Loading...
HomeMy WebLinkAboutLOAD SHORT FORM - 17-00565 - 1135 Stone Dr - New SFR-+i+ wrightsoft Load Short Form Modern Plumbing Heating Electric Project Information For: Cody Puzey, Kartchner Homes 3758 Yellowstones Hwy, Idaho Falls, Id 83401 Phone: 208-529-2116 Job: FS6B7 Date: 2121/17 By: ROOM NAME Area (ft') Design Information Htg AVF (cfm) Clg AVF (Cfm) Htg Clg Infiltration 1014 Outside db ('F) -6 89 Method Simplified Inside db (°F) 68 75 Construction quality Semi -tight Design TO (°F) 74 14 Fireplaces 0 Daily range 2449 H 74 105 Inside humidity (%) 50 50 1196 54 Moisture difference (gr/Ib) 57 -31 2736 378 HEATING EQUIPMENT 31 COOLING EQUIPMENT Make Goodman Mfg. 8309 3263 Make Goodman Mfg. 271 Trade GOODMAN 798 4391 Trade GOODMAN, JANITROL, AMANA DISTI... Model GMSS960603BN 96 Room 12 Cond GSX130241D* 818 AHRI ref 7365096 25 2 Coil CA*F1824*6D* 256 2212 820 67 AHRI ref 4700003 Pn IR Efficiency 96.1 AFUE CCn Efficiency 11.0 EER, 13 SEER Heating input 60000 Btuh Sensible cooling 16100 Btuh Heating output 58000 Btuh Latent cooling 6900 Btuh Temperature rise 73 OF Total cooling 23000 Btuh Actual air flow 859 cfm Actual air flow 859 cfm Air flow factor 0.030 cfm/Btuh Air flow factor 0.083 cfm/Btuh Static pressure 0.70 in H2O Static pressure 0.70 in H2O Space thermostat Load sensible heat ratio 1.00 ROOM NAME Area (ft') Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (Cfm) Room1 247 2902 1014 88 84 Room2 86 1073 469 33 39 Room3 50 508 196 15 16 Room4 150 2449 1261 74 105 Room5 144 1786 1196 54 99 Room7 162 2736 378 83 31 Room6 830 8309 3263 252 271 Room11 798 4391 1156 133 96 Room 12 63 818 19 25 2 Room13 256 2212 820 67 68 Pn IR 97n 4414 CCn n., YU Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. s�. 2017 -Sep -12 07:10:00 wright$Oft' RightSuite® Universal 2017 17.0.10 RSU20477 Page l ...with Basement\FS07 charlotte with hasement.rup Calc =MJ8 House Front faces: SW Entire House 2955 28316 10330 859 859 Other equip loads 5618 1063 Equip. @ 0.94 RSM 10710 Latent cooling 0 II- GJJJ JJJJJ IVI IV OJD OQU Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2017-Sep.12 07:10:00 WrightSOft' Rig htSuite® Universal 2017 17.0.10 RSU20477 Paget ...vrith Baseou,unFS6B7 charlotte vnth basement.rup Cale = MJB House Front faces: SW Building Analysis Job: FS6B7 wrightsoft Date: 2/21/17 By: Modern Plumbing Heating Electric Project• • For: Cody Puzey, Kartchner Homes 3758 Yellowstones Hwy, Idaho Falls, Id 83401 Phone: 208-529-2116 Heating Component Design Btuh % of load Walls Location: 11150 Indoor: Heating Cooling Idaho Falls, ID, US 20.9 Indoor temperature (°F) 68 75 Elevation: 4741 ft Ceilings Design TD (°F) 74 14 Latitude: 44°N 1.5 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 57.0 -31.5 Drybulb(°F) -6 89 Infiltration: 0 Dailyrange (°F) - 34 (H ) Method Simplified 0 Wet bulb (°F) - 60 Construction quality Semi -tight Adjustments Wind speed (mph) 15.0 7.5 Fireplaces 0 Heating Component Btuh/2 Btuh % of load Walls 4.4 11150 32.9 Glazing 23.7 7104 20.9 Doors 11.1 466 1.4 Ceilings 1.5 2468 7.3 Floors 1.5 1978 5.8 Infiltration 2.4 5150 15.2 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation 5618 16.6 Adjustments 0 Total 33935 100.0 Cooling Component Btu h/ft' Btuh % of load Walls 0.3 802 7.0 Glazing 25.1 7523 66.0 Doors 2.8 117 1.0 Ceilings 0.8 1401 12.3 Floors 0 0 0 Infiltration 0.2 487 4.3 Ducts 0 0 Ventilation 1063 9.3 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 11393 100.0 Latent Cooling Load = 0 Btuh Overall U -value =0.052 BtuhW °F Data entries checked. 