Loading...
HomeMy WebLinkAboutRESCHECK - 17-00701 - 1204 Franklin Dr - New SFRfZGenerated by REScheck-Web Software Compliance Certificate Project Adalynn Plan Energy Code: 2012 IECC 50.0 Location: Rexburg, Idaho 62 Construction Type: Single-family 19.0 Project Type: New Construction 101 Conditioned Floor Area: 4,798 ft2 Glazing Area 14% 16 Climate Zone: 6 (8693 HDD) Permit Date: 0.270 17 Permit Number: 278 Construction Site: Owner/Agent: Designer/Contractor: Floor: All -Wood Joist[Truss 2,399 Justin Stevens 3.0 0.041 Stevens Homes Basement: Solid Concrete or Masonry 1,420 PO Box 2759 0.0 0.041 Idaho Falls, Idaho 83403 Wall height: 9.0' justin@stevenshomes.com Compliance: Posses using UA trade-off Compliance: 2.3% Better Than Code Maximum UA: 477 Your UA: 466 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off roles. It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home. Envelope Assemblies Ceiling: Flat or Scissor Truss 2,399 50.0 0.0 0.026 62 Wall: Wood Frame, 161n. D.C. 2,412 19.0 3.0 0.050 101 Door: Solid 42 0.390 16 Glass Door: Glass 63 0.270 17 Window: Vinyl Frame, 2 Pane w/ Low -E 278 0.270 75 Floor: All -Wood Joist[Truss 2,399 19.0 3.0 0.041 98 Basement: Solid Concrete or Masonry 1,420 19.0 0.0 0.041 58 Wall height: 9.0' Depth below grade: 8.9' Insulation depth: 9.0' Basement: Wood Frame 913 19.0 0.0 0.043 39 Wall height: 9.0' Depth below grade: 8.9' Insulation depth: 9.0' Project Title: Adalynn Plan Report date: 11/07/17 Data filename: Page 1 of 9 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2012 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. ��/7/ Date Project Notes: Adalynn Plan Project Title: Adalynn Plan Report date: 11/07/17 Data filename: Page 2 of 5 fZREScheck Software Version : REScheck-Web Inspection Checklist Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. �ecnon Plans Verified Field Verified # Pre-inspection/Plan Review & Re .ID Value Value 103.1, Construction drawings and 103.2 documentation demonstrate [PR1]1 energy code compliance for the building envelope. Complies? ❑Does Not ❑Not Observable Comments/Assumptions 103.1, .Construction drawings and❑Complies , 103.2, documentation demonstrate❑Does Not 403.7 [PR3]1 energy code compliance for❑Not lighting and mechanical systems. Observable ,V Systems serving multiple❑Not Applicable j dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is:, Heating: Heating: ❑Complies 403.6 sized per ACCA Manual S based Btu/hr I Btu/hr❑Does Not [PR2]' on loads calculated per ACCA Cooling: Cooling: ❑Not Observable 19) Manual J or other methods Btu/hr approved by the code official. Btu/hr_ j❑Not Applicable Additional Comments/Assumptions: 1 JHgh Impact (Tier 1) u ... Medium Impact (Tier 2) ', Low Impact (Tier 3) Project Title: Adalynn Plan Report date: 11/07/17 Data filename: Page 3 of 9 Section # Foundation Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions 402.1.1 Conditioned basement wall R-_ R -❑Complies 'See the Envelope Assemblies [FO4]1 insulation R -value. Where interiorR- !. R_ j❑Does Not ; table for values. insulation is used, verification j❑Not Observable; may need to occur during ❑Not Applicable j Insulation Inspection. Not required in warm -humid locations in Climate Zone 3. 303.2 [FO511 Conditioned basement wall insulation installed per c ❑Complies ❑Does x Not manufacturer's instructions e , []Not Observable ❑Not Applicable 402.2.8 Conditioned basement wall ft ft ;❑Complies See the Envelope Assemblies [FO611 insulation depth of burial orj❑Does Not ;table for values. distance from top of wall,❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed - ` ❑Complies [FO11]2 to protect exposed exterior ❑Does Not U insulation and extends a F :` '`.� ."- - "❑Not Observable minimum of 6 in. below grade _ - ❑Not Applicable j 403.8 Snow- and Ice -melting system' r- ❑Complies [FO12]2 _controls installed.