Daily Field Diary
Project Name:Mattson Apartments Contractor:Headwaters
Date:7/14/17
Project Number:17001 Weather:Sunny Temperature:82
Client:Headwaters Construction Time start:1:30 PM Time End:3:30 PM
C Concrete Placment
(' Concrete Reinforcement
C' Post Tensioned Concrete
(*- Epoxy Bolt/ Anchors
r Masonry Reinforcement
(� Masonry Grout Placement
( High Strength Grout
C Earthwork Inspection
Structural Steel
C Welding
C High Strength Bolting
Cold Weather Concrete
Observations, Items, and Locations
T
Spray -Applied Fireproofing
(' Roads/ Utilities
(- Other
I arrived on site and began my observations of the epoxy embed hold downs in building 2. 1 observed that
the contractor had already drilled the holes. I observed the contractor blow and brush the holes clean of
powder and loose material. I observed the contractor use Simpson set-Xp10 epoxy to epoxy the bolts into
place. I notified the contractor of my observations prior to leaving.
Deficiencies: Yes Co' No
olq:.w a+,d
Wr4n �
t`
i
w;
K,T-XPIO 183D32W
n123/19
r"
Description: Description: Description:
V"ay sig by iwro Cbmb" n
oe: cn•ia� cnn:�w, o-AbW
Inspector Signature: �,nMS MlS t�,UC,a,e US Certification #:
oau::an.o]al.:n:..%W