2017 -Sep -12 07:10:00Wti htsftRig htSuite® Universal 201717.0.10 RSU20477 Page ...with Basement\FS6B7 charlotte with basement.rup Calc= NU8 House Front faces: SW + wrightsoft Component Constructions Modern Plumbing Heating Electric For: Cody Puzey, Kartchner Homes 3758 Yellowstones Hwy, Idaho Falls, Id 83401 Phone: 208-529-2116 Job: FS6B7 Date: 2121117 By: Design 75 0.320 0 23.7 1776 23.9 Location: ne Indoor: Heating Cooling 23.7 Idaho Falls, ID, US 23.9 Indoor temperature (°) se 68 75 0 Elevation: 4741 ft 95 Design TD (°F) 122 74 14 0.320 Latitude: 440N 23.7 Relative humidity (%) 30.4 50 50 25 Outdoor: Heating Cooling 0 Moisture difference (gr/Ib) 57.0 -31.5 598 Drybulb(°F) -6 89 24 Infiltration: 0 23.7 568 23.9 Dailyrange (°F) - 34 (H ) Method Simplified 0 23.7 Wet bulb (°F) - 60 25.1 Construction quality Semi -tight 42 0.150 Wind speed (mph) 15.0 7.5 11.1 Fireplaces 0 117 1668 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 1287 ft' ElmN-F fl-'Fffim amp Btuh BluhV Btuh Walls 49 0.020 0 1.48 73 15819-Owc-6: Bg wall, heavy dry or light damp soil, 2'W" wood int frm, ne 438 0.043 19.0 3.60 1578 0.04 17 concrete wall, r-19 cav ins, 8" thk, 1/2" gypsum board int fnsh se 185 0.043 19.0 3.82 705 0.06 11 sw 113 0.043 19.0 3.82 430 0.06 7 nw 205 0.043 19.0 3.67 750 0.05 9 all 940 0.043 19.0 3.69 3464 0.05 44 Frm wall, vnl ext, 318" wood shth, r-22 cav ins, 1/2" gypsum board int ne 448 0.065 22.0 4.81 2155 0.47 213 fnsh, 2"x6" wood frm, 16" o.c. stud: Frm wall, vnl ext, 3/8" wood shth, se 346 0.065 22.0 4.81 1664 0.47 164 r-22 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud sw 478 0.065 22.0 4.81 2299 0.47 227 nw 326 0.065 22.0 4.81 1568 0.47 155 all 1598 0.065 22.0 4.81 7686 0.47 758 Partitions (none) Windows 61 Q 61 Q 6.67 ft head ht Doors Door, wd so type: Door, wd so type Ceilings 168-50ad: Attic ceiling, asphalt shingles roof mat, r-50 cell ins, 1/2" gypsum board int fnsh Floors 21A -32c: Bg floor, heavy dry or light damp soil, 8' depth, carpel fir fnsh ne 75 0.320 0 23.7 1776 23.9 1793 ne 122 0.320 0 23.7 2889 23.9 2917 se 4 0.320 0 23.7 95 30.4 122 sw 50 0.320 0 23.7 1184 30.4 1520 nw 25 0.320 0 23.7 592 23.9 598 nw 24 0.320 0 23.7 568 23.9 574 all 300 0.320 0 23.7 7104 25.1 7523 sw 42 0.150 0 11.1 466 2.78 117 1668 0.020 50.0 1.48 2468 0.84 1401 1287 0.020 0 1.48 1905 0 0 49 0.020 0 1.48 73 0 0 all 1336 0.020 0 1.48 1978 0 0 $ 00 Wift' 191il Right -Suites) UnWersal 2017 17.0.10 RSU20477 ton-Sep-1207:Page ageI 1 ...with Basement\F5687 charlotte with basemenl.mp Cato =MJB House Front faces: SW 2017 -Se 12 07:10:00 �4+� wrightsoftr Right -Suite® Universal 2017 17.0.10 RSU20477 p Paget /RsGR ...with 3asemenAFS887 charlotte with hasement.rup Calc= MJ8 House Front faces: SW Prot SJob: FS697 �+ wrightsoft Project