HomeMy WebLinkAboutRESCHECK - 17-00119 - 555 W Mikan Dr - Eden Apartments Bldg 1 - 37 Units & ClubCOMcheck Software Version 4.0.0
Envelope Compliance Certificate
Project Information
Energy Code:
2012 I ECC
Project Title:
Eden Apartments
Location:
Rexburg, Idaho
Climate Zone:
6b
Project Type:
New Construction
Vertical Glazing /Wall Area:
15%
Construction Site: Owner/Agent:
Designer/Contractor:
950 Mikan Drive
Proposed
Rexburg„ ID 83440
Building Area
Floor Area
1 -MAIN FLOOR (Multifamily) : Residential
8859
2 -2ND FLOOR (Multifamily) : Residential
10910
3 -3RD FLOOR (Multifamily) : Residential
10910
4 -Clubhouse (Town hall) : Nonresidential
5190
Additional Efficiency Package
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Envelope Assemblies
Assembly
Gross Area
Cavity Cont.
Proposed
Budget U -
or
R -Value R -Value
U -Factor
Factor(.)
Perimeter
Roof 1: Attic Roof with Wood Joists, [Bldg. Use 3 - 3RD FLOOR]
10910
49.0 0.0
0.021
0.021
Roof 2: Attic Roof with Wood Joists, [Bldg. Use 4 - Clubhouse]
49
0.0 0.0
0.613
0.021
Exterior Wall 1: Wood -Framed, 16" o.c., [Bldg. Use 3 - 3RD FLOOR]
7974
23.0 0.0
0.059
0.051
Window 1: Vinyl/Fiberglass Frame:Operable, Pert. Specs.: Product ID
1286
--- --
0.300
0.430
na, SHGC 0.70, [Bldg. Use 3 - 3RD FLOOR] (c)
Window 4: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
778
--- ---
0.353
0.360
Product ID fa-kaw-21583, SHGC 0.24, [Bldg. Use 3 - 3RD FLOOR] (c)
Door 1: Other Door, Swinging, [Bldg. Use 3 - 3RD FLOOR]
240
--- ---
0.025
0.370
Exterior Wall 2: Wood -Framed, 16" o.c., [Bldg. Use 2 - 2ND FLOOR]
7974
23.0 0.0
0.059
0.051
Window 2: Vinyl/Fiberglass Frame:Operable, Perf. Specs.: Product ID
1286
--- ---
0.300
0.430
na, SHGC 0.70, [Bldg. Use 2 - 2ND FLOOR] (c)
Door 2: Other Door, Swinging, [Bldg. Use 2 - 2ND FLOOR]
240
--- ---
0.025
0.370
Exterior Wall 3: Wood -Framed, 16" o.c., [Bldg. Use 1 - MAIN FLOOR]
6327
23.0 0.0
0.059
0.051
Window 3: Vinyl/Fiberglass Frame:Operable, Pert. Specs.: Product ID
553
--- ---
0.300
0.430
na, SHGC 0.70, [Bldg. Use 1 - MAIN FLOOR] (c)
Door 3: Other Door, Swinging, [Bldg. Use 1 - MAIN FLOOR]
200
--- ---
0.025
0.370
Exterior Wall 4: Wood -Framed, 16" o.c., [Bldg. Use 4 - Clubhouse]
3190
23.0 0.0
0.059
0.051
Floor 1: Wood -Framed, [Bldg. Use 3 - 3RD FLOOR]
10910
0.0 40.0
0.023
0.033
Floor 2: Wood -Framed, [Bldg. Use 2 - 2ND FLOOR]
10910
0.0 40.0
0.023
0.033
Floor 3: Slab -On -Grade: Unheated, Vertical 2 ft., [Bldg. Use 1 - MAIN
703
--- 10.0
0.550
0.520
FLOOR] (d)
Basement Wall 1: Solid Concrete:8" Thickness, Normal Density,
2079
14.0 0.0
0.075
0.108
Project Title: Eden Apartments Report date: 04/17/17
Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 1 of 9
Assembly
Gross Area Cavity Cont. Proposed Budget U -
or R -Value R -Value U -Factor Factorc.t
Perimeter
Furring: Wood, Wall H19.0, Depth B.G. 9.0, (Bldg. Use 4 - Clubhouse]
Basement Wall 2: Solid Concrete:8" Thickness, Normal Density, 884 14.0 0.0 0.075 0.108
Furring: Wood, Wall Ht 4.0, Depth B.G. 4.0, (Bldg. Use 4 - Clubhouse]
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements.
(b)'Other' components require supporting documentation for proposed U -factors.
(c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation
(d) Slab -On -Grade proposed and budget U -factors shown in table are F -factors.
Envelone PASSES: Desian 110/ better than Inde
Envelope Compliance Statement
Compliance Statement., The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.0.0 and to comply with the mandatory requirements listed
in the Inspection Checklist.
