's primary residence for not less than twelve (12) months prior to the sale of such property; Title 54, Chapter 52, Subsection (2) I hereby certify that the above information is true and correct to the best of my knowledge. Signature Dat�/ Permit Technician -(208)372.2341 w .rexburg.org Revised 10/2016 CITY OF REXBURG cW America's Family Community BUILDING PERMIT FORM 102 uca.i.d 10/2(o6 BUILDING APPLICATION Single Family Residence Remodel Building Safety Department City of Rexburg 3S North 1st East Rexbure.Idaho 83440 For office Use Permit Number: Zoning: Application Fee Paid: ❑ $100 1. Proper np„L_4 Name: Address: City, State: Zip Code Phone: 2r 1g—[�Z� Email: Under Idaho Building Code, a homeowner is allowed to do work on their own home. Are you a homeowner doing work on your own home? )(Yes (Skip to #4 and complete the Homeowner's Exemption) ❑ No, l am working with the homeowner 2. Applicant Name: Role: (Owner, Tenant, Contractor, etc.) _ Address: City: State: Zip Code: Phone: Email: Contact/Rep. Name: 3. General Contractor Name: Registration #: Exp.: Address: City: State: Zip Code: Phone: Email: Contact/Rep. Name: Phone: Email: General Contractor Authorized Signature: Date: A copy ofyour state registration/license is required to be on file. if this is the first time you have done work in the City of Rexburg, please provide a photo copy ofyour license. Ifyou are unsure ifyour license is on file, please check with the Permit Technician by calling (208) 372-2341. 4. Project Descry tion Address: 3 s i dg3�/YO Project Description: • Estimated Total Cost: $ • Check All Included in Scope of Work: ❑ Mechanical Work Cost: lo ❑ Electrical Work Cost: $� ❑ Plumbing Work Cost: $ ®/ Note: Any contractors involved will need to fill out their respective application. • Fireplace(s) Being Installed? ❑ Yes KNo Building Permitfees for remodels aro charged based on cost. The application fee applies toward the fee total. For details on how fees are calculated, contact the Building Department. There will also be a plan review fee totaling 10% of the building permit fee. APPLICANT'S SIGNATURE, CERTIFICATION AND AUTHORIZATION: Under penalty of perjury, I hereby certify that l have read this application and state that the information herein is correct and I swear that any information which may hereafter be given by me in hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg shall be truthful and correct. Iagree to comply with all City regulations and State laws relating to the subject matter of this application and hereby authorized representatives of the City to enter upon the above-mentioned property for inspections purposes. NOTE; The building official may revoke a permit on approval issued under the provisions ofthe 2012 International Code in cases of any false statement or misrepresentation of fact in the application or on the plans on which the permit or approval was based. Permit void if not started within 180 days. Permit void if work stops for 180 days. Applicant's Name (print): Signature:)� Dater Inspections mus[ be called in before a AM an the day the inspection is requested. Inspection requests called in after a AM will be scheduled for the next business day. Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341 CITY OF REXBURG 0- Alnedm3 Family community BUILDING PERMIT FORM 111 upmtm 10/2o16 BUILDING APPLICATION Remodel SFR Mechanical Building Safety Department City of Rexburg 35 North 15t East Rexburg, Idaho 83440 For Office Use Permit Number: ❑ Mechanical Fee Paid 1. Property Owner Name: Address: City: State: Zip Code: Phone: Email: Under Idaho Building Code, a homeowner is allowed to do work on their own home. Are you a homeowner doing work on your own home? ❑ Yes (Skip to #3 and complete the Homeowner's Exemption) ❑ No, I am working with the homeowner 2. Mechanical Contractor �7 Business: P1 / Wgfr /4'tr.40Ai Cw 1 Sce Linse #; L 3 Exp.: Address: `2 2— A W. �2) S• City: lY? State: Zip Code:.q'_rVV 6 Phone: Email; Contact/Rep. Name: Phone: Email: Mechanical Contractor Authorized Signature: Date: - A copy of your state registration/license is required to be on Fle. If this is the first time you have done work in the City of Rexburg, please provide a photo copy ofyour license. Ifyou are unsure ifyour license is on file, please check with the Permit Technician by calling (208) 372-2341. 