Summary Date: 2121117 By: Modern Plumbing Heating Electric Project Information For: Cody Puzey, Kartchner Homes 3758 Yellowstones Hwy, Idaho Falls, Id 83401 Phone: 208-529-2116 Notes: Heating Equipment Summary Cooling Equipment Summary Make Goodman Mfg. Weather: Idaho Falls, ID, US Make Goodman Mfg. Winter Design Conditions Summer Design Conditions Outside db -6 OF Outside db 89 OF Inside db 68 OF Inside db 75 OF Design TD 74 OF Design TO 14 OF Daily range H Efficiency Relative humidity 50 % Heating input 60000 Moisture difference -31 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 28316 Btuh Structure 10330 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (82 cfm) 5618 Btuh Central vent (82 cfm) 1063 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Static pressure 0.70 in H2O Equipment load 33935 Btuh Use manufacturer's data n Load sensible heat ratio Rate/swing multiplier 0.94 Infiltration Equipment sensible load 10710 Stuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Semi -tight Fireplaces 0 Structure -677 Btuh Ducts 0 Btuh Heating Cooling Central vent 82 cfm) -1477 Btuh Area (ft') 2955 2955 Equipment la ent load 0 Btuh Volume (Its) 20539 20539 Air changes/hour 0.22 0.11 Equipment total load 10710 Btuh Equiv. AVF (cfm) 75 38 Req. total capacity at 0.70 SHR 1.3 ton Heating Equipment Summary Cooling Equipment Summary Make Goodman Mfg. Make Goodman Mfg. Trade GOODMAN Trade GOODMAN, JANITROL, AMANA DISTI... Model GMSS960603BN Cord GSX130241D* AHRI ref 7365096 Coil CA*F1824*6D* AHRI ref 4700003 Efficiency 96.1 AFUE Efficiency 11.0 EER, 13 SEER Heating input 60000 Btuh Sensible cooling 16100 Btuh Heating output 58000 Btuh Latent cooling 6900 Btuh Temperature rise 73 OF Total cooling 23000 Btuh Actual air flow 859 cfm Actual air flow 859 cfm Air flow factor 0.030 cfm/Btuh Air flow factor 0.083 cfm/Btuh Static pressure 0.70 in H2O Static pressure 0.70 in H2O Space thermostat Load sensible heat ratio 1.00 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Wrl htSOft' 2017 -Sep -1207:10:00 Right -Suite® U nlversal 201717.0.10 RSU20477 Page 1 ...with easeraennFS6e7 charlotte with basennent.rup Cale =MJ8 House Front faces: SW AED Assessment Job: FS6B7 wrightsoft Date: 2121117 By: Modern Plumbing Heating Electric Project For: Cody Puzey, Kartchner Homes 3758 Yellowstones Hwy, Idaho Falls, Id 83401 Phone: 208-529-2116 JPSian Con Ciitir Location: Indoor: Heating Cooling Idaho Falls, ID, US Indoor temperature (°F) 68 75 Elevation: 4741 ft Design TD (°F) 74 14 Latitude: 440N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 57.0 -31.5 Dry bulb (°F) -6 89 Infiltration: Dailyrange (°F) - 34 (H ) Wet bulb (°F) - 60 Wind speed (mph) 15.0 7.5 Test for Adequate Exposure Diversity wro I �+z i u°ca Maximum hourly glazing load exceeds average by 21.1%. House has adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 0 Btuh 2017 -Sep -12 07:10:00 ��c+�� wrightsoft RightSuite® Universal 201717.0.10 RSU20477 Pagel AId+P ...with Basement\FS687 charlotte with basement.rup Calc= MJ8 House Front faces: SW '►}t' wrightsoft Right -J® Worksheet Modern Plumbing Heating Electric Job: FS6137 Date: 2/21117 By: 1 