Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION - 16-00576 - 117 S 2nd E - Mattson Apts - Bldg B NO 23 UnitsA Allied Testing & Inspection Z 3380aktrail Dc Rexburg, ID 208.970,6237 Daily Field Diary Project Name:Mattson Apartments Contractor:Headwaters Date:7/14/17 Project Number:17001 Weather:Sunny Temperature:82 Client:Headwaters Construction Time start:1:30 PM Time End:3:30 PM C Concrete Placment (' Concrete Reinforcement C' Post Tensioned Concrete (*- Epoxy Bolt/ Anchors r Masonry Reinforcement (� Masonry Grout Placement ( High Strength Grout C Earthwork Inspection Structural Steel C Welding C High Strength Bolting Cold Weather Concrete Observations, Items, and Locations T Spray -Applied Fireproofing (' Roads/ Utilities (- Other I arrived on site and began my observations of the epoxy embed hold downs in building 2. 1 observed that the contractor had already drilled the holes. I observed the contractor blow and brush the holes clean of powder and loose material. I observed the contractor use Simpson set-Xp10 epoxy to epoxy the bolts into place. I notified the contractor of my observations prior to leaving. Deficiencies: Yes Co' No olq:.w a+,d Wr4n � t` i w; K,T-XPIO 183D32W n123/19 r" Description: Description: Description: V"ay sig by iwro Cbmb" n oe: cn•ia� cnn:�w, o-AbW Inspector Signature: �,nMS MlS t�,UC,a,e US Certification #: oau::an.o]al.:n:..%W Page 1 of 2 8129697 Description: Description: Description: Description: Additional Comments: Page 2 of 2