Loading...
HomeMy WebLinkAboutRESCHECK - 17-00119 - 555 W Mikan Dr - Eden Apartments Bldg 1 - 37 Units & ClubCOMcheck Software Version 4.0.0 Envelope Compliance Certificate Project Information Energy Code: 2012 I ECC Project Title: Eden Apartments Location: Rexburg, Idaho Climate Zone: 6b Project Type: New Construction Vertical Glazing /Wall Area: 15% Construction Site: Owner/Agent: Designer/Contractor: 950 Mikan Drive Proposed Rexburg„ ID 83440 Building Area Floor Area 1 -MAIN FLOOR (Multifamily) : Residential 8859 2 -2ND FLOOR (Multifamily) : Residential 10910 3 -3RD FLOOR (Multifamily) : Residential 10910 4 -Clubhouse (Town hall) : Nonresidential 5190 Additional Efficiency Package High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U - or R -Value R -Value U -Factor Factor(.) Perimeter Roof 1: Attic Roof with Wood Joists, [Bldg. Use 3 - 3RD FLOOR] 10910 49.0 0.0 0.021 0.021 Roof 2: Attic Roof with Wood Joists, [Bldg. Use 4 - Clubhouse] 49 0.0 0.0 0.613 0.021 Exterior Wall 1: Wood -Framed, 16" o.c., [Bldg. Use 3 - 3RD FLOOR] 7974 23.0 0.0 0.059 0.051 Window 1: Vinyl/Fiberglass Frame:Operable, Pert. Specs.: Product ID 1286 --- -- 0.300 0.430 na, SHGC 0.70, [Bldg. Use 3 - 3RD FLOOR] (c) Window 4: Metal Frame with Thermal Break:Fixed, Perf. Specs.: 778 --- --- 0.353 0.360 Product ID fa-kaw-21583, SHGC 0.24, [Bldg. Use 3 - 3RD FLOOR] (c) Door 1: Other Door, Swinging, [Bldg. Use 3 - 3RD FLOOR] 240 --- --- 0.025 0.370 Exterior Wall 2: Wood -Framed, 16" o.c., [Bldg. Use 2 - 2ND FLOOR] 7974 23.0 0.0 0.059 0.051 Window 2: Vinyl/Fiberglass Frame:Operable, Perf. Specs.: Product ID 1286 --- --- 0.300 0.430 na, SHGC 0.70, [Bldg. Use 2 - 2ND FLOOR] (c) Door 2: Other Door, Swinging, [Bldg. Use 2 - 2ND FLOOR] 240 --- --- 0.025 0.370 Exterior Wall 3: Wood -Framed, 16" o.c., [Bldg. Use 1 - MAIN FLOOR] 6327 23.0 0.0 0.059 0.051 Window 3: Vinyl/Fiberglass Frame:Operable, Pert. Specs.: Product ID 553 --- --- 0.300 0.430 na, SHGC 0.70, [Bldg. Use 1 - MAIN FLOOR] (c) Door 3: Other Door, Swinging, [Bldg. Use 1 - MAIN FLOOR] 200 --- --- 0.025 0.370 Exterior Wall 4: Wood -Framed, 16" o.c., [Bldg. Use 4 - Clubhouse] 3190 23.0 0.0 0.059 0.051 Floor 1: Wood -Framed, [Bldg. Use 3 - 3RD FLOOR] 10910 0.0 40.0 0.023 0.033 Floor 2: Wood -Framed, [Bldg. Use 2 - 2ND FLOOR] 10910 0.0 40.0 0.023 0.033 Floor 3: Slab -On -Grade: Unheated, Vertical 2 ft., [Bldg. Use 1 - MAIN 703 --- 10.0 0.550 0.520 FLOOR] (d) Basement Wall 1: Solid Concrete:8" Thickness, Normal Density, 2079 14.0 0.0 0.075 0.108 Project Title: Eden Apartments Report date: 04/17/17 Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 1 of 9 Assembly Gross Area Cavity Cont. Proposed Budget U - or R -Value R -Value U -Factor Factorc.t Perimeter Furring: Wood, Wall H19.0, Depth B.G. 9.0, (Bldg. Use 4 - Clubhouse] Basement Wall 2: Solid Concrete:8" Thickness, Normal Density, 884 14.0 0.0 0.075 0.108 Furring: Wood, Wall Ht 4.0, Depth B.G. 4.0, (Bldg. Use 4 - Clubhouse] (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. (b)'Other' components require supporting documentation for proposed U -factors. (c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation (d) Slab -On -Grade proposed and budget U -factors shown in table are F -factors. Envelone PASSES: Desian 110/ better than Inde Envelope Compliance Statement Compliance Statement., The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.0 and to comply with the mandatory requirements listed in the Inspection Checklist. Signature Date Project Title: Eden Apartments Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Bulliding.cck Report date: 04/17/17 Page 2 of 9 COMcheck Software Version 4.0.0 Inspection Checklist Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. 2022 IECC Plan Review Complies? Comments/Assumptions C103.2 Plans and/or specifications provide all❑Complies [PR111 !information with which compliance ❑Does Not ;can be determined for the building Observable ;envelope and document where❑Not :exceptions to the standard are❑Not Applicable ;claimed. C406 ;Plans, specifications, and/or❑Complies [PR9]1 (calculations provide all information❑Does Not ;with which compliance can be ;determined forthe additional energy :❑Not Observable; efficiency package options. I❑Not Applicable C402.3.1 ;Vertical fenestration area <= 30❑Complies [PR10]1 !percent of the gross above -grade wall❑Does Not ;:area.