Room name Entire House Roomi 2 Exposed wall 299.5 It 27.5 ft 3 Room height 9.6 R 10.0 It heat/cool 4 Room dimensions 1.0 x 247.0 ft 6 Room area 2954.8 ft' 247.0 ft' Ty Construction U -value Or HTM Area (ft') Load I Area (ft') I Load number (Btuh/ftMF (Btuh/f P) or perimeter (ft) (Stull) or perimeter (ft) (Btuh) Heat Coal Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 W 15819-0wc-6 0.069 re 3.60 0.04 513 438 1578 17 0 0 0 0 �G 61C 0.320 ne 23.68 23.91 75 0 1776 1793 0 0 0 0 Vy Fun wall, vnl ext, 3 0.065 ne 4.81 0.47 570 448 2155 213 145 115 553 55 --G 61C 0.320 ne 23.68 23.91 122 0 2889 2917 30 0 710 717 11 W 15819-0wo-6 0.069 as 3.82 0.06 185 185 705 11 0 0 0 0 Fun wall, vnl ext, 3 0.065 as 4.81 0.47 350 346 1664 164 130 130 625 62 61C 0.320 as 23.68 30.39 4 0 95 122 0 0 0 0 W 15819-0wo-6 -0.069 sw 3.82 0.06 113 113 430 7 0 0 0 0 Frm wall, vnl ext, 3 0.065 sw 4.81 0.47 570 478 2299 227 0 0 0 0 81C 0.320 sw 23.68 30.39 50 0 1184 1520 0 0 0 0 Door. wd so Woe 0.150 sw 11.10 2.78 42 42 466 117 0 0 0 0 W 15819-0wo-6 0.069 nw 3.67 0.05 230 205 750 9 0 0 0 0 �G 61C 0.320 nw 23.68 23.91 25 0 592 598 0 0 0 0 Vy Fun wall, vnl ext, 3 0.065 nw 4.81 0.47 350 326 1568 155 0 0 0 0 t --G 61C 0.320 nw 23.68 23.91 24 0 568 574 0 0 0 0 C 168-50ad 0.020 - 1.48 0.84 1668 1668 2468 1401 247 247 366 207 F 21A -32c 0.020 1.48 0.00 1287 1287 1905 0 0 0 0 0 F 21A -32c 0.020 1.48 0.00 49 49 73 0 0 0 0 0 61 c)AED excursion0 -89 Envelope loss/gain 23166 9843 2254 952 12 a) Infiltration 5150 487 648 61 b) Roomventilalion 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 28316 10330 2902 1014 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 28316 10330 2902 1014 15 Duct loads 0% 0% 0 0 -0% 0% 0 0 OW.QUoed 288591 108591 29881 1084 A (gym) I I I I I 1 Calculations approved by ACCA to meet all reauirements of Manual J 8th Ed. wrightsoft'Right-Suite®Universal 201717. 2017 -Sep -12 07:10:00 ...with Basemen)\FS6BHou RSU20477 7 charlotte with basemenl.rup Calc MJB House Front Laces: SW Pagel +wrilghtsoft Right -J® Worksheet Modern Plumbing Heating Electric Job: FS6B7 Date: 2121117 By: 1 Room name Rcom2 Room3 2 Exposed wall 9.0 ft 5.0 ft 3 Room height 10.0 ft heat/cool 10.0 ft heaticool 4 Room dimensions 9.0 x 9.5 ft 10.0 x 5.0 it 5 Room area 85.5 W 50.0 W Ty Construction U -value Or HTM Area (f t') Load Area (W) Load number (Btuh/ftMF (6tuh/f P) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross NIP/S Heat Cool 6 W 15B19-0wu6 0.069 no 3.60 0.04 0 0 0 0 0 0 0 0 �G 61C 0.320 ne 23.68 23.91 0 0 0 0 0 0 0 0 Frm wall, vni eat, 3 0.065 ne 4.81 0.47 90 74 356 35 0 0 0 0 61C 0.320 ne 23.68 23.91 16 0 379 383 0 0 0 0 11 W 158194Wc6 0.069 se 3.82 0.06 0 0 0 0 0 0 0 0 Frm wall, vni ext, 3 0.065 se 4.61 0.47 0 0 0 0 50 46 221 22 61C 0.320 se 23.68 30.39 0 0 0 0 4 0 95 122 W 15819-0wo-6 0.069 sw 3.82 0.06 0 0 0 0 0 0 0 0 Frm wall, vni ext, 3 0.065 sw 4.81 0.47 0 0 0 0 0 0 0 0 61C 0.320 sw 23.68 30.39 0 0 0 0 0 0 0 0 Door. wd so tvoe 0.150 sw 11.10 2.78 0 0 0 0 0 0 0 0 W 151319-0wc-6 0.069 nw, 3.67 0.05 0 0 0 0 0 0 0 0 �G 611C 0.320 nw 23.68 23.91 0 0- 0 0 0 0 0 0 Frm wall, vnl ext, 3 0.065 nw 4.81 0.47 0 0 0 0 0 0 0 0 61C 0.320 nw 