HomeMy WebLinkAboutPLANS - 17-00426 - 525 S Center St - BYUI Campus - Steam & Condensate ReplacementF 1 1 2 1 3
I
C
W
I
SITE PLAN - ELECTRICAL NORTH
SCALE: 1" = 60'- 0"
0" 60' 120'
M
KEY NOTES
0 COORDINATE WITH OWNER INSTALLED 2" CONDUIT IN COMMON TRENCH.
O2 CAREFULLY HAND EXCAVATE ALONG WALL OF VAULT OR BUILDING. CORE DRILL FOR CONDUIT
PENETRATIONS. SEAL WITH SILICONE AROUND CONDUITS BOTH FROM OUTSIDE AND INSIDE.
TYPICAL FOR ALL VAULT PENETRATIONS.
OPROVIDE AND INSTALL A 120V. 20A CIRCUIT FROM NEAREST ELECTRICAL VAULT TO THIS STEAM
VAULT. INSTALL A GFI RECEPTACLE, SWITCH AND (2) LITHONIA DMW2-L24-4000
CM-AFL-WD-MVOLT-40K FIXTURES. LOCATE SWITCH ADJACENT TO VAULT ENTRY. FIELD LOCATE
LIGHTS AND DEVICES PER OWNER IN FIELD. E.C. SHALL PROVIDE AND INSTALL CONDUIT, VAULT
PENETRATIONS, TRENCHING, BACKFILL, ETC. AS REQUIRED TO ACCOMPLISH THIS WORK.
(ALT #1) O INSTALL NEW DUCT BANK ADJACENT TO EXISTING. TAKE GREAT CARE TO MAINTAIN AND
PROTECT EXISTING DUCT BANK. ANY DAMAGE TO EXISTING SERVICE SHALL BE REPAIRED AND
REPLACED AT CONTRACTORS EXPENSE. ANY DISRUPTION TO EXISTING SERVICES SHALL BE
WORKED CONTINUOUSLY UNTIL SERVICES ARE RESTORED. COORDINATE INSTALLATION WITH
ALL EXISTING UTILITIES.
OCAREFULLY REMOVE EXISTING POLE LIGHT AND PROTECT DURING CONSTRUCTION. CLEAN,
REINSTALL AND RECONNECT AFTER STEAM LINE IS INSTALLED. INSTALL NEW CONDUCTORS AS
REQUIRED.
OREMOVE EXISTING FOUNDATION AND POLE LIGHT IN CONFLICT WITH NEW STEAM LINE.
REINSTALL ON NEW FOUNDATION AS PART OF THIS PROJECT. INSTALL NEW CONDUCTORS TO
ADJACENT POLES AND RECONNECT.
OCORE DRILL AND INSTALL (2) 3" SLEEVES THROUGH BOTTOM OF IT PULL BOX INTO VAULT
BELOW.
(ALT #5) O PROVIDE AND INSTALL 343/0 + GROUND FROM NEW 200A 3P BREAKER THROUGH EXISTING
CONDUIT TO EXISTING VAULT WEST OF THE M.C.
(ALT #5) O PROVIDE AND INSTALL A NEW 200A 3P BREAKER IN EXISTING PANEL-"EHDP".
(ALT #5) 10 REMOVE EXISTING GENERATOR AND ALL ASSOCIATED EQUIPMENT AND TURN OVER TO OWNER.
(ALT #5) 0 2"C., 343/0 + GROUND TO NEW TRANSFORMER. PENETRATE BUILDING AND ROUTE FEEDER
THROUGH BUILDING TO ELECTRICAL ROOM.
(ALT #5)(@ NEW 200A 3P BREAKER IN ENCLOSURE. LABEL "480V. EM. POWER FROM SMITH GENERATOR".
NEW EM FEEDER TO
SMITH BUILDING
5
(ALT #5)(D NEW 150 KVA TRANSFORMER. 480 -120/208V 3PH 4W.
(ALT #5) GPROVIDE AND INSTALL A NEW 400A MB I -LINE WITH (2) 200A 3P BREAKERS. LABEL PANEL-"EML"
(ALT #5)15 PROVIDE 4410 WITH 600V INSULATION FROM EACH EXISTING TRANSFER SWITCHES IN FEEDER
CONDUIT FOR GENERATOR CONTROL.
(ALT #5) 16 PROVIDE AND INSTALL 21/2"C., 443/0 + GROUND FROM EACH NEW 200A BREAKER IN EML TO
EACH EXISTING TRANSFER SWITCH.
