Loading...
HomeMy WebLinkAboutCOMCHECK - 16-00293 - Rigby Eye CareP""',d I&- AOZ13 COMcheck Software Version 4.3.4 Envelope Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Vertical Glazing / Wall Area: 20121ECC Rigby Eye Care Rigby, Idaho 6b New Construction 10% Construction Site: Owner/Agent: Designer/Contractor: 711 Rigby Lake Drive, Unit # 3 Rigby, Idaho 83442 Building Area Floor Area 1 -Office : Nonresidential 5394 Additional Efficiency Package Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Envelope Assemblies Assembly Gross Area or Perimeter Cavity Cont. R -Value R -Value Proposed U -Factor Budget U. Factor(.) Roof: Attic Roof, Wood Joists, [Bldg. Use 1 - Office] 5394 0.0 50.0 0.019 0.021 NORTH Ext. Wall: Wood -Framed, 161n. o.c., [Bldg. Use 1 - Office] 906 22.0 2.5 0.051 0.051 Window: Wood Frame, Perf. Specs.: Product ID North Fixed, SHGC 48 --- ___ 0.280 0.360 0.58, [Bldg. Use 1 - Office] (b) Basement: Solid Concrete, 81n. Thickness, Normal Density, Furring: 240 11.0 11.0 0.047 0.108 Wood, Wall Ht 7.5, Depth B.G. 7.0, [Bldg. Use 1 - Office] EAST Ext. Wall: Wood -Framed, 161n. o.c., [Bldg. Use 1 - Office] 688 22.0 2.5 0.051 0.051 Window: Wood Frame, Perf. Specs.: Product ID East Fixed, SHGC 70 --- --- 0.280 0.360 0.58, [Bldg. Use 1 - Office] (b) Door: Insulated Metal, Non -Swinging, [Bldg. Use 1 - Office) 21 --- --- 0.280 0.280 Basement: Solid Concrete, 81n. Thickness, Normal Density, Furring: 390 11.0 11.0 0.047 0.108 Wood, Wall Ht 7.5, Depth B.G. 7.5, [Bldg. Use 1 - Office] SOUTH Ext. Wall: Wood -Framed, 16in. o.c., [Bldg. Use 1 - Office] 935 22.0 2.5 0.051 0.051 Window: Wood Frame, Perf. Specs.: Product ID South Fixed, SHGC 140 --- _-_ 0.260 0.360 0.58, [Bldg. Use 1 - Office] (b) Door: , Perf. Type: Energy code default, Double Pane with Low -E, 21 _-_ --- 0.800 0.770 Tinted, SHGC 0.60, (Bldg. Use 1 - Office] Door: , Perf. Type: Energy code default, Double Pane with Low -E, 21 --- ___ 0.800 0.770 Tinted, SHGC 0.60, [Bldg. Use 1 -Office] Basement: Solid Concrete, 81n. Thickness, Normal Density, Furring: 240 11.0 11.0 0.047 0.108 Wood, Wall Ht 7.5, Depth B.G. 7.0, (Bldg. Use 1 - Office] Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 1 of 20 Assembly Gross Area Cavity Cont. Proposed Budget U. or R -Value R -Value LI -Factor Factor(,) Perimeter WEST Ext. Wall: Wood -Framed, 16in. o.c., [Bldg. Use 1 - Office] Window: Wood Frame, Perf. Specs.: Product ID West Fixed, SHGC 0.58, [Bldg. Use 1 - Office] (b) Basement: Solid Concrete, 81n. Thickness, Normal Density, Furring: Wood, Wall Ht 7.5, Depth B.G. 7.5, [Bldg. Use 1 - Office] 623 22.0 2.5 0.051 0.051 32 -- --- 0.280 0.360 405 11.0 11.0 0.047 0.108 (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. (b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. Envelope PASSES: Design 7% better than code Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed in the Inspection Checklist. ��l,C� Name - Title SignatuM Date Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 2 of 20 6 COMcheck Software Version 4.3.4 �( Interior Lighting Compliance Certificate Project Information Energy Code: 2012 IECC Project Title: Rigby Eye Care Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: 711 Rigby Lake Drive, Unit # 3 Rigby, Idaho 83442 Additional Efficiency Package Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 1 -Office 5394 0.85 4585 Total Allowed Watts = 4585 Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. -Office LED: ceiling can trim: LED Trim: LED PAR 11 W: 1 88 11 968 Linear Fluorescent: corridor track: 2 bulb Flourescent: 48" T8 32W (Super T8): Electronic: 2 14 32 448 Track Lighting: Wattage based on 52 feet of track 0 0 0 1560 Linear Fluorescent: lights: 4 bulb Flourescent: 48" T8 32W: Electronic: 4 7 32 224 LED: wall sconce: LED Wall Mount: LED Linear Lamp 8W: 1 6 11 66 Total Proposed Watts = 3266 Compliance Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed in the Inspection Checklist. Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 3 of 20 6�( COMcheck Software Version 4.3.4 Exterior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: Exterior Lighting Zone Construction Site: 711 Rigby Lake Drive, Unit # 3 Rigby, Idaho 83442 Allowed Exterior Lighting Power A Area/Surface Category 20121ECC Rigby Eye Care New Construction 2 (Neighborhood business district) Owner/Agent: B Quantity Designer/Contractor: C D E Allowed Tradable Allowed Watts Watts / Wattage (B X C) Illuminated length of facade wall or surface 300 ft 2.5 No 750 Main entry 10 ft of 20 Yes 200 Other door (not main entry) 3 It of door 20 Yes 60 234 Total Tradable Watts (a) = 260 6 Total Allowed Watts = 1010 Main entry (10 ft of door width): Tradable Wattage Total Allowed Supplemental Watts (b) = 600 (a) Wattage tradeoffs are only allowed between tradable areas/surfaces. (b) A supplemental allowance equal to 600 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID : Description / Lamp I Wattage Per Lamp I Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. Illuminated length of facade wall or surface (300 ft)7 Non -tradable Wattage LED: Soffit Can: Recess LED Can: LED Other Fixture Unit 13W: 1 18 13 234 LED: Downcast Lamp: Gooseneck LED bulb: LED A Lamp 2.5W: 1 6 13 78 Main entry (10 ft of door width): Tradable Wattage LED: Entry Can: Recess LED Can: LED Other Fixture Unit 13W: 1 4 13 52 LED: Entry Wall: Entry Wall Mount: LED Other Fixture Unit 6.5W: 1 4 13 52 Other door (not main entry) (3 ft of door width) Tradable Wattage LED: Soffit Can: Recess LED Can: LED Other Fixture Unit 13W: 1 2 13 26 Total Tradable Proposed Watts = 130 Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed in the Inspection Checklist. Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 4 of 20 �( COMcheck Software Version 4.3.4 Mechanical Compliance Certificate Project Information Energy Code: 2012 IECC Project Title: Rigby Eye Care Location: Rigby, Idaho Climate Zone: 6b Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: 711 Rigby Lake Drive, Unit # 3 Rigby, Idaho 83442 Additional Efficiency Package Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Mechanical Systems List Quantity System Type & Description 1 HVAC System (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 84 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency = 80.00% El Cooling: 1 each - VRF Zone Fan Unit, Capacity = 50 kBtu/h, Air Economizer No minimum efficiency requirement applies 1 HVAC System (Multiple -Zone): Heating: 2 each - Central Furnace, Gas, Capacity = 106 kBtu/h Proposed Efficiency = 98.00% El, Required Efficiency = 80.00% Et Cooling: 2 each - VRF Zone Fan Unit, Capacity = 60 kBtu/h, No Economizer, Economizer exception: None No minimum efficiency requirement applies 2 Water Heater: Gas Storage Water Heater, Capacity: 50 gallons, Input Rating: 75 Btu/h Proposed Efficiency: 0.85 EF, Required Efficiency: 0.53 EF Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed in the Inspection Checklist. Project Title: Rigby Eye Care Data filename: Report date: 08/16/16 Page 5 of 20 COMcheck Software Version 4.3.4 Inspection Checklist Energy Code: 2012 IECC Requirements: 98.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Re .ID C103.2 Plans and/or specifications provide all ❑Complies Requirement will be met. [PR111 information with which compliance ❑Does Not can be determined for the building ❑Not Observable envelope and document where ❑Not Applicable exceptions to the standard are PP claimed. C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR211 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the mechanical ❑Not Applicable systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR311 calculations provide all information ❑Does Not with which compliance can be [)Not Observable determined for the service water ❑Not Applicable heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR411 calculations provide all information El Does Not with which compliance can be ❑Not Observable determined for the interior lighting ❑Not Applicable and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. 0103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR8j1 calculations provide all information ❑Does Not with which compliance can be []Not Observable determined for the exterior lighting ❑Not Applicable and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. C406 Plans, specifications, and/or ❑Complies Requirement will be met. [PR911 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the additional energy ❑Not Applicable efficiency package options. 