23.68 23.91 0 0 0 0 0 0 0 0 C 168-50ad 0.020 1.48 0.84 86 86 127 72 50 50 74 42 F 21A32c 0.020 - 1.48 0.00 0 0 0 0 0 0 0 0 F 21A32c 0.020 1.48 0.00 0 0 0 0 0 0 0 0 6 c)AED excursion 4_1 Envelope loss/gain 861 449 1 390 184 12 a) Infiltration 212 20 118 11 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Applianceslather 0 0 Subtotal (lines 6 to 13) 1073 469 508 196 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 1073 469 508 198 15 Duct loads -0% 0% 0 0 -0% 0% 0 0 Total room load 1073 469 508 198 Airrequired(cfm) 33 39 15 16 Calculations aooroved by ACCA to meet all reauirements of Manual J 8th Ed Wrightsoft' 2017 -Sep -12 07:10:00 Right -Su basee®nt.rup Col 2017 17.Hou RSU20477 Page 2 ...with Basemen)\FS6B7 charlotte with basement.rup Calc= MJB House Front faces: SW -I++wrigbtsoft Right -J® Worksheet Modern Plumbing Heating Electric Job: FS6B7 Date: 2121117 By: I Room name Room4 Rooms 2 Exposed wall 24.5 ft 15.0 It 3 Room height 10.0 ft heat/cool 10.0 It heat/cool 4 Room dimensions 11.5 x 13.0 ft 12.0 x 12.0 it 5 Room area 149.5 fP 144.0 fP Ty Consbuctlon U -value Or HTM I Area (W) Load Area (f F) I Load number (Btuh/ft?-F (Stuh/f P) or perimeter (ft) (Bluh) or perimeter (ft) (Btuh) Heat I Cool Gross N/P/S Heat Cool Gross N/P/S Heal Cool 6 W 15B79-0wo-6 0.069 ne 3.60 0.04 0 0 0 0 0 0 0 0 L-� 61C 0.320 ne 23.68 23.91 0 0 0 0 0 0 0 0 Frm wall, vnl ext, 3 0.065 ne 4.81 0.47 0 0 0 0 0 0 0 0 61C 0.320 ne 23.68 23.91 0 0 0 0 0 0 0 0 11 W 15B79-0wn8 0.069 as 3.82 0.06 0 0 0 0 0 0 0 0 Vy Frm wall, vnl ext, 3 0.065 as 4.81 0.47 130 130 625 62 15 15 72 7 -G 61C 0.320 se 23.68 30.39 0 0 0 0 0 0 0 0 W 1513MGWo-6 0.069 sw 3.82 0.06 0 0 0 0 0 0 0 0 Frm wall, vnl ext, 3 0.065 sw 4.81 0.47 115 90 433 43 120 95 457 45 61C 0.320 sw 23.68 30.39 25 0 592 760 25 0 592 760 Door. wd sc Ives 0.150 sw 11.10 2.78 0 0 0 0 0 0 0 0 Vy 15B19-0wo-6 0.069 no, 3.67 0.05 0 0 0 0 0 0 0 0 61C 0.320 nw 23.68 23.91 0 0 0 0 0 0 0 0 W Frm wall, vnl ext, 3 0.065 nw 4.81 0.47 0 0 0 0 15 15 72 7 L -G 61C 0.320 nw 23.68 23.91 0 0 0 0 0 0 0 0 C 16BS0ad 0.020 1.48 0.84 150 150 221 126 144 144 213 121 F 21A -32c 0.020 1.48 0.00 0 0 0 0 0 0 0 0 F 21A -32c 0.020 1.48 0.00 0 0 0 0 18 18 27 0 6 c)AED excursion! 12 222 Envelope loss/gain 1871 1206 1433 1162 12 a) Infiltration 577 55 353 33 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 2449 1261 1786 1196 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 2449 1261 1786 1196 15 Ductloads -0% 0% 0 0 A% 0% 0 0 room loadrequired(cm) 1 1 2449 11051 17541 11991 1 Airt' 1 1 741 1 1 Calculations aooroved by ACCA to meet all requirements of Manual J 8th Ed. wri htoof'it' 2017SepA207:10:00 9 Rigth basements p Colsal = MJ8017 .0.10 RSU20477 Page 3 ...with Basement\FS687 charlotte with basement.rup Calc= MJe House Front faces: SW + wrightsoft Right -J® Worksheet Modern Plumbing Heating Electric Job: FS6B7 Date: 2121117 By: 1 Room name Room7 Room6 2 Exposed wall 33.0 it 70.0 ft 3 Room height 10.0 It heat/wol 10.0 it heal/wol 4 Room dimensions 27.0 x 6.0 ft 1.0 x 829.8 R 5 Room area 162.0 fl' 829.8 ft' Ty Construction Uvalue Or HTM Area (ft') Load Area (ft') Load number (Bt uh/f t? °F (Bt uh/f