(ALT #5) 17 INTERCEPT EXISTING CONDUIT ABOVE DATA ROOM CEILING AND EXTEND 2" CONDUIT TO
EXISTING PANEL.
(ALT #5) 18 CORE DRILL PENETRATIONS AND SEAL WALL AROUND CONDUIT FOR NEW FEEDER
(ALT #5) 19 REMOVE EXISTING CONDUITS AND SEAL WALL.
(ALT #5)20 DISCONNECT AND REMOVE EXISTING J -BOX ABOVE TRANSFER SWITCHES. REMOVE EXISTING
GENERATOR FEEDER TO TRANSFER SWITCHES.
(ALT #5) 21 REMOVE EXISTING TRANSFORMER, LIGHT FIXTURE, RECEPTACLE, LOAD CENTER AND ALL
ASSOCIATED CONDUIT FROM EXISTING VAULT.
(ALT #5) @ PROVIDE AND INSTALL A NEW 60A 3P BREAKER IN EXISTING PANEL201-32" FOR NEW VAULT
POWER. INSTALL A 1"C., 446 + GROUND THROUGH EXISTING ELECTRICAL ROOM IN TESTING
CENTER TO NEW LOAD CENTER IN EXISTING VAULT. UTILIZE EXISTING 4" CONDUIT, INSTALL
VAULT POWER IN 1" NONMETALIC FLEX THRU EXISTING 4" CONDUIT ALONG WITH NEW 200A
FEEDER.
(ALT #5) 23 PROVIDE AND INSTALL ANEW 12 SPACE NEMA 3R LOAD CENTER WITH DOUBLE LUGS AND (4)
20A 1 P BREAKERS IN EXISTING VAULT. INSTALL A NEW GFI RECEPTACLE, SWITCH AND A
LITHONIA DMW2-L24-4000. UTILIZE NON METALLIC CONDUIT IN VAULT.
SPECIAL NOTE:
EC SHALL VISIT THE SITE, AND THOROUGHLY INVESTIGATE EXISTING
CONDITIONS AS THEY RELATE TO THE SCOPE OF WORK INDICATED.
INCLUDE PROVISIONS FOR THESE CONDITIONS IN BID.
V
ENLARGED MCKAY LIBRARY - POWER
SCALE: 1/16" = 1'- 0"
(ALT #5)
0" 16' 32'
ORIGINAL SIGNED BY:
TODD E. PAYNE
DATED ORIGINAL SIGNED:
3-15-2017
ON FILE AT:
PAYNE ENGINEERING INC.
N
P.E. JOB #1716
pNAL �NCi
STE9�o'�c�
4 9
8270
\rFOF`y��
\ADD QP
WO]
IIIIIIIIIIIIII10
PAYNE
Engineering Inc.
Consulting Engineers
1823 E. Center
Pocatello, Idaho 83201
tel (208) 232-4439 fax (208) 232-1435
HEATH
Engineering Company
Mechanical/Electrical/Plumbing Consultants
377 West 800 North Salt Lake City, Utah 84103
Tel: (801) 322-0487 Fax: (801) 322-0490
REVISIONS:
1
03.28.2017
ADDENDUM NO. 2
1888
r
BYU
si
IDAHO +!
W
Q
z O
LU d'
CD
p co
0�af
O
> LU
m
L
C/) a)
U) ry
Q
U
PROJECT DESIGNATION:
11340
PROPERTY PHASE:
CONSTRUCTION DOCUMENTS
HEATH PROJECT No: 17008
CHECKED BY:
DRAWN BY:
DATE: MARCH 15, 2017
SHEET DESCRIPTION
PARTIAL
SITE PLAN
ELECTRICAL
NORTH
SHEET NUMBER
El ■
C
EX. VAULT
n
TI
=31
RE
PA
AN
RE
EXIS,,,..
UP HILL PANEL -"H"
PANEL "I" FEEDER DETAIL
5GALE: NONE
POLE LIGHT
4" ALUMINUM POLE.
EXISTING RELOCTED OR NEW
// / / I i I I I I I / P� BASE LUGS ASOVER
REQ'D.
AG. EGINEERING
SITE
PLAN
- ELECTRICAL
SOUTH
SCALE: 1" = 60'- 0"
0"
60' 120'
E RICKS
�N.
UNDISTURBED OR COMPACTED
EARTH
Fil
POLE LIGHT MOUNTING DETAIL 10
NO 5GALE
KEY NOTES
OPROVIDE AND INSTALL A 120V. 20A CIRCUIT FROM NEAREST ELECTRICAL VAULT TO THIS STEAM
VAULT. INSTALL A GFI RECEPTACLE, SWITCH AND (2) LITHONIA DMW2-L24-4000
CM-AFL-WD-MVOLT-40K FIXTURES. LOCATE SWITCH ADJACENT TO VAULT ENTRY. FIELD LOCATE
LIGHTS AND DEVICES PER OWNER IN FIELD.