❑Not Observable: ❑Not Applicable 0402.3.1 iSkylight area <= 3 percent of the ;❑Complies [PR1111 !gross roof area. ;❑Does Not ❑Not Observable; ❑Not Applicable j 0402.3.2. ;Areas with obstructions that block❑Complies 2 :direct beam sunlight on >= 1/2 of the❑Does Not [PR15]1 ;roof over the enclosed area for more ' :❑Not Observable ;than 1,500 daytime hours per year (between 8 am and 4 pm.❑Not Applicable ; Additional Comments/Assumptions: 1 JHlgh Impact (Tier 1)i`, Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Eden Apartments Report date: 04/17/17 Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 3 of 9 Section # Footing / Foundation Plans Verified Field Verified Complies? Coin ments/Assumptions & Req.ID Inspection Value Value C402.2.4 'Below -grade wall insulation R- R- R -❑Complies j5ee the Envelope Assemblies [FOI]' !value. S ❑Does Not ;table for values. =❑Not Observable -';❑Not Applicable C303.2 Below -grade wall insulation❑Complies [F02 ]2 Hnstalled per manufacturer's ':❑Does Not instructions. I❑Not Observable .❑Not Applicable j C402.2.6 I Slab edge insulation R -value. I R- R -❑Complies :See the Envelope Assemblies [FO3]1 E]Unheated E] Unheated ',❑Does Not ;table for values. ❑ Heated ❑ Heated❑Not Observable j❑Not Applicable j C303.2 ;Slab edge insulation installed per❑Complies [FO4]2 {manufacturer's instructions.,❑Does Not ❑Not Observable ❑Not Applicable C402.2.6 Slab edge insulation ft ft❑Complies ;See the Envelope Assemblies [FO512 depth/length. Slab insulation j❑Does Not ;table for values. extending away from building is (covered by pavement or>= 10❑Not Observable clinches of soil. ❑Not Applicable C403.2.7, (Exterior insulation protected '..❑Complies C408.2.8, !against damage, sunlight, ❑Does Not C404.5 [FO611 ;moisture, wind, landscaping and ;equipment maintenance '..❑Not Observable :activities. I ❑Not Applicable j C402.2.8 ; Bottom surface of floor structures'.. ❑Complies see the Envelope Assemblies [FO12]1 (incorporating radiant heating ❑Does Not :table for values. j insulated to >=R-3.5. ❑Not Observable !❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) > x Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Eden Apartments Report date: 04/17/17 Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 4 of 9 Section # Framing / Rough -In Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Re .ID C402.4.1, :The building envelope contains a.. ❑Complies C402.4.2 :continuous air barrier that is ❑Does Not [FR16]1 ;sealed in an approved manner '.. :❑Not Observable I land either constructed or tested in an approved manner. Air -.❑Not Applicable barrier penetrations are sealed in Ian approved manner. C402.4.3, (Factory -built fenestration and:. ,;❑y❑Does Complies C402.4.4 :doors are labeled as meeting air Not [FR18]3 :leakage requirements. , ❑Not Observable ; ❑Not Applicable C402.4.7 ;Vestibules are installed on all '.. :❑Complies [FR17]3 (building entrances. Doors have !❑Does Not :self -dosing devices.❑Not Observable ❑Not Applicable C402.3.3, (Vertical fenestration U -Factor, U- '.. U -❑Complies See the Envelope Assemblies C402.3.4 El Not table for values. [FRS]1❑Not Observable ❑Not Applicable C4023.3 (Vertical fenestration SHGC value. SHGC:_ ; SHGC:_❑Complies ;See the Envelope Assemblies [FR1011❑Does Not I table for values. I❑Not Observable ❑Not Applicable C303.1.3 Fenestration products rated in',❑Complies [FR12]2 ,`accordance with NFRC.,❑Does Not ❑Not Observable ❑Not Applicable C303.13 ;Fenestration products are ❑Complies [FR1311 certified as to performance labels'❑Does Not j or certificates provided. ❑Not Observable ❑Not Applicable C402.2.7 U -factor of opaque doors U- .. U- ❑Complies ;See the Envelope Assemblies [FR14]2 !associated with the building '�❑ Swinging: table for values. ;thermal envelope meets ❑ Nonswinging ;requirements.