N) or perimeter (ft) (Stull) or perimeter (ft) (Bluh) Heat Cool Grass N/P/S Heal Cool Gross N/P/S Heat Cool 6 W 15819-0wu6 0.069 ne 3.60 0.04 0 0 0 0 0 0 0 0 I-� 61C 0.320 ne 23.68 23.91 0 0 0 0 0 0 0 0 W Fan wall, vat ext, 3 0.065 ne 4.81 0.47 0 0 0 0 335 259 1246 123 `C 61C 0.320 ne 23.68 23.91 0 0 0 0 76 0 1800 1817 11 W 15819-0wo-6 0.069 as 3.82 0.06 0 0 0 0 0 0 0 0 4y Fran wall, vnl ext, 3 0.065 as 4.81 0.47 0 0 0 0 25 25 120 12 L -G 61C 0.320 se 23.68 30.39 0 0 0 0 0 0 0 0 W 15B19 -Ow" 0.069 sw 3.82 0.06 0 0 0 0 0 0 0 0 4y Frm wall, vnl ext, 3 0.065 sw 4.81 0.47 270 249 1198 118 65 44 212 21 61C 0.320 sw 23.68 30.39 0 0 0 0 0 0 0 0 Door. wd so tvoe 0.150 sw 11.10 2.78 21 21 233 58 21 21 233 58 ly 1019-0wri6 0.069 nw 3.67 0.05 0 0 0 0 0 0 0 0 L ---G 61C 0.320 nw 23.68 23.91 0 0 0 0 0 0 0 0 Frm wall, vat ext, 3 0.065 nw 4.81 0.47 60 60 289 28 275 251 1207 119 61C 0.320 nw 23.68 23.91 0 0 0 0 24 0 568 574 C 168-50ad 0.020 1.48 0.84 162 162 240 136 830 830 1228 697 F 21A -32c 0.020 - 1.48 0.00 0 0 0 0 0 0 0 0 F 21A -32c 0.020 1.48 0.00 0 0 0 0 31 31 46 0 61 c)AED excursion -36 -314 Envelope loss/gain 1959 305 6660 3107 12 a) Infiltration 777 74 1649 156 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 2736 378 8309 3263 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 2736 378 8309 3263 15 Duct bads -0% 0% 0 0 A% 0% 0 0 Total room load 2736 1P 378 83093263 1 Air required(cfm) 83 31 252 271 Calculations awroved by ACCA to meet all recuirements of Manual J 8th Ed. wrightsoft' 2017 -Sep -12 07:10:00 '45 WkRig ht -Su ite® U niv ersal 2017 17.0.10 RSU20477 Page 4 ...with Basemen8FS6B7 charlotte with basement.rup Cale =MJB House Front faces: SW +wrightsoft Right -J® Worksheet Modern Plumbing Heating Electric Job: FS6B7 Date: 2/21/17 By: 1 Room name Room11 Roeml2 2 Exposed wall 55.0 it 17.5 it 3 Room height 9.0 It heat/mol 9.0 It heat/cool 4 Room dimensions 1.0 x 798.3 It 12.5 x 5.0 it 5 Room area 798.3 ft' 62.5 R2 Ty Construction U -value Or HTM Area (it') Load Area (W) Load number (Btuh/ft? °F (Btuhlf N) or perimeter (11) (Btuh) or perimeter (ft) I (Btuh) Heat Cool Gross N/P/S Heat Cool Gross I N/P/S Heat Cool 6 W 15R19-0wc-6 0.069 ne 3.60 0.04 311 261 932 10 0 0 0 0 �G 61C 0.320 ne 23.68 23.91 50 0 1184 1196 0 0 0 0 Fon wall, vni ext, 3 0.065 ne 4.81 0.47 0 0 0 0 0 0 0 0 61C 0.320 no 23.68 23.91 0 0 0 0 0 0 0 0 11 W 15819-0wo-6 0.069 se 3.82 0.06 185 185 705 11 0 0 0 0 Frm wall, vnl ext, 3 0.065 se 4.81 0.47 0 0 0 0 0 0 0 0 61C 0.320 as 23.68 30.39 0 0 0 0 0 0 0 0 W 15B19-0wo-6 0.069 sw 3.82 0.06 0 0 0 0 113 113 430 7 Frm wall, vnl ext, 3 0.065 sw 4.81 0.47 0 0 0 0 0 0 0 0 61C 0.320 sw 23.68 30.39 0 0 0 0 0 0 0 0 Door, wd so Noe 0.150 sw 11.10 2.78 0 0 0 0 0 0 0 0 W 15B19-0wo-6 0.069 nw 3.67 0.05 0 0 0 0 45 45 172 3 �--G 61C 0.320 nw 23.68 23.91 0 0 0 0 0 0 0 0 Frm wall, vnl ext, 3 0.065 mw 4.81 0.47 0 0 0 0 0 0 0 0 61C 0.320 nw 23.68 23.91 0 0 0 0 0 0 0 0 C 1613S0ad 0.020 1.48 0.84 0 0 0 0 0 0 0 0 F 21A -32C 0.020 1.48 0.00 798 798 1181 0 63 63 93 0 F 21A -32c 0.020 1.48 0.00 0 0 0 0 0 0 0 0 61 c) AEG excursion -97 -2 Envelope loss/gain 4003 1120 1 695 8 12 a) Infiltration 389 37 124 12 