OEXISTING PANEL -"I" TO REMAIN. INSTALL ELBOWS AND RISERS TO EXTEND FEEDER CONDUITS
UP TO PANEL.
OPROVIDE AND INSTALL 20FT. OF 4" PERFORATED PIPE IN 24" DEEP TRENCH. ENCASE IN GRAVEL
FOR PANEL DRAINAGE. SEE DETAIL.
OEXISTING 200A DISCONNECT. REMOVE AND REPLACE WITH NEW 18x18 NEMA 3R J -BOX.
O5 REMOVE EXISTING 200A FEEDER CONDUCTORS AND CONDUIT IN CONFLICT WITH NEW STEAM
LINE.
O6 REMOVE EXISTING GROUND BOX.
O7 REMOVE EXISTING POWER LINK CONTROL CABLE IN CONFLICT WITH STEAM LINE.
O8 UTILIZE EXISTING 2" CONDUIT FOR NEW FEEDER TO NEW PANEL -"I" WHENEVER POSSIBLE.
O9 INTERCEPT EXISTING 1" CONDUIT AT EXISTING GROUND BOX AND EXTEND TO EXISTING
PANEL "I". INSTALL (2) NEW POWER LINK CONTROL CABLES FROM BUILDING TO PANEL -"I" AND
RECONNECT (1 SPARE).
10 EXISTING POLE LIGHT LOCATION TO REMAIN. E.C. SHALL CAREFULLY REMOVE POLE. PROTECT
DURING CONSTRUCTION, THEN CLEAN AND REINSTALL ON NEW FOUNDATION.
11 E.C. SHALL REMOVE THIS POLE AND FOUNDATION. TURN POLE AND FIXTURE OVER TO OWNER.
REPAIR AND REPLACE 1" CONDUIT BETWEEN POLES. INSTALL NEW #10 CONDUCTORS TO
REMAINING POLES AND RECONNECT.
12 REMOVE EXISTING FOUNDATION AND REINSTALL NEW AS SHOWN. INSTALL NEW CONDUIT AND
CONDUCTORS BETWEEN POLES.
13 INSTALL A 2" CONDUIT FROM J -BOX UP WALL, THEN LB THROUGH WALL ABOVE CLASSROOM
CEILING TO EXISTING PANEL -"M" FOR NEW FEEDER TO PANEI-21".
14 CORE DRILL WALL PENETRATIONS AS REQUIRED.
15 PROVIDE AND INSTALL A NEW 200A 3P BREAKER IN EXISTING PANEL -"M". LABEL "PANEL -I"
INSTALL A 2"C., 443/0 + GROUND TO EXISTING PANEL "I".
aIF
MOW
WHERE
APRON WITH REBAR
LOCATED IN LAWN AREA.
FINISH GRADE
60
SOD
i�i ii
IF II
1
03.28.2017
ADDENDUM NO. 2
LAWN
r=1 I I-1 I I
-III—III—I
IIII
if
I I IIIb
11 I I r l 11
I
III =_'
❑
❑
I I—III
1-1I-1
I r I I r� 11
I I I I
11=III=1'
—
ANCHOR BOLTS TO SUIT
❑
===-irr�=
l t t l r
�i 1•H
rr–==�
POLE BY E.C.
Z
C?
I—I I I_I
I:I I I a.
41
❑
❑
❑
I1=1II-1
LTi—III
b1
I I
III—II
314" CONDUIT (PVC) 24" MIN.
❑
_1
l� ��
DEPTH. REFER TO PLAN.
❑
❑
a.
❑
POLE BASE WITH 4#5 RE -BARS
❑
111-111-1I1-1
°
LU
AND #3 TIES @ 12" O.C.
12"
i=ll 111 111
-1 11.-1 11-1 11-1 11-1
❑
I 111=111-�
.I 11
3000 PSI MIN.
UNDISTURBED OR COMPACTED
EARTH
Fil
POLE LIGHT MOUNTING DETAIL 10
NO 5GALE
KEY NOTES
OPROVIDE AND INSTALL A 120V. 20A CIRCUIT FROM NEAREST ELECTRICAL VAULT TO THIS STEAM
VAULT. INSTALL A GFI RECEPTACLE, SWITCH AND (2) LITHONIA DMW2-L24-4000
CM-AFL-WD-MVOLT-40K FIXTURES. LOCATE SWITCH ADJACENT TO VAULT ENTRY. FIELD LOCATE
LIGHTS AND DEVICES PER OWNER IN FIELD.