1 JHigh Impact (Tier 1) Medium Impact (Tier 2) 13: Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 6 of 20 $action # Plan Review Complies? Comments/Assumptions & Re .ID C402.3.1 The vertical fenestration area <= 30 ❑Complies Requirement will be met. [PRSO]1 percent of the gross above -grade wall ❑Does Not area. ❑Not Observable ❑Not Applicable C402.3.1 The skylight area <= 3 percent of the ❑Complies Requirement will be met. [PRll]1 'gross roof area. ❑Does Not []Not Observable ❑Not Applicable C402.3.2. Skylights in office, storage, ❑Complies Exception: Requirement does not apply. 2 automotive service, manufacturing, []Does Not [PR15]1 non -refrigerated warehouse, retail ❑Not Observable store, and distribution/sorting area ❑Not have a measured haze value > 90 Applicable percent unless designed to exclude direct sunlight. Additional Comments/Assumptions: 1 IHigh Impact (Tier 1) -'' Medium Impact (Tier 2) 15I Low Impact (Tier 3) Project Title: Rigby Eye Care Data filename: Report date: 08/16/16 Page 7 of 20 Section # Footing / Foundation Inspection Complies? Comments/Assumptions & Re .ID C402.2.4 Below -grade wall insulation R -value. ❑Complies See the Envelope Assemblies table for values. IF0112 ❑Does Not ❑Not Observable []Not Applicable C303.2 Below -grade wall insulation installed []Complies Requirement will be met. [FO2]2 per manufacturer's instructions. []Does Not ❑Not Observable ❑Not Applicable 0403.2.8. Exterior insulation protected against ❑Complies 1 damage, sunlight, moisture, wind, ❑Does Not [FO611 landscaping and equipment ❑Not Observable maintenance activities. ❑Not Applicable C403.2.4. Freeze protection and snow/ice ❑Complies Exception: Requirement does not apply. 5 melting system sensors for future ❑Does Not [FO9]3 connection to controls. ❑Not Observable []Not Applicable C402.2.8 Bottom surface of floor structures []Complies Exception: Requirement does not apply. [FO12]3 incorporating radiant heating ❑Does Not insulated to >=R-3.5. ❑Not Observable See the Envelope Assemblies table for values. ❑Not Applicable Additional Comments/Assumptions: 1 JHigh Impact (Tier 1) 1 2 1 Medium Impact (Tier 2) 3 1 Low:lm3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 8 of 20 Section # Framing / Rough -In Inspection Complies? Comments/Assumptions & Req.ID C402.4.1, The building envelope contains a ❑Complies Requirement will be met. C402.4.2 continuous air barrier that is sealed In ❑Does Not [FR16]1 an approved manner and either ❑Not Observable constructed or tested in an approved manner. Air barrier penetrations are ❑Not Applicable sealed in an approved manner. C402.4.3, Factory -built fenestration and doors ❑Complies Requirement will be met. C402.4.4 are labeled as meeting air leakage ❑Does Not [FR18]3 requirements. ❑Not Observable ❑Not Applicable C402.4.7 Vestibules are installed on all building ❑Complies Exception: Doors that open directly from a space =3000 ft2. [FR17]3 entrances. Doors have self-closing ❑Does Not devices. ❑Not Observable ❑Not Applicable C402.3.3, Vertical fenestration U -Factor. ❑Complies See the Envelope Assemblies table for values. C402.3.4 ❑Does Not [FR8]1 ❑Not Observable ❑Not Applicable C402.3.3 Vertical fenestration SHGC value. ❑Complies See the Envelope Assemblies table for values. [FR10]1 ❑Does Not ❑Not Observable ❑Not Applicable C303.1.3 Fenestration products rated in ❑Complies Requirement will be met. [FR12]2 accordance with NFRC. ❑Does Not ❑Not Observable ❑Not Applicable C303.1.3 Fenestration products are certified as ❑Complies Requirement will be met. [FR13]1 to performance labels or certificates ❑Does Not provided. ❑Not Observable ❑Not Applicable 0402.2.7 U -factor of opaque doors associated ❑Complies See the Envelope Assemblies table for values. [FR14]' with the building thermal envelope ❑Does Not meets requirements. []Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1)#4 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 9 of 20 #Plumbing Rough -In Inspection Complies? Comments/Assumptions & Req. IDI I - - C404.3'Temperature controls installed on []Complies Requirement will be met. [PL5]3 service water heating systems (110 F ❑Does Not for dwelling units and lavatories In public restrooms and 90 F for other ❑Not Observable ❑Not Applicable occupancies.) C404.2 - Heat traps installed on non -circulating ❑Complies Requirement will be met. [PL4]3 storage water tanks. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 JHIgh Impact (Tier 1) e -1l Medium Impact (Tier 2) 13 ILow Impact (Tier 3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 10 of 20 ,Section - # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Reci.ID C403.2.3 HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values. [ME55]2 ❑Does Not ❑Not Observable ❑Not Applicable C402.4.5. Stair and elevator shaft vents have ❑Complies Exception: Requirement does not apply. 1 motorized dampers that automatically ❑Does Not [ME313 close. []Not Observable ❑Not Applicable C402.4.5. Outdoor air and exhaust systems have ❑Complies Exception: Requirement does not apply. 2 motorized dampers that automatically ❑Does Not [ME58]3 shut when not in use and meet ❑Not Observable maximum leakage rates. Check gravity dampers where allowed. ❑Not Applicable C403.2.5. Demand control ventilation provided ❑Complies Requirement will be met. 1 for spaces >500 sq.ft. and >25 ❑Does Not [ME59]1 people/1000 sq.ft, occupant density ❑Not Observable and served by systems with air side ❑Not Applicable economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. C403.4.2 VAV fan >= 7.5 hp are driven by ❑Complies Exception: Requirement does not apply. [ME75)2 mechanical or electrical variable ❑Does Not speed drive, or driven by vane -axial with variable speed blades, or operate ❑Not Observable See the Mechanical Systems list for values. with motor demand <=30% design ❑Not Applicable kW at 50% design flow - calculations required C403.2.7 HVAC ducts and plenums insulated. ❑Complies Requirement will be met. [ME60]' Where ducts or plenums are installed ❑Does Not in or under a slab, verification may ❑Not Observable need to occur during Foundation ❑Not Applicable _ Inspection. C403.2.8 HVAC piping insulation thickness. ❑Complies Requirement will be met. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur ❑Not Observable during Foundation Inspection. ❑Not Applicable C403.2.8 HVAC piping Insulation thickness. ❑Complies Exception: Piping within HVAC equipment. [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur ❑Not Observable during Foundation Inspection. ❑Not Applicable C403.2.8. Piping Insulation exposed to weather ❑Complies Requirement will be met. 1 is protected from damage (due to sun, ❑Does Not [ME7]3 moisture, wind, etc.). ❑Not Observable ❑Not Applicable C403.2.8 Thermally ineffective panel surfaces of ❑Complies Requirement will be met. [ME41]3 sensible heating panels have ❑Does Not insulation >= R-3.5. ❑Not Observable ❑Not Applicable C403.3.1. Total cooling capacity without ❑Complies Requirement will be met. a economizers must be less than ❑Does Not [NA]° %varMaxKBtu PerH%. ❑Not Observable ❑Not Applicable C403.2.7 Ducts and plenums sealed based on ❑Complies Requirement will be met. [ME10]' static pressure and location. ❑Does Not ❑Not Observable ❑Not Applicable 11 High Impact (Tier 1) 1 u.`_ Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 11 of 20 Section # Mechanical Rough -In Inspection Compiles? Comments/Assumptions & Re .ID C403.2.7. Ductwork operating >3 in. water ❑Complies Exception: Requirement does not apply. 1.3 - column requires air leakage testing. ❑Does Not [MEll]3 ❑Not Observable ❑Not Applicable C403.2.7. Ductwork operating >3 in. water [Complies Exception: Requirement does not apply. 1.3 column requires air leakage testing. ❑Does Not [ME11]3 []Not Observable ❑Not Applicable C403.3.1, Air economizers provided where ❑Complies Requirement will be met. C403.3.1. required, meet the requirements for ❑Does Not 1design [ME62]1 capacity, control signal, ventilation controls, high -limit shut-off, ❑Not Observable integrated economizer control, and ❑Not Applicable provide a means to relieve excess outside air during operation. C408.2.2. Air outlets and zone terminal devices ❑Complies Requirement will be met. 1 have means for air balancing. []Does Not [ME53]3 ❑Not Observable ❑Not Applicable C403.2.10 HVAC fan systems at design ❑Complies Requirement will be met. .1 conditions do not exceed