Loading...
HomeMy WebLinkAboutMEETING MINUTES - 17-00583 - 235 S 4th W - Duplex ConversionCITY OF REXBURG America's Family Community Meeting with the Higham's and Inspectors on 25 September 2017, on the subject of Converting their Single Family Residence to a Duplex at 235 S 41h W, Rexburg Idaho, 83440. Permit #17-00583 Disclaimer: Only the main requirements were discussed at this meeting to comply as a duplex. Upon inspections other things may come up that need to be corrected. This is why we strongly suggest that before work is done or questions rise, please contact: Bret Stoddard for electrical questions Don Allen for plumbing and mechanical questions Larry Beesley for building questions Quinton Owens for plan & zoning questions. Note: Must have permits for building, mechanical, plumbing, and electrical transformations. Building Requirements: Complete Separation. o Ceiling 1 layer of 5/8" type X drywall. o Any wall that is separating residences must have to 1 layer of 5/8" type X layer on each side as well. Stairs heading into residence o Single elevation change of 7 %" rise and Landing 3' between steps. This allows for no railings needed. Smoke Alarms o Must be hard wired. 1 in each bedroom 1 outside the bedrooms as well. o No gas appliances or attached garage so no Carbon monoxide detectors need. Egress Windows in downstairs basement. o From the Floor to the bottom of the window, 44" Max. o Must have a permanent step. • This can be 2.5" wide or wider. • Can use a dresser or some type of furniture. • This must be fixed in place and provided by the owner. Mechanical Requirements: (must be done by licensed contractor) 2 Separate Heating Systems o Must have permanent heating and not space heaters. Plumbing Requirements: (must be done by licensed contractor) Must have separate water supply, this is an absolute must. o Unit 1 must be able to shut off without hindering the water supply to Unit 2. • There are many ways to do this: • Splitting the piping • Two different water heaters if needed. • Etc. o Overall ask before it gets done so this can be as cheap as possible. o This can be on the same meter Electrical Requirements: (must be done by a licensed contractor) Meter must be covered Separate meters are needed for each unit. o Talked about a dual meter system. o Talked about raising the ground around property instead of moving the meter down. Would be okay as long as it followed the following requirements • Dirt cannot be piled above foundation • Landing of 3' deep and 30" Wide or the width of the electrical panel if the panel is wider than 30". • Ask before you do. Planning & Zoning Requirements: - Parking 0 4 spaces needed (2 per unit) • Must be off-road. o Easement is required on adjacent property if needed to access parking spaces. Building Department Cf/�L6 Date o2