Permit Policies Acknowledgement
The City of Rexburg Building Safety Department is determined to provide excellent customer service. In an effort to help you
understand the City of Rexburg Permit Policies, listed below are several policies which you are required to know prior to
proceeding with your project'
Any construction within the City of Rexburg which requires a permit shall not begin until an approved permit is
obtained. If you do not have a pink building permit signed by the Building Inspector, then you do not have an
(70fficial
it.
uilding without the pink building permit signed by the Building Inspector will result in double fees to be
ssessed and the project to be red tagged. If your project is red tagged, halting all construction, only a City
may remove the red tag. If the red tag is removed by anyone but a City Official, citations will be issued
No building may be occupied without receiving a signed Certificate of Occupancy.
Or
If a building is occupied without receiving a signed Certificate of Occupancy, citations will be issued and the
occupants will be evicted.
I als
Calling in inspections is the responsibility of the applicant and their contractor. Inspections need to be called
into the hotline and not to the inspector. Inspections called in later than 8 AM will be scheduled for the following
business day.
If an inspection is not done, the inspector may require any measures to be taken to allow him to correctly
perform the inspection. (Example: If the electrical rough in inspection is not done and the sheetrock has been
put up, the inspector may require the sheetrock be removed in order to perform the electrical rough in
inspection.)
Any approval for Certificate of Occupancies and Building Permits is only verified through the Permit Technician.
If an inspector says something like "You're good to go", understand that you still need to receive all relevant
documentation from the Permit Technician before you are truly good to go.
4ko Even if you hear from an inspector that you're good to go', ultimately if you do not have a Building Permit or
1Certificate of Occupancy, the above policies will be enforced.
It is your responsibility to relay this information on to anyone who this would be applicable to for your project.
All sub -contractors will be held to this standard with no exceptions.
J11000*The above policies will be enforced to all, regardless if you p this informa ' n on to them or not.
Applicant's Name (print).„ i10 k K t � Sig ature: Date: 6 <
Inspections must be called inbefore BAM on the daytheinspection is requested.I ect7on requests called In after. AM will he scheduled forth. next business day.
Inspection Hotline -(208)372.2344 wwsvrexburg.org T/ Permit Technician -(208)372.2341 Revised March, 2016