allowable ❑Does Not [ME65]3 fan system motor nameplate hp or fan ❑Not Observable See the Mechanical Systems list for values. system bhp. ❑Not Applicable C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- []Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor []Not Applicable demand. C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or []Not Observable have controls to limit fan motor ❑Not Applicable demand. C403.4.2 VAV fan motors >=7.5 hp to be driven []Complies Exception: Requirement does not apply. [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor []Not Applicable demand. C403.4.2. VAV fans have static pressure sensors ❑Complies Requirement will be met. 1 positioned so setpoint <=1/3 total ❑Does Not [ME67]2 design pressure. ❑Not Observable ❑Not Applicable C403.4.2. Reset static pressure setpoint for DDC ❑Complies Requirement will be met. 2 controlled VAV boxes reporting to ❑Does Not [ME24]2 central controller based on the zones []Not Observable requiring the most pressure. ❑Not Applicable C403.2.6 Exhaust air energy recovery on ❑Complies [ME57]1 systems meeting Table C403.2.6 ❑Does Not ❑Not Observable []Not Applicable C403.2.11 Unenclosed spaces that are heated ❑Complies Exception: Requirement does not apply. [ME71]2 use only radiant heat. ❑Does Not ❑Not Observable [:]Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) '.3. Low Impact(Tier 3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 12 of 20 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13,.. Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 13 of 20 Section # Rough -In Electrical Inspection Complies? Comments/Assumptions ' & Req.ID C405.2.2. Automatic controls to shut off all ❑Complies Exception: Emergency egress lighting. 1 building lighting Installed in all []Does Not [EL2212 buildings. []Not Observable ❑Not Applicable C405.2.1. Independent lighting controls installed ❑Complies Exception: Lighting that is related to means of egress in 1 per approved lighting plans and all []Does Not stairways or corridors. [EL23]2 manual controls readily accessible and []Not Observable visible to occupants. []Not Applicable 0405.2.1. Lighting controls installed to uniformly ❑Complies Exception: Areas with only one luminaire of less than 100 2 reduce the lighting load by at least ❑Does Not watts. [EL15]1 50%. ❑Not Observable ❑Not Applicable C405.2.2. Daylight zones provided with ❑Complies Exception: Enclosed daylight zones with two or fewer light 3 individual controls that control the ❑Does Not fixtures do not require a separate switch for general area [EL16]1 lights Independent of general area [-]Not Observable lighting. lighting. ❑Not Applicable C405.2.3 Sleeping units have at least one ❑Complies Exception: Requirement does not apply. [EL17]3 master switch at the main entry door ❑Does Not that controls wired luminaires and ❑Not Observable switched receptacles. ❑Not Applicable C405.2.2. Occupancy sensors installed in ❑Complies Exception: Automatic -on controls are allowed in corridors, 2 required spaces. ❑Does Not stairways, restrooms, primary building entrance areas and [EI -1811 ❑Not Obseryable lobbies, and areas where manual -on controls could impact safety or security. ❑Not Applicable 0405.2.2. Primary sidelighted areas are ❑Complies Requirement will be met. 3 equipped with required lighting ❑Does Not [EL20]1 controls. ❑Not Observable ❑Not Applicable 0405.2.2. Enclosed spaces with daylight area ❑Complies Exception: Requirement does not apply. 3 under skylights and rooftop monitors ❑Does Not [EL2111 are equipped with required lighting ❑Not Observable controls. ❑Not Applicable Automatic lighting controls for exterior ❑Complies Requirement will be met. lighting installed. ❑Does Not r ❑Not Observable a ❑Not Applicable C405.2.3 Separate lighting control devices for ❑Complies Requirement will be met. [EL4]1 specific uses installed per approved ❑Does Not lighting plans. ❑Not Observable ❑Not Applicable C405.3 Fluorescent luminaires with odd ❑Complies Exception: Requirement does not apply. [EL19]3 numbered lamp configurations that ❑Does Not are within 10 feet center to center (if ❑Not Observable recess mounted) or are within 1 foot ❑Not Applicable edge to edge (if pendant or surface mounted) shall be tandem wired. C405.4 Exit signs do not exceed 5 watts per ❑Complies Requirement will be met. [EL6]1 face, ❑Does Not ❑Not Observable ❑Not Applicable 1 High Impact (Tier 1) 2. Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 14 of 20 # I Rough -in Electrical Inspection I Compiles? Comments/Assumptions C405.6 Exterior grounds lighting over 100 W ❑Complies Requirement will be met. [EL24]1 provides >60 Im/W unless on motion ❑Does Not sensor or fixture is exempt from scope of code or from external LPD. []Not Observable ❑Not Applicable C405.2.3 ,Additional interior lighting power ❑Complies Requirement will be met. [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and [-]Not Observable separated from general lighting. ❑Not Applicable Additional Comments/Assumptions: 1 JlHigh Impact (Tier 1) ",,,I Medium Impact (Tier 2) iii Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 15 of 20 Section # Insulation Inspection 7 Complles7 Comments/Assumptions & Re .ID C402.4.1. All sources of air leakage in the ❑Complies Requirement will be met. 1 building thermal envelope are sealed, ❑Does Not [IN111 caulked, gasketed, weather stripped []Not Observable or wrapped with moisture vapor- ❑Not Applicable permeable wrapping material to minimize air leakage. C402.4.2. Roof R -value. For some ceiling ❑Complies See the Envelope Assemblies table for values. 1 systems, verification may need to []Does Not [IN2]1 occur during Framing Inspection. []Not Observable ❑Not Applicable C303.2 Roof insulation installed per ❑Complies Requirement will be met. [IN3)1 manufacturer's instructions. Blown or ❑Does Not poured loose -fill insulation is installed ❑Not Observable only where the roof slope is <=3 in ❑Not Applicable 12. C303.2 Above -grade wall insulation Installed ❑Complies Requirement will be met. [IN711 per manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable C303.1 Building envelope insulation is labeled ❑Complies Requirement will be met. [IN1012 with R -value or insulation certificate ❑Does Not providing R -value and other relevant ❑Not Observable data. ❑Not Applicable C303.2.1 Exterior insulation is protected from ❑Complies Exception: Requirement does not apply. [IN14)2 damage with a protective material. ❑Does Not Verification for exposed foundation []Not Observable insulation may need to occur during ❑Not Applicable Foundation Inspection. C402.2.1 Insulation intended to meet the roof ❑Complies Requirement will be met. [IN1713 insulation requirements cannot be ❑Does Not installed on top of a suspended ❑Not Observable ceiling. Mark this requirement compliant If insulation is installed ❑Not Applicable accordingly. Additional Comments/Assumptions: 1 JHIgh Impact (Tier 1) 2 1 Medium Impact (Tier 2) 13. Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 16 of 20 Section #. Final Inspection Complles7 Comments/Assumptions & Req.ID C402.4.6 '', weatherseals installed on all loading ❑Complies Exception: Requirement does not apply. [FI37]1 '.dock cargo doors. ❑Does Not ❑Not Observable ❑Not Applicable 0403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. []Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification []Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI4713 Minimum one humidity control device [:]Not Observable per Installed humidification/dehumidification ❑Not Applicable system. C403.2.4. Thermostatic controls have a 5 OF ❑complies Requirement will be met. 2 deadband. ❑Does Not [FI3813 ❑Not Observable []Not Applicable C403.2.4. Temperature controls have setpoint ❑Complies Requirement will be met. 2 overlap restrictions. ❑Does Not [F12013 ❑Not Observable ❑Not Applicable 0403.2.4. Each zone equipped with setback ❑Complies Requirement will be met. 3 controls using automatic time clock or ❑Does Not [FI3913 programmable control system. ❑Not Observable ❑Not Applicable C403.2.4. Automatic Controls: Setback to 55°F ❑Complies Requirement will be met. 3. (heat) and 85°F (cool); 7 -day clock, 2- ❑Does Not (F140]3 hour occupant override, 10 -hour ❑Not Observable backup ❑Not Applicable C408.2.5. Furnished HVAC as -built drawings ❑Complies Requirement will be met. 1 submitted within 90 days of system []Does Not [FI7]3 acceptance. ❑Not Observable ❑Not Applicable