3. Project Description Address: Description of work: ❑ Remodel Cost: $ • Fees for remodels are charge by cost: o First$10,000 = 2% + $60. From $10,000 to $100,000 = 1% +$260. Above $100,000 =.5% +$1,160. i.e. Workcosting $15,000 will be charged $260 for the first $10,000 and 1% of the remaining $5,000 =$260 + $50=$310 total APPLICANT'S SIGNATURE, CERTIFICATION AND AUTHORIZATION: Under penalty of perjury,I hereby certify that l have read this application and state that the information herein is correct and I swear that any information which may hereafter be given by mein hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg shall be truthful and correct I agree to comply with all City regulations and State laws relating to the subject matter ofthis application and hereby authorized representatives of the City to enter upon the above-mentioned property for inspections purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2012 International Code in cases of any false statement or misrepresentation of fact in the application or on the plans on which the permit or approval was based. Permit void Hurt started within 180 days. Permit void if work stops for 180 days. Applicant's Name (print): G! Signature: Date: V Inspections must be called in before 8 AM on the day the Inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day. Inspection Hotline - (208) 372.2344 www.i exburg.org Permit Technician - (208) 372.2341 CITY OF REXBURG OW Amerir is Family Community BUILDING PERMIT FORM 121 upd,t,d to/lois BUILDING APPLICATION Remodel SFR Electrical Building Safety Department City of Rexburg 35 North 1st East Rexburg, Idaho 83440 For Office Use Permit Number: ❑ Electrical Fee Paid L Property Owner Name: Address: City: State: Zip Code: Phone: Email: Under Idaho Building Code, a homeowner is allowed to do work on their own home. Are you a homeowner doing work on your own home? D Yes (Skip to #3 and complete the Homeowner's Exemption) ❑ No, I am working with the homeowner 2. Electrical Contractorq Business: _ _ k k / " �., / M f�+' J•Ctt�t°I < St a License #: Ct-L� � A •gyp 5101 Exp.: Address: GS`CTS ��G{ ja/rp� Alar-'iQ City State: �'-i�Zip Code: r.ftl Phone: %"d?- / 9 •tp> y Email: Contact/Rep. Name: Phone: -3%)- Email: Electrical Contractor Authorized Signature; Date: 42-// V A copy of your state registration/license is required to be on file. If this is the first time you have done work in the City of Rexburg, please provide a photocopy ofyour license. If you are unsure iifyour license is on file, please check with the Permit Technician by calling (208) 372-2341. 3. Project Description Address: Description of work: A i -f_ H7W i ❑ Remodel Cost: $ 4/ V<a v • Fees far remodels are charge by cost: o First $10,000 = 2% + $60. From $10,000 to $100,000 = 1% + $260. Above $100,000 =.5% +$1,160. i.e. Work costing $15,000 will be charged $260 for the ffrst$10,000 and 1 % of the remaining $5,000 = $260 +$50 = $310 total fee APPLICANT'S SIGNATURE, CERTIFICATION AND AUTHORIZATION: Under penalty ofperjury, I hereby certify that l have read this application and state that the Information herein Is correct and 1 swear that any Information which may hereafter be given by me in hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg shall be truthful and correct, Iagree to comply with all City regulations and State laws relating to the subject matter of this application and hereby authorized representatives of the City to enter upon the above-mentioned property for inspections purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2012 International Code in cases of any false statement or misrepresentation of fact in the application or on the plans on which the permit or approval was based. Permitvoidifnot startedwithin 180 days. Permit void if work stops for 180 days. Applicant's Name (print): " Signature: Date: 19 --/� Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day. Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341