`. <a €..]❑Does Not ❑Not Observable ❑Not Applicable j Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) JA�J Low Impact (Tier 3) Project Title: Adalynn Plan Report date: 11/07/17 Data filename: Page 4 of 9 Section # Framing /Rough -In Inspection I I Plans Verifled Value Field Verified Value complies? Comments/Assumptions & Re .ID 402.1.1, (Door U -factor. U-_ U -_❑Complies See the Envelope Assemblies 402.3.4❑Does - Not table for values. [FR1]1 j❑Not Observable ❑Not Applicable j 402.1.1, Glazing U -tactor (area -weighted '.. U -_I. U -_❑Complies ;See the Envelope Assemblies 402.3.1, average). j❑Does Not ; table for values. 402.3.3, 402.3.6,❑Not Observable 402.5 ;❑Not Applicable [FR211 303.1.3 Iare U -factors of fenestration productsg ,-a r .. ❑Complies [FR4]1 determined in accordance ... _, < ;,,..fl, - -� []Does Not ,with 'taken the NFRC test procedure or ]•,'❑Not Observable from the default table. >❑Not Applicable 402.4.1.1 Air barrier and thermal barrier : ❑Complies [FR23]1 installed per manufacturer's.❑Does Not instructions. ❑Not Observable j❑Not Applicable j 402.4.3 Fenestration that is not site built ;❑Complies [FR20]1 is listed and labeled as meeting -. '❑Does Not AAMA /WDMA/CSA 101/I.S.2/A440 ;❑Not Observable or has infiltration rates per NFRC 400 that do not exceed code ❑Not Applicable limits. 402.4.4 IC -rated recessed lighting fixtures, ❑Complies [FR16]2 sealed at housing/interior finish ❑Does Not and labeled to indicate <2.0 cfm leakage at 75 Pa. '[]Not Observable ❑Not Applicable j 403.2.1 Supply ducts in attics are R- R -❑Complies [FR12]1 insulated to zR-8. All other ducts R- R -❑Does Not in unconditioned spaces or j outside the building envelope are : ;❑Not Observable insulated to >_R-6. ;❑Not Applicable 403.2.2 All joints and seams of air ducts,IME]Not ❑Complies [FR13]1 air handlers, and filter boxes are❑Does Not sealed. ❑Not Observable ❑Not Applicable 403.2.3 Building cavities are not used as❑Complies [FR15]3 ducts or plenums. ❑Does Not ❑Not Observable Applicable: 403.3 .HVAC piping conveying fluids IR-_ R -_❑Complies [FR17]2 -above 105 QF or chilled fluids ❑Does Not i 4 below 55 QF are insulated to ?R- j I❑Not Observable 3 j❑Not Applicable 403.3.1 Protection of Insulation on HVAC - - �'- ' - - - - ❑Complies [FR24]1 piping ,,-.;;, ' - ❑Does Not ' ❑Not Observable _ ❑Not Applicable 403.4.2 Hot water pipes are insulated to R-_ R -❑Complies [FR18]2 >_R-3.❑Does Not U ;❑Not Observable ❑Not Applicable 11 High Impact (Tier 1) MM Medium Impact (Tier 2) ;3; Low Impact (Tier 3) Project Title: Adalynn Plan Report date: 11/07/17 Data filename: Page 5 of 9 +� # Framing / Rough -in Inspection Plans Verified Field Verif led & Req.ID VValue Complies? Comments/Assumptions alue 403.5 Automatic or gravity dampers are, i❑Complies [FR19]2 installed on all outdoor air❑Does Not intakes and exhausts. 1 i❑Not Observable I ❑Not Applicable j Additional Comments/Assumptions: 11 High Impact (Tier 1) rry',' Medium Impact (Tier 2) 13 lLow Impact (Tier 3) Project Title: Adalynn Plan Report date: 11/07/17 Data filename: Page 6 of 9 section # Insulation Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Req.ID - 303.1 -'All installed insulation is labeled ❑Complies [IN13]2 l'or the installed R-values ',.❑Does Not ' ' V � provided. �� ,❑Not Observable I '! !❑Not Applicable j 402.1.1, (Floor insulation R-value. R- R- I❑Complies See the Envelope Assemblies 402.2.6 ❑ Wood ❑ Wood i❑Does Not table for values. [IN111 ❑ Steel ❑ Steel❑Not Observable ❑Not Applicable 303.2, Floor insulation installed per -,❑Complies 402.2.7 manufacturer's Instructions, and ❑Does Not [IN211 in substantial contact with the _ Observable underside of the subfloor. - .:,_❑Not Applicable _''Jj❑Not 402.1.1, Wall insulation R-value. If this is a R- R- .❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/z of the ❑ Woodj ❑Wood -❑Does Not table for values. 402.2.6 wall Insulation on the wall ❑ Mass ❑ Mass '❑Not Observable [IN311 exterior, the exterior insulation requirement applies (FR10). j ❑Steel Steel ❑❑Not Applicable t3, 303.2 Wall insulation is installed per : !❑Complies [IN411 manufacturer's instructions. ❑Does Not ❑Not Observable rj❑Not Applicable j Additional Comments/Assumptions: 11 High Impact (Tier 1) ,.'. Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Adalynn Plan Report date: 11/07/17 Data filename: Page 7 of 9 Section # Final Inspection Provisions Plans Verified Field Verified Value Value Complies? Comments/Assumptions & Re .ID 402.1.1, Ceiling insulation R -value. R- ; R -❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, 402.2.6 ❑ Steel ❑ Steel ❑ Not Observable [Fill' ❑Not Applicable 303.1.1.1, Ceiling insulation Installed per ❑Complies 303.2 manufacturer's instructions. NNW, ❑Does Not [FI211 Blown insulation marked every f Yn,.10) ' Observable 300 ftz.❑Not UNot Applicable 402.2.3 Vented attics with air permeable'.❑Complies [F122 ]2 insulation include baffle adjacent ❑Does Not to soffit and eave vents that Observable I extends over insulation.❑Not ❑Not Applicable 402.2.4 Attic access hatch and door R- R -_❑Complies [FI311 insulation >_R -value of the :,❑Does Not 10) adjacent assembly. I❑Not Observable _ ;❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 =_ ACH 50 =_ ;❑Complies [FI1711 ach in Climate Zones 1-2, and ;❑Does Not <=3 ach in Climate Zones 3-8. j❑Not Observable _ ;❑Not Applicable 403.2.2 Duct tightness test result of <=4 cfm/100 cfm/100❑Complies [F1411 cfm/100 ft2 across the system or ft2 ft2 j❑Does Not tl, <=3 cfm/100 ft2 without air j❑Not Observable handler @ 25 Pa. For rough -in �',❑Not Applicable j tests, verification may need to occur during Framing Inspection. 403.2.2.1 Air handler leakage designated ❑Complles [FI2411 by manufacturer at <=2%of❑Does Not design air flow. ❑Not Observable ❑Not Applicable j 403.1.1 Programmable thermostats ❑Complies [FI9]2 installed on forced air furnaces. ❑Does Not V ❑Not Observable ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [F]10]2 on heat pumps. ❑Does Not lQJ ❑Not Observable ` ❑Not Applicable 403.4.1 Circulating service hot water ❑Complies [Fill]2 systems have automatic or ❑Does Not v '.accessible manual controls. ❑Not Observable ❑Not Applicable j 403.5.1 All mechanical ventilation system❑Complies [F12512 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy ❑Not Observable and air flow limits. ❑Not Applicable j 404.1 175% of lamps in permanent ❑Complies [F1611 fixtures or 75% of permanent ❑Does Not !fixtures have high efficacy lamps. !,Does not apply to low -voltage ❑Not Observable , (lighting. ❑Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 LOW Impact (Tier 3) Project Title: Adalynn Plan Report date: 11/07/17 Data filename: Page 8 of 9 ""��' # Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions & Re .ID Value Value 404.1.1 Fuel gas lighting systems have< -❑Complies [FI23]3 no continuous pilot light. �'`� ❑Does Not i#"�&' ❑Not Observable 01.3 Compliance certificate posted. F17 )2 J !03.3 Manufacturer manuals for FI18]3 mechanical and water heating Q systems have been provided. Additional Comments/Assumptions: Does Not Not Observable Not Applicable Complies Does Not Not Observable 1 JHlgh Impact (Tier 1) 2Medium impact (Tier 2) 3 Low Impact( 3) Project Title: Adalynn Plan Report date: 11/07/17 Data filename: Page 9 of 9 fz2012 IECC Energy Efficiency Certificate Insulation Rating R -Value Above -Grade Wall 22.00 Below -Grade Wall 19.00 Floor 22.00 Ceiling / Roof 50.00 Ductwork (unconditioned spaces): Window 0.27 Door 0.27 Heating System: Cooling System: Water Heater: Name: Date: Comments