Signature Date
Project Title: Eden Apartments
Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Bulliding.cck
Report date: 04/17/17
Page 2 of 9
COMcheck Software Version 4.0.0
Inspection Checklist
Energy Code: 2012 IECC
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
2022 IECC Plan Review
Complies? Comments/Assumptions
C103.2
Plans and/or specifications provide all❑Complies
[PR111
!information with which compliance
❑Does Not
;can be determined for the building
Observable
;envelope and document where❑Not
:exceptions to the standard are❑Not
Applicable
;claimed.
C406
;Plans, specifications, and/or❑Complies
[PR9]1
(calculations provide all information❑Does
Not
;with which compliance can be
;determined forthe additional energy
:❑Not Observable;
efficiency package options.
I❑Not Applicable
C402.3.1
;Vertical fenestration area <= 30❑Complies
[PR10]1
!percent of the gross above -grade wall❑Does
Not
;:area.❑Not
Observable:
❑Not Applicable
0402.3.1
iSkylight area <= 3 percent of the
;❑Complies
[PR1111
!gross roof area.
;❑Does Not
❑Not Observable;
❑Not Applicable j
0402.3.2.
;Areas with obstructions that block❑Complies
2
:direct beam sunlight on >= 1/2 of the❑Does
Not
[PR15]1
;roof over the enclosed area for more
' :❑Not Observable
;than 1,500 daytime hours per year
(between 8 am and 4 pm.❑Not
Applicable ;
Additional Comments/Assumptions:
1 JHlgh Impact (Tier 1)i`, Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Eden Apartments Report date: 04/17/17
Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 3 of 9
Section
#
Footing / Foundation
Plans Verified
Field Verified
Complies?
Coin ments/Assumptions
& Req.ID
Inspection
Value
Value
C402.2.4
'Below -grade wall insulation R-
R-
R -❑Complies j5ee the Envelope Assemblies
[FOI]'
!value.
S
❑Does Not ;table for values.
=❑Not
Observable
-';❑Not
Applicable
C303.2
Below -grade wall insulation❑Complies
[F02 ]2
Hnstalled per manufacturer's
':❑Does Not
instructions.
I❑Not
Observable
.❑Not Applicable j
C402.2.6
I Slab edge insulation R -value. I
R-
R -❑Complies :See the Envelope Assemblies
[FO3]1
E]Unheated
E] Unheated ',❑Does Not ;table for values.
❑ Heated
❑ Heated❑Not Observable
j❑Not Applicable j
C303.2
;Slab edge insulation installed per❑Complies
[FO4]2
{manufacturer's instructions.,❑Does
Not
❑Not Observable
❑Not Applicable
C402.2.6
Slab edge insulation
ft
ft❑Complies ;See the Envelope Assemblies
[FO512
depth/length. Slab insulation
j❑Does Not ;table for values.
extending away from building is
(covered by pavement or>= 10❑Not
Observable
clinches of soil.
❑Not Applicable
C403.2.7,
(Exterior insulation protected '..❑Complies
C408.2.8,
!against damage, sunlight,
❑Does Not
C404.5
[FO611
;moisture, wind, landscaping and
;equipment maintenance '..❑Not
Observable
:activities.
I
❑Not Applicable j
C402.2.8
; Bottom surface of floor structures'..
❑Complies see the Envelope Assemblies
[FO12]1
(incorporating radiant heating
❑Does Not :table for values.
j insulated to >=R-3.5.
❑Not Observable
!❑Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) > x Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Eden Apartments Report date: 04/17/17
Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 4 of 9
Section
#
Framing / Rough -In Inspection
Plans Verified
Value
Field Verified
Value
Complies? Comments/Assumptions
& Re .ID
C402.4.1,
:The building envelope contains a..
❑Complies
C402.4.2
:continuous air barrier that is
❑Does Not
[FR16]1
;sealed in an approved manner '..
:❑Not Observable I
land either constructed or tested
in an approved manner. Air
-.❑Not Applicable
barrier penetrations are sealed in
Ian approved manner.
C402.4.3,
(Factory -built fenestration and:.
,;❑y❑Does
Complies
C402.4.4
:doors are labeled as meeting air
Not
[FR18]3
:leakage requirements. ,
❑Not Observable ;
❑Not Applicable
C402.4.7
;Vestibules are installed on all '..
:❑Complies
[FR17]3
(building entrances. Doors have
!❑Does Not
:self -dosing devices.❑Not
Observable
❑Not Applicable
C402.3.3,
(Vertical fenestration U -Factor, U-
'.. U -❑Complies
See the Envelope Assemblies
C402.3.4
El Not table for values.
[FRS]1❑Not
Observable
❑Not Applicable
C4023.3
(Vertical fenestration SHGC value. SHGC:_
; SHGC:_❑Complies
;See the Envelope Assemblies
[FR1011❑Does
Not I table for values.
I❑Not Observable
❑Not Applicable
C303.1.3
Fenestration products rated in',❑Complies
[FR12]2
,`accordance with NFRC.,❑Does
Not
❑Not Observable
❑Not Applicable
C303.13
;Fenestration products are
❑Complies
[FR1311
certified as to performance labels'❑Does
Not
j or certificates provided.