C303.3, Furnished O&M manuals for HVAC ❑Complies Requirement will be met. C408.2.5. systems within 90 days of system ❑Does Not 3 [F18]3 acceptance. ❑Not Observable ❑Not Applicable C408.2.5. An air and/or hydronic system ❑Complies Requirement will be met. 3 balancing report is provided for HVAC ❑Does Not [FI4311 systems. ❑Not Observable ❑Not Applicable C408.2.3. HVAC control systems have been ❑Complies Requirement will be met. 2 tested to ensure proper operation, ❑Does Not (FI1011 calibration and adjustment of controls. ❑Not Observable ❑Not Applicable C404.3 Public lavatory faucet water ❑Complies Requirement will be met. [FIJI]3 temperature <=110°F. ❑Does Not ❑Not Observable ❑Not Applicable 1 JHIgh Impact (Tier 1) 't .y:. Medium Impact (Tier 2) 3.1 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 17 of 20 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C404.5 First 8 It of outlet piping is insulated ❑Complies Requirement will be met. [FI45]2 ❑Does Not ❑Not Observable ❑Not Applicable C402.4.8 Recessed luminaires in thermal ❑Complies Requirement will be met. [FI26]3 envelope to limit infiltration and be IC ❑Does Not rated and labeled. Seal between ❑Not Observable interior finish and luminaire housing. ❑Not Applicable C403.2.2 HVAC systems and equipment [Complies Requirement will be met. [F12713 capacity does not exceed calculated ❑Does Not loads. ❑Not Observable ❑Not Applicable C408.2.5. Furnished as -built drawings for ❑Complies Requirement will be met. 1 electric power systems within 30 days ❑Does Not [FI16]3 of system acceptance. ❑Not Observable ❑Not Applicable C303.3, Furnished 0&M instructions for ❑Complies Requirement will be met. C408.2.5. systems and equipment to the ❑Does Not 2 building owner or designated ❑Not Observable (FI17]3 representative. ❑Not Applicable C405.5.2 Interior Installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. (FI18]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting ❑Not Observable plans, demonstrating proposed watts ❑Not Applicable are less than or equal to allowed watts. C405.6.2 Exterior lighting power is consistent ❑Complies See the Interior Lighting fixture schedule for values. [FI19)1 with what is shown on the approved ❑Does Not lighting plans, demonstrating ❑Not Observable proposed watts are less than or equal ❑Not Applicable to allowed watts. C408.2.1 Commissioning plan developed by ❑Complies Requirement will be met. [FI2811 registered design professional or ❑Does Not approved agency. ❑Not Observable ❑Not Applicable C408.2.4 Preliminary commissioning report ❑Complies Requirement will be met. [F12911 completed and certified by registered ❑Does Not design professional or approved [-]Not Observable agency. ❑Not Applicable 0408.2.5. Final commissioning report due to ❑Complies Requirement will be met. 4 building owner within 90 days of ❑Does Not [F13011 receipt of certificate of occupancy. ❑Not Observable ❑Not Applicable C408.2.3. HVAC equipment has been tested to ❑Complies Requirement will be met. 1 ensure proper operation. ❑Does Not [FI3111 []Not Observable ❑Not Applicable C408.2.3. Economizers have been tested to [Complies Requirement will be met. 3 ensure proper operation. ❑Does Not [FI32]1 ❑Not Observable ❑Not Applicable 111 High Impact (Tier 1) i�t>, Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 18 of 20 a Section # Final Inspection Complies? Comments/Assumptions A Re .ID C408.3 Lighting systems have been tested to ❑Complies Requirement will be met. IFI33]1 ensure proper calibration, adjustment, ❑Does Not . programming, and operation. ❑Not Observable ❑Not Applicable C408.3 Lighting systems have been tested to ❑Complies Requirement will be met. [FI4811 ensure proper calibration, adjustment, ❑Does Not programming, and operation. ❑Not Observable ❑Not Applicable C406 Efficient HVAC performance, efficient ❑Complies Requirement will be met. [FI3411 lighting system, or on-site supply of ❑Does Not renewable energy consistent with ❑Not Observable what is shown the approved plans. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)r.J Medium Impact (Tier 2) -3 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 19 of 20 Project Title: Rigby Eye Care Report date: 08/16/16 Data filename: Page 20 of 20