OEXISTING PANEL -"I" TO REMAIN. INSTALL ELBOWS AND RISERS TO EXTEND FEEDER CONDUITS
UP TO PANEL.
OPROVIDE AND INSTALL 20FT. OF 4" PERFORATED PIPE IN 24" DEEP TRENCH. ENCASE IN GRAVEL
FOR PANEL DRAINAGE. SEE DETAIL.
OEXISTING 200A DISCONNECT. REMOVE AND REPLACE WITH NEW 18x18 NEMA 3R J -BOX.
O5 REMOVE EXISTING 200A FEEDER CONDUCTORS AND CONDUIT IN CONFLICT WITH NEW STEAM
LINE.
O6 REMOVE EXISTING GROUND BOX.
O7 REMOVE EXISTING POWER LINK CONTROL CABLE IN CONFLICT WITH STEAM LINE.
O8 UTILIZE EXISTING 2" CONDUIT FOR NEW FEEDER TO NEW PANEL -"I" WHENEVER POSSIBLE.
O9 INTERCEPT EXISTING 1" CONDUIT AT EXISTING GROUND BOX AND EXTEND TO EXISTING
PANEL "I". INSTALL (2) NEW POWER LINK CONTROL CABLES FROM BUILDING TO PANEL -"I" AND
RECONNECT (1 SPARE).
10 EXISTING POLE LIGHT LOCATION TO REMAIN. E.C. SHALL CAREFULLY REMOVE POLE. PROTECT
DURING CONSTRUCTION, THEN CLEAN AND REINSTALL ON NEW FOUNDATION.
11 E.C. SHALL REMOVE THIS POLE AND FOUNDATION. TURN POLE AND FIXTURE OVER TO OWNER.
REPAIR AND REPLACE 1" CONDUIT BETWEEN POLES. INSTALL NEW #10 CONDUCTORS TO
REMAINING POLES AND RECONNECT.
12 REMOVE EXISTING FOUNDATION AND REINSTALL NEW AS SHOWN. INSTALL NEW CONDUIT AND
CONDUCTORS BETWEEN POLES.
13 INSTALL A 2" CONDUIT FROM J -BOX UP WALL, THEN LB THROUGH WALL ABOVE CLASSROOM
CEILING TO EXISTING PANEL -"M" FOR NEW FEEDER TO PANEI-21".
14 CORE DRILL WALL PENETRATIONS AS REQUIRED.
15 PROVIDE AND INSTALL A NEW 200A 3P BREAKER IN EXISTING PANEL -"M". LABEL "PANEL -I"
INSTALL A 2"C., 443/0 + GROUND TO EXISTING PANEL "I".
r L L
12"
PANEL "I" DRAIN DETAIL
GRADE
� I I -III -III -III -III -III -III , ;
COMPACT FILL
4" MIN. 3" MIN.
00
(TYP) (TYP)
z
4" MIN. lo
d,
(TYP) -----= �L----_= * LOCATE ON WEST SIDE
-II OF EXISTING DUCT BANK
RED CONCRETE 5"C 5"C 5"C 2O{
- d , - d'
° ;°
511C 5"CI°-
#4 REBAR � CONDUIT WRAP DUCT BANK WITH REBAR
(TYP FOR (TYPICAL)
36" O.C. FOR ENTIRE PORTION
EACH CORNER) CROSSING AND DRIVEWAY OR
STREETS.
ORIGINAL SIGNED BY:
TODD E. PAYNE
DATED ORIGINAL SIGNED:
3-15-2017
ON FILE AT:
PAYNE ENGINEERING INC.
NOTES:
1. ALL ELBOWS SHALL BE RIGID STEEL LONG SWEEPING.
2. ALL RISERS SHALL BE RIGID STEEL
3. E.C. SHALL MAINTAIN THESE SPECIFIED SPACINGS FOR ALL
CONCRETE ENCASED CONDUITS.
4. E.C. SHALL SWAB EACH SPARE CONDUIT IN ALL NEW DUCT
BANKS, THEN INSTALL A REUSABLE FACTORY DUCT SEAL IN
EACH END TO KEEP CLEAN.
5. E.C. MAY SUBMIT CONFIGURATION MODIFICATIONS FOR APPROVAL
BASED UPON SITE CONDITIONS.