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 4391 1156 818 19 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 4391 1156 818 19 15 Duct loads -0% 0% 0 0 .0%1 0% 0 0 Total room load 4391 1156 878 19 Air required(cfm) 133 96 25 2 Calculations aGDroved by ACCA to meet all requirements of Manual J 8th Ed 56K -rk wrightsoft- 2017 -Sep -120740:00 AZ Right -harem t.rup sa1201717.0o0RSU20477 Page5 ...with Basement\FS667 charlotte with basemenl.rup Calc= MJB House Front faces: SW +wrightsoft Right -J® Worksheet Modern Plumbing Heating Electric Job: FS6B7 Date: 2/21117 By: 1 Room name Rooml3 Room15 2 Exposed wall 33.0 ft 10.0 ft 3 Room height 9.0 It heat/cool 9.0 ft heat/cool 4 Room dimensions 12.5 x 20.5 ft 10.0 x 17.0 ft 5 Room area 256.3 ft' 170.0 ft' Ty Construction U-valueOr I HTM Area (f N) Load Area (f t') Load number (atuh/ft"F (137 uh/ft') or perimeter (ft) (8tuh) or perimeter (ft) I (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heal Cool 6 V"15619-0w 6 0.069 ne 3.60 0.04 113 113 430 7 90 65 216 1 61C 0.320 ne 23.68 23.91 0 0 0 0 25 0 592 598 VL Frm wall, vnl ext, 3 0.065 ne 4.81 0.47 0 0 0 0 0 0 0 0 --G 61C 0.320 ne 23.68 23.91 0 0 0 0 0 0 0 0 11 W 15819 -Ow 6 0.669 as 3.82 0.06 0 0 0 0 0 0 0 0 4y Frm wall, vat ext, 3 0.065 as 4.81 0.47 0 0 0 0 0 0 0 0 �1' 61C 0.320 as 23.68 30.39 0 0 0 0 0 0 0 0 W 15Bi9-0wc-6 0.069 sw 3.82 0.06 0 0 0 0 0 0 0 0 Frm wall, vnl ext, 3 0.065 sw 4.81 0.47 0 0 0 0 0 0 0 0 61C 0.320 sw 23,68 30.39 0 0 0 0 0 0 0 0 Door. wd sc tvDe 0.150 sw 11.10 2.78 0 0 0 0 0 0 0 0 W 15819-0wo-6 0.069 nw 3.67 0.05 185 160 576 7 0 0 0 0 �-C 61C 0.320 nw 23.68 23.91 25 0 592 598 0 0 0 0 W Frm wall, vni ext, 3 0.065 nw 4.81 0.47 0 0 0 0 0 0 0 0 �G 61C 0.320 nw 23.68 23.91 0 0 0 0 0 0 0 0 C 1613-50ad 0.020 - 1.48 0.84 0 0 0 0 0 0 0 0 F 21A32c 0.020 1.48 0.00 256 256 379 0 170 170 252 0 F 21A32c 0.020 - 1.48 0.00 0 0 0 0 0 0 0 0 61 c)AED excursion 187 -06 Envelope loss/gain 1979 798 1060 552 12 a) Infiltration 233 22 71 7 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 2212 820 1131 559 external load 0 0 0 0 Less transfer 0 0 0 0 [Less Redistribution 0 FOY0 0 0 0 14 Subtotal 2212 820 1131 559 Dud loads -0% 0 -0% 0% 0 0 Total room load 22121 8201 1131 559 Air required(cfm) 67 68 34 46 Calculations approved by ACCA to meet all requirements of Manual J 8th E wri htsof ' 2017 -Sep -1207:10:00 9 Rigth baseme Unlversal201717.0.10RSU20477 Page ...with Basement\FSfiB7 charlotte with basemenlrup Calc=MJB House Front faces: SW Main Floor Job #: FS6137 Performed for: Cody Puzey 3758 Yellowstones Hwy Idaho Falls, Id 83401 Phone: 208-529-2116 Modern Plumbing Heating Electric I Scale: 1 :95 Page 1 RightSuite® Universal 2017 17.0.10 RSU20477 2017Sep-12 07:10:20 ...S6B7 charlotte with basement. Basement Job #: FS6B7 Performed for: Cady Puzey 3758 Yellowstones Hwy Idaho Falls, Id 83401 Phone: 208-529-2116 Modern Plumbing Heating Electric Scale: 1 : 95 Page 2 Right-Suite®Un iversa 12017 17.0.10 RSU20477 2017 -Sep -12 07:10:21 .5687 charlotte with basement.i Duct System Summary Job: FS6B7 wrlghtsUft Date: 2121117 By: Modern Plumbing Heating Electric Project Information For: Cody Puzey, Kartchner