Loading...
HomeMy WebLinkAboutREVIEW REPORT 1 - 16-00479 - 269 S 5th W - Campus Courtyard 2 Bldg 5 - 21 UnitsReview Report Current Building Review Status: APPROVED Application Number: 16-00479Permit Details Application Received Date: 07/08/2016 Multi-Family Residential Application Approved Date: Application Approved Status: APPROVED 07/11/2016 273 S 5th W Campus Courtyard 2 Bldg 5 (21 Units) Status of Plan Reviews Completed 07/11/2016REVISIONSElectrical Review 07/19/2016APPROVEDElectrical Review 08/16/2016REVISIONSBuilding Review 08/17/2016APPROVEDPlumbing Review 08/17/2016APPROVEDHVAC Review 11/14/2016APPROVEDBuilding Review Permit Review Status Plan Reviews Still in Progress DESCRIPTION COMMENTS STA TUS *Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed! Penetrations meet the requirements of IBC Section 713 No details shown. Final approval to be determined at inspection. COMPLETED Ducts and dampers meet the requirements of IBC Section 716 No mechanical plans submitted. Rated ceiling penetrations may require a fire damper in line with ceiling. COMPLETED fireblocking and draftstopping meet the requirements of IBC Section 717. Insufficient details will be approved based on inspection. Draftstopping in attic shall divide attic into areas no larger than two units. COMPLETED An Energy Review is provided Submit hard copy or electronic copy.COMPLETED Special Inspections are required as per IBC Chapter 17 Special inspections as required for masonry and structural steel. COMPLETED Reviewed By: Quinton Owens Review Date: 11/14/2016 Plan Review Details quintono@rexburg.org Building Review Status: APPROVED