❑Not Observable
❑Not Applicable
C402.2.7
U -factor of opaque doors U-
.. U-
❑Complies ;See the Envelope Assemblies
[FR14]2
!associated with the building '�❑ Swinging:
table for values.
;thermal envelope meets ❑ Nonswinging
;requirements.❑Not
❑ Nonswinging
Observable
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact (Tier 1) - - Medium Impact (Tier 2) 1:3". Low Impact (Tier 3)
Project Title: Eden Apartments Report date: 04/17/17
Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 5 of 9
2012 IECC Mechanical Rough -in Inspection I Complies? Comments/Assumptions
C402.4.5. ;Stair and elevator shaft vents have I❑Complies
1 motorized dampers that automatically❑Does Not
[ME3]3 ;close.
❑Not Observable;
C402.4.5. :Outdoor air and exhaust systems have;❑Complies
2 :motorized dampers that automatically❑Does Not
[ME58]3 :shut when not in use and meet
!maximum leakage rates. Check :❑Not Observable
!gravity dampers where allowed. ❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) ;2t Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Eden Apartments
Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck
Report date: 04/17/17
Page 6 of 9
Section
#
Insulation Inspection
Plans Verified
Value
Field Verified
Value
Complies? Comments/Assumptions
& Req.ID
C402.4.1.
All sources of air leakage in the
❑Complies
1
building thermal envelope are
❑Does Not
[IN111
;sealed, caulked, gasketed,
;weather stripped or wrapped with
❑Not Observable
moisture vapor-permeable
:❑Not Applicable
;wrapping material to minimize air',
(leakage.
C402.4.2.
; Roof R-value. For some ceiling -: R-
R-❑Complies
—
;See the Envelope Assemblies
1
:systems, verification may need to --, ❑ Above deck
; ❑ Above deck
❑Does Not ;table for values.
[I11211
;occur during Framing Inspection. ❑ Metal
❑ Metal
❑Not Observable
❑ Attic
'Roof
❑ Attic
;❑Not Applicable
C303.2
insulation installed per '..❑Complies
[IN3]1
manufacturer's instructions. ',.❑Does
Not
Blown or poured loose-fill
insulation is installed only where
❑Not Observable
:the roof slope is <=3 in 12.
❑Not Applicable
C303.2
;Above-grade wall insulation❑Complies
[IN711
:installed per manufacturer's
❑Does Not
;instructions.
❑Not Observable
❑Not Applicable j
Floor insulation R-value. R-
R-
'..❑Complies ;See the Envelope Assemblies
(.
❑Mass
j ❑ Mass❑Does
Not ;table for values.
E] Steel
❑ Steel
j❑Not Observable
L] Wood
E] Wood
;❑Not Applicable
C303.2
Floor insulation installed per❑Complies
[I11912
!manufacturer's instructions.
❑Does Not
❑Not Observable
'.❑Not
Applicable !
C303.1
;Building envelope insulation is
❑Complies
[IN10]1
', labeled with R-value or insulation❑Does
Not
:certificate providing R-value and
'..❑Not Observable
;other relevant data.
❑Not Applicable
C303.2.1
Exterior insulation is protected
,❑Complies
[IN14]''from
damage with a protective -
''�❑Does
Not
material. Verification for exposed
(foundation insulation may need❑Not
Observable
:to occur during Foundation❑Not
Applicable j
Inspection.
C402.2.1
Insulation intended to meet the
",❑Complies
[IN17]3
(roof insulation requirements
ElNot
;cannot be installed on top of a
;suspended ceiling. Mark this
❑Not Observable
j requirement compliant if
❑Not Applicable
;insulation is installed accordingly.
Additional Comments/Assumptions:
1 I High Impact (Tier 1) L2.I Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Eden Apartments Report date: 04/17/17
Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 7 of 9
121ECCJ Final Inspection I Complies? I Comments/Assumptions
C402.4.6 Weatherseals installed on all loading❑Complies
[FI3711 '�, dock cargo doors. El Does Not
❑Not Observable;
❑Not ADDlicable
C402.4.8
;Recessed luminaires in thermal
1JComplies
[FI26]3
!envelope to limit infiltration and be IC❑Does
Not
;rated and labeled. Seal between❑Not
Observable;
;interior finish and luminaire housing.
❑Not Applicable
C406
(Efficient HVAC performance, efficient❑Complies
[FI34]1
blighting system, or on-site supply of
:❑Does Not
(renewable energy consistent with
f
Observable
(what is shown the approved plans.
I
�MKInt Annlirahla ,
Additional Comments/Assumptions:
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3. 1 Low Impact (Tier 3)
Project Title: Eden Apartments Report date: 04/17/17
Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 8 of 9
Project Title: Eden Apartments Report date: 04/17/17
Data filename: C:\Users\Guy\Documents\COMcheck\Eden Clubhouse Builiding.cck Page 9 of 9