❑Not ❑ Nonswinging Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1) - - Medium Impact (Tier 2) 1:3". Low Impact (Tier 3) Project Title: Eden Apartments Report date: 04/17/17 Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 5 of 9 2012 IECC Mechanical Rough -in Inspection I Complies? Comments/Assumptions C402.4.5. ;Stair and elevator shaft vents have I❑Complies 1 motorized dampers that automatically❑Does Not [ME3]3 ;close. ❑Not Observable; C402.4.5. :Outdoor air and exhaust systems have;❑Complies 2 :motorized dampers that automatically❑Does Not [ME58]3 :shut when not in use and meet !maximum leakage rates. Check :❑Not Observable !gravity dampers where allowed. ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) ;2t Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Eden Apartments Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Report date: 04/17/17 Page 6 of 9 Section # Insulation Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Req.ID C402.4.1. All sources of air leakage in the ❑Complies 1 building thermal envelope are ❑Does Not [IN111 ;sealed, caulked, gasketed, ;weather stripped or wrapped with ❑Not Observable moisture vapor-permeable :❑Not Applicable ;wrapping material to minimize air', (leakage. C402.4.2. ; Roof R-value. For some ceiling -: R- R-❑Complies — ;See the Envelope Assemblies 1 :systems, verification may need to --, ❑ Above deck ; ❑ Above deck ❑Does Not ;table for values. [I11211 ;occur during Framing Inspection. ❑ Metal ❑ Metal ❑Not Observable ❑ Attic 'Roof ❑ Attic ;❑Not Applicable C303.2 insulation installed per '..❑Complies [IN3]1 manufacturer's instructions. ',.❑Does Not Blown or poured loose-fill insulation is installed only where ❑Not Observable :the roof slope is <=3 in 12. ❑Not Applicable C303.2 ;Above-grade wall insulation❑Complies [IN711 :installed per manufacturer's ❑Does Not ;instructions. ❑Not Observable ❑Not Applicable j Floor insulation R-value. R- R- '..❑Complies ;See the Envelope Assemblies (. ❑Mass j ❑ Mass❑Does Not ;table for values. E] Steel ❑ Steel j❑Not Observable L] Wood E] Wood ;❑Not Applicable C303.2 Floor insulation installed per❑Complies [I11912 !manufacturer's instructions. ❑Does Not ❑Not Observable '.❑Not Applicable ! C303.1 ;Building envelope insulation is ❑Complies [IN10]1 ', labeled with R-value or insulation❑Does Not :certificate providing R-value and '..❑Not Observable ;other relevant data. ❑Not Applicable C303.2.1 Exterior insulation is protected ,❑Complies [IN14]''from damage with a protective - ''�❑Does Not material. Verification for exposed (foundation insulation may need❑Not Observable :to occur during Foundation❑Not Applicable j Inspection. C402.2.1 Insulation intended to meet the ",❑Complies [IN17]3 (roof insulation requirements ElNot ;cannot be installed on top of a ;suspended ceiling. Mark this ❑Not Observable j requirement compliant if ❑Not Applicable ;insulation is installed accordingly. Additional Comments/Assumptions: 1 I High Impact (Tier 1) L2.I Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Eden Apartments Report date: 04/17/17 Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 7 of 9 121ECCJ Final Inspection I Complies? I Comments/Assumptions C402.4.6 Weatherseals installed on all loading❑Complies [FI3711 '�, dock cargo doors. El Does Not ❑Not Observable; ❑Not ADDlicable C402.4.8 ;Recessed luminaires in thermal 1JComplies [FI26]3 !envelope to limit infiltration and be IC❑Does Not ;rated and labeled. Seal between❑Not Observable; ;interior finish and luminaire housing. ❑Not Applicable C406 (Efficient HVAC performance, efficient❑Complies [FI34]1 blighting system, or on-site supply of :❑Does Not (renewable energy consistent with f Observable (what is shown the approved plans. I �MKInt Annlirahla , Additional Comments/Assumptions: 111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3. 1 Low Impact (Tier 3) Project Title: Eden Apartments Report date: 04/17/17 Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 8 of 9 Project Title: Eden Apartments Report date: 04/17/17 Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 9 of 9