Homes 3758 Yellowstones Hwy, Idaho Falls, Id 83401 Phone: 208-529-2116 External static pressure Pressurelosses Available static pressure Supply/ return available pressure Lowest friction rate Actual air flow Total effective length (TEL) Heating 0.70 in H2O 0 in H2O 0.70 in H2O 0.394 / 0.306 in H2O 0.162 in/100ft 859 cfm 432 ft Cooling 0.70 in H2O 0 in H2O 0.70 in H2O 0.394 10.306 in H2O 0.162 in/100ff 859 cfm Name Design (Btuh) Htg (cfm) Clg (cfm) Design FR Diam (in) H x W (in) Duct Matl Actual Ln (ft) Ftg.Egv Ln (ft) Trunk Room1 h 2902 88 84 0.167 6.0 0x0 ShMt 46.0 190.0 st1A Room11 h 2196 67 48 0.168 6.0 0x0 ShMt 24.0 210.0 st1 Room11-A h 2196 67 48 0.163 6.0 0x0 ShMt 42.5 200.0 st1A Room12 h 818 25 2 0.184 6.0 0x0 ShMt 24.0 190.0 st2A Room13 c 820 67 68 0.205 6.0 0x0 ShMt 37.0 155.0 st213 Room15 C 559 34 46 0.180 6.0 0x0 ShMt 28.5 190.0 st2 Room2 C 469 33 39 0.176 6.0 0X0 ShMt 34.0 190.0 st1 Room3 c 196 15 16 0.169 6.0 0x0 ShMt 33.0 200.0 st1B Room4 c 1261 74 105 0.168 6.0 0x0 ShMt 34.0 200.0 st1B Rooms c 1196 54 99 0.194 6.0 0x0 ShMt 23.0 180.0 st1 Rooms C 1088 84 90 0.162 6.0 0x0 ShMt 43.0 200.0 st2A Room6-A C 1088 84 90 0.176 6.0 0x0 ShMt 24.5 200.0 st2 Rwm6-B C 1088 84 90 0.184 6.0 0x0 ShMt 14.0 200.0 st1 Room7 h 2736 83 31 0.201 6.0 0x0 ShMt 16.0 180.0 st2 Name Trunk Type Htg (Cfm) Clg (Cfm) Design FR Veloc (fpm) Diam (in) H x W (in) Duct Material Trunk st1B Peak AVF 90 121 0.168 182 5.6 8 x 12 ShtMetl st1A st1A Peak AVF 244 253 0.163 380 7.5 8 x 12 ShtMetl st1 st1 Peak AVF 482 530 0.163 796 9.8 8 x 12 ShtMetl st2 Peak AVF 377 329 0.162 566 8.7 8 x 12 ShtMetl st2A Peak AVF 176 160 0.162 264 6.5 8 x 12 ShtMetl st2 st213 Peak AVF 67 68 0.205 102 4.4 8 x 12 ShtMetl I st2A 2017-Sep-1207:10wrightsoft" Rig htSPage uiteOUniversal 201717.0.10 RSU20477 Page 1 ...with Basement\FS6137 charlotte with hasement.rup Calc= MJB House Front faces: SW Return Branch Detail Table Name Grille Size (in) Htg (cfm) Clg (cfm) TEL (ft) Design FR Veloc (fpm) Diam (in) H x W (in) Stud/Joist Opening (in) Duct Mall Trunk rbl 0x0 88 84 154.0 0.199 279 4.8 3.25x14 10x9 SJSp rt1A rb2 0x0 158 98 78.0 0.392 500 5.2 3.25x14 10x9 SJSp 433 rb3 0x0 34 46 102.5 0.298 147 3.5 3.25x14 10x9 SJSp rt2 rb4 0x0 67 68 121.5 0.252 216 4.2 3.25x14 10x9 SJSp rt2 rb5 0x0 74 105 188.5 0.162 332 5.4 3.25x14 10x9 SJSp rtl 6 rb6 0x0 54 99 134.0 0.228 315 4.9 3.25x14 10x9 SJSp rt1A rb7 0x0 251 212 102.0 0.300 795 6.6 3.25x14 10x9 SJSp rtl rb8 0x0 132 146 111.0 0.275 461 5.5 3.25x14 10x9 SJSp rtl I Return Trunk Detail Table I}I wright5OW RightSuite® Pege Universal 201717.0.10 RSU20477 2017 -sap -12 o7ae 2 ...vnth Basemen)\FS6137 charlotte with basement.rup Calc= MJB House Front faces: SW Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FR (fpm) (in) (in) Material Trunk rt1B Peak AVF 74 105 0.162 157 5.4 8 x 12 ShtMetl rt1A rt1A Peak AVF 217 289 0.162 433 7.8 8 x 12 ShtMetl rt1 rt1 Peak AVF 600 647 0.162 582 10.6 8 x 20 ShtMetl rt2 Peak AVF 101 115 0.252 172 5.1 8 x 12 ShtMetl I}I wright5OW RightSuite® Pege Universal 201717.0.10 RSU20477 2017 -sap -12 o7ae 2 ...vnth Basemen)\FS6137 charlotte with basement.rup Calc= MJB House Front faces: SW