Report
Current Public Works Review - Site Plan Status: REVISIONS
Application Number: 17-00118Permit Details
Application Received Date: 03/20/2017
Site Plan
Application Approved Date:
Application Approved Status: APPROVED
03/20/2017
550 W Mikan Dr
Eden Apartments Site Plan
Status of Plan Reviews Completed
03/21/2017Public Works Review - Site Plan REVISIONS
03/22/2017Planning and Zoning Review - Site Plan REVISIONS
03/28/2017Fire Department Review - Site Plan REVISIONS
Permit Review Status
Plan Reviews Still in Progress
Public Works Review - Site Plan
Planning and Zoning Review - Site Plan
Fire Department Review - Site Plan
DESCRIPTION COMMENTS STA TUS
*Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed!
Street REVISIONSNeed details submitted, ie infiltrators, lighting,
etc.
*Revisions Response :
Street REVISIONSTrash enclosures need to be located to allow for
right side pickup.
*Revisions Response :
Water REVISIONSWater line must be extended to University Blvd
on 5th W.
*Revisions Response :
Sewer REVISIONSSW building service can not tie into manhole
unless it is 8".
*Revisions Response :
Sewer REVISIONSWill need profiles for sanitary sewer lines
submitted.
*Revisions Response :
Sewer REVISIONSSSMH2 must be moved west out of asphalt and
stubbed to the north.
*Revisions Response :
Reviewed By: Joel Gray
Review Date: 03/21/2017
Plan Review Details
joel.gray@rexburg.org
Public Works Review - Site Plan Status: REVISIONS
Page 1 of 2
Approval of plans does not constitue approval of variance from code
Public Works Review - Site Plan (Continued)
D ESCRIPTIO N CO MMEN TS STATUS
Storm REVISIONSStorm water from roadway must be on separate
systems.
*Revisions Response :
Storm REVISIONSStorm chamber elevations indicate 1 ft
difference. Is that accounted for is volume
calculations?
*Revisions Response :
Water REVISIONSCurb Stop for culinary split must be gate valve.
*Revisions Response :
Water REVISIONS10 ft separation must be maintained from storm
system.
*Revisions Response :
Lighting REVISIONSAdditional street light at each entrance will be
required.
*Revisions Response :
Water N/AWhat are two lines, in center of project, with
circles near end, fire hydrants?
Suggest more water valves internal than just
the one.
Storm N/AWill 30" CB accept four 12" storm lines?
Storm N/A
Sewer N/A
Street N/A
Plans are approved for a footing/foundation
ONLY permit?
N/A
Street N/APerimeter roads to be separate plans?
Page 2 of 2
Approval of plans does not constitue approval of variance from code