Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
COMCHECK - 17-00289 - Cedars Bldg B - Biomat Buildout
Construction Site: COMcheck Software Version 4.0.2.8 4�( 6 Envelope Compliance Certificate Project Information Energy Code: 90.1 (2010) Standard Project Title: Hemming Cedars - Building B Location: Rexburg, Idaho Climate Zone: 6b Project Type: New Construction Vertical Glazing I Wall Area: 31% Construction Site: Owner/Agent: Cont. DesignerlContractor: 140 West 2nd Richie Webb R -Value Joe Smith Rexburg, ID 83440 Hemming Corp. Perimeter Method Studio 140 West 2nd South 925 South West Temple 49.0 Rexburg, ID 83440 0.021 Salt Lake City, UT 84111 1065 208.356.6142 --- 801,532.4422 0.550 rwebb@hemmingcorp.com 21.0 joe@method-studio.com Building Area 0.064 Floor Area --- 1 -Level One (Retail) : Nonresidential 0.420 25640 300 2 -Level Two (Office) : Nonresidential --- 27650 0.800 3 -Level Three (Multifamily) : Residential 21.0 25120 0.062 4 -Level Four (Multifamily) : Residential 2630 24000 Envelope Assemblies Assembly Roof 1: Attic Roof with Wood Joists, [Bldg. Use 4 - Level Four] Floor 1: Slab -On -Grade: Unhealed, [Bldg. Use 1 - Level One] (c) North Elevation Level One Two: Steel -Framed, 16" o.c., [Bldg. Use 1 - Level One] Window 1: Metal Frame, Perf. Specs.: Product ID Pending ID; SHGC 0.36, [Bldg. Use 1 - Level One] (b) Door 1: Glass (} 50% giazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID Pending ID, SHGC 0.36, [Bldg. Use 1 - Level One] (b) North Elevation Level Three Four: Wood -Framed, 16" o.c., [Bldg. Use 3 - Level Three] Window 2: Vinyl/Fiberglass Frame, Perf. Specs.: Product ID Pending ID, SHGC 0.40, [Bldg. Use 3 - Level Three] (b) Door 2: Glass (} 50%u glazing):Metal Frame, Entrance Door, Perf. Specs.: Product ID Pending ID, SHGC 0.36, [Bldg. Use 3 - Level Three] (b) East Elevation Level One Two: Solid Concrete:8" Thickness, Normal Density, Furring: Metal, [Bldg. Use 2 - Level Two] East Elevation Level Three Four: Steel -Framed, 16" o.c., [Bldg. Use 4 - Level Four] Gross Area Cavity Cont. Proposed Budget U - or R -Value R -Value U -Factor Factoro, Perimeter 24450 49.0 0.0 0.021 0.027 1065 — --- 0.730 0.550 6800 21.0 0.0 0.106 0.064 4060 --- - 0.420 0.550 300 •-- --- 0.420 0.800 7460 21.0 0.0 0.062 0.051 2630 0.320 0.350 200 --- 0.420 0.800 2580 15.0 0.0 0.136 0.080 1220 21.0 0.0 0.106 0.064 Project Title: Hemming Cedars - Building B Report date: 10/03/16 Data filename: C:1Usersljbringard\Documents\COMcheck\Building B.cck Page 1 of 10 Assembly Gross Area Cavity Cont. Proposed Budget U - or R -Value R -Value U -Factor Factorial Perimeter South Elevation Level One Two: Solid Concrete:8" Thickness, Normal 9011 15.0 0.0 0.136 0.080 Density, Furring: Metal, [Bldg. Use 1 - Level One] Window 5: Metal Frame, Perf. Specs.: Product ID Pending ID, SHGC 1620 --- 0.420 0.550 0.36, [Bldg. Use 1 - Level One] (b) Door 5: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. 120 --- --- 0.420 0.800 Specs.: Product ID Pending ID, SHGC 0.36, [Bldg. Use 1 - Level One] (b) South Elevation Level Three Four: Wood -Framed, 16" o.c., [Bldg. Use 3 7495 21.0 0.0 0.062 0.051 - Level Three] Window 6: Vinyl/Fiberglass Frame, Pert. Specs.: Product ID Pending 1565 --- — 0.320 0.350 ID, SHGC 0.40, [Bldg. Use 3 - Level Three] (b) West Elevation Level One Two: Steel -Framed, 16" o.c., [Bldg. Use 1 - 1800 21.0 0.0 0.106 0.064 Level One] Window 7: Metal Frame, Perf. Specs.: Product ID Pending ID, SHGC 790 --- 0.420 0.550 0.36, [Bldg. Use 1 - Level One] (b) Door 6: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. 20 --- --- 0.420 O.B00 Specs.: Product ID Pending 1D, SHGC 0.36, [Bldg. Use 1 - Level One] (b) West Elevation Level Three Four: Wood -Framed, 16" o.c., [Bldg. Use 1 1900 21.0 0.0 0.062 0.051 - Level One] Window 8: VinyllFiberg lass Frame, Perf. Specs.: Product ID Pending 400 --- --- 0.320 0.350 ID, SHGC 0.40, [Bldg. Use 1 - Level One] (b) (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. (b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c) Slab -On -Grade proposed and budget U -factors shown in table are F -factors. Envelope• .d Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 90.1 (2010) Standard requirements in COMcheck Version 4.0.2.8 and to comply with the mandatory requirements listed in the Inspection Checklist. - Title Signature Date Project Title: Hemming Cedars - Building B Report date: 10/03/16 Data filename: C:1Usersljbringard\DocumentslCOMcheck\Building B.cck Page 2 of 10