6. REUSABLE DUCT SEAL SHALL BE SUCH AS TYCO MP0326. SIZE TO DUCT.
DUCT BANK DETAIL - A (ALT 41)
%\ONAL FNc�
aQ°� srE9Fo��
co 8270 o
�FOF�y��
\ODD QP/
P.E. JOB #1716
PAYNE
f
ngineering Inc.
Consulting Engineers
1823 E. Center
Pocatello, Idaho 83201
tel (208) 232-4439 fax (208) 232-1435
HEATH
Engineering Company
Mechanical/Electrical/Plumbing Consultants
377 West 800 North Salt Lake City, Utah 84103
SOD
REVISIONS:
1
03.28.2017
ADDENDUM NO. 2
LAWN
❑
❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑
BYU
❑
❑
❑
❑
❑
❑ ❑
❑
❑
❑
LU
12"
❑
❑
❑
❑
❑
13❑
❑
❑
❑
❑
EARTH
co >- CU
❑
❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑
CHECKED BY:
DRAWN BY:
DATE: MARCH 15, 2017
❑
❑
❑
❑
❑
❑ ❑
❑
❑
❑
❑
3E
❑
3C
❑
3E
❑
3C
❑
3E
❑
3E 3E
❑ ❑
3C
❑
DE
❑
3C
❑
3L
❑
❑
00000000
❑
❑
❑
❑
❑ ❑
❑
❑
❑
20FT. 4" PERFORATED
DRAIN PIPE WRAPPED
,... °
WITH FILTER CLOTH
d
d °
12"
°
q.
d
d
q d
d
WASHED
°
GRAVEL
r L L
12"
PANEL "I" DRAIN DETAIL
GRADE
� I I -III -III -III -III -III -III , ;
COMPACT FILL
4" MIN. 3" MIN.
00
(TYP) (TYP)
z
4" MIN. lo
d,
(TYP) -----= �L----_= * LOCATE ON WEST SIDE
-II OF EXISTING DUCT BANK
RED CONCRETE 5"C 5"C 5"C 2O{
- d , - d'
° ;°
511C 5"CI°-
#4 REBAR � CONDUIT WRAP DUCT BANK WITH REBAR
(TYP FOR (TYPICAL)
36" O.C. FOR ENTIRE PORTION
EACH CORNER) CROSSING AND DRIVEWAY OR
STREETS.
ORIGINAL SIGNED BY:
TODD E. PAYNE
DATED ORIGINAL SIGNED:
3-15-2017
ON FILE AT:
PAYNE ENGINEERING INC.
NOTES:
1. ALL ELBOWS SHALL BE RIGID STEEL LONG SWEEPING.
2. ALL RISERS SHALL BE RIGID STEEL
3. E.C. SHALL MAINTAIN THESE SPECIFIED SPACINGS FOR ALL
CONCRETE ENCASED CONDUITS.
4. E.C. SHALL SWAB EACH SPARE CONDUIT IN ALL NEW DUCT
BANKS, THEN INSTALL A REUSABLE FACTORY DUCT SEAL IN
EACH END TO KEEP CLEAN.
5. E.C. MAY SUBMIT CONFIGURATION MODIFICATIONS FOR APPROVAL
BASED UPON SITE CONDITIONS.
6. REUSABLE DUCT SEAL SHALL BE SUCH AS TYCO MP0326. SIZE TO DUCT.
DUCT BANK DETAIL - A (ALT 41)
%\ONAL FNc�
aQ°� srE9Fo��
co 8270 o
�FOF�y��
\ODD QP/
P.E. JOB #1716
PAYNE
f
ngineering Inc.
Consulting Engineers
1823 E. Center
Pocatello, Idaho 83201
tel (208) 232-4439 fax (208) 232-1435
HEATH
Engineering Company
Mechanical/Electrical/Plumbing Consultants
377 West 800 North Salt Lake City, Utah 84103
Tel: (801) 322-0487 Fax: (801) 322-0490
REVISIONS:
1
03.28.2017
ADDENDUM NO. 2
i888
BYU
,.
r IDAHO
� . s
r
LU
Q
W �
z 0 C'7
00
o0Of
o
cq
C —
ZZD
Q
�
mw LU
co >- CU
cl
U
PROJECT DESIGNATION:
11340
PROPERTY PHASE:
CONSTRUCTION DOCUMENTS
HEATH PROJECT No: 17008
CHECKED BY:
DRAWN BY:
DATE: MARCH 15, 2017
SHEET DESCRIPTION
PARTIAL
SITE PLAN
ELECTRICAL
SOUTH
SHEET NUMBER
El
■