HomeMy WebLinkAboutRESCHECK - 16-00221 - 1121 S 5th W - SFRI
CREScheck Software Version 4.6.2
�(J Compliance Certificate
Project Erikson Home
Energy Code:
2012 IECC
31
Wall 1: Wood Frame, 16" D.C. 1,548 21.0 1.0
Location:
Rexburg, Idaho
Window 2: Vinyl/Fiberglass Frame:Double Pane with Low -E 186
0.280
Construction Type:
Single-family
0.054
73
Project Type:
New Construction
30
Conditioned Floor Area:
4,082 ft2
-
Window 3: Vinyl/Fiberglass Frame:Double Pane with Low -E 50
Glazing Area
9%
Floor 1: All -Wood Joist/Truss:Over Unconditioned Space 1,692 30.0 5.0
0.028
Climate Zone:
6 (8693 HDD)
calculations submitted with the permit application. The proposed building has been designed to meet the 2012 IECC requirements in
Permit Date:
Permit Number:
Construction Site:
Owner/Agent:
Designer/Contractor:
1121 South 5th West
Tom & Charlotte Erikson
Brad Wells
Rexburg, ID 83440
1121 South 5th West
The HighPointe Companies
Rexburg, ID 83440
217 West 2nd South
Rigby, ID 83442
brad@thpcompanies.com
Compliance: Passes using UIA trade-off
Compliance: 8.2% Better Than Code Maximum UA: 380 Your UA: 349
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home.
Envelope Assemblies
Ceiling 1: Flat Ceiling or Scissor Truss 2,390 50.0 40.0
0.013
31
Wall 1: Wood Frame, 16" D.C. 1,548 21.0 1.0
0.054
74
Window 2: Vinyl/Fiberglass Frame:Double Pane with Low -E 186
0.280
52
Wall 2: Wood Frame, 16" D.C. 1,456 21.0 1.0
0.054
73
Window 1: Vinyl/Fiberglass Frame:Double Pane with Low -E 99
0.300
30
Wall 3: Wood Frame, 24" D.C. 560 21.0 1.0
0.052
27
Window 3: Vinyl/Fiberglass Frame:Double Pane with Low -E 50
0.300
15
Floor 1: All -Wood Joist/Truss:Over Unconditioned Space 1,692 30.0 5.0
0.028
47
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2012 IECC requirements in
REScheck Version 4.6.2 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Project Title: Erikson Home Report date: 03/14/16
Data filename: Untitled.rck Page 1 of 8
CREScheck Software Version 4.6.2
�J( Inspection Checklist
Energy Code: 2012 (ECC
Requirements: 100.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
Is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
Pre-Inspection/Plan Review
Plans Verified Field Verified,# Complies? Comments/Assumptions`
& Re .ID
value :. Value
103.1,
;Construction drawings andComplies
'Requirement will be met
103.2
(documentation demonstrate
`i a❑Does Not
[PRI]1
j energy code compliance for the
{
` Observable
building envelope.
,r ❑Not
❑Not Applicable
103.1,
;Construction drawings and67Complies
':Requirement will be met.
103 .2,
documentation demonstrate
- 4 ❑Does Not
403.7
code compliance for
a
,
[PR3]'
,energy
lighting and mechanical systems
, ` * ' - ` EINot Observable
f
(Systems serving multiple
f "' r '� ; r n❑Not Applicable
(dwelling units must demonstrate
i -'
;compliance with the IECC
(Commercial Provisions.
� ut, �, : � , ;• , �`:'"'V
302.1,
1 Heating and cooling equipment is
Heating: I Heating: Complies ;Requirement will be met.
403.6
:sized per ACCA Manual S based
Btu/hr_ 1 Btu/hr _❑Does Not
[PR2]2
jon loads calculated per ACCA
Cooling: 1 Cooling: I❑Not Observable;
L&7 -i
Manual ] or other methods
Btu/hr Btu/hr_
;; ❑Not Applicable
approved by the code official.
i
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12`1 Medium Impact (Tier 2) ;3' Low Impact (Tier 3)
Project Title: Erikson Home Report date: 03/14/16
Data filename: Untitled.rck Page 2 of 8
Foundation Inspection
A protective covering is installed to
protect exposed exterior insulation
and extends a minimum of 6 in. below
grade.
Snow- and ice -melting system controls
installed.
Additional Comments/Assumptions:
Co
mplies? corm
1plies ;Exception: null.
s Not
Observable
Applicable
iplies ;Exception: null.
s Not
Observable'
4ssumptions
1 lHigh Impact (Tier 1) 1 2 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3)
Project Title: Erikson Home Report date: 03/14/16
Data filename: Untitled.rck Page 3 of 8
Section
#
Framing /Rough -In Inspection
Plans Verified
Value
Field Verified ,
Complies? Comments/Assumptions.
L"Complies
&PRe .ID
''.{❑Does Not
.Value
402.1.1,
;Glazing U-factor(area-weighted
U- I
U- See the Envelope Assemblies
402.3.1,
average).
Applicable j
;❑Does Not table for values.
402.3.3,
Protection of insulation on HVAC
402.4.4
j❑Not Observable
402.56
[FR16]2
':sealed at housing/interiorfmish ;' t
'❑Not Applicable
[FR2]1
-; and labeled to indicate r2.0 cfm
Observable
v
.:;leakage at 75 Pa.h,'❑Not
��❑Not Applicable
�l
{
(r,,; ` ' .,'❑Not Applicable
403.2.1
303.1.3
U -factors of fenestration productsl{❑Complies
[FR12]1
;Requirement will be met.
[FR4]1
are determined in accordance I
:'
,:3❑Does Not
10)
;with the NFRC test procedure or❑Not
Observable
Observable
insulated to >_R-6.❑Not
;taken from the default table
, y ,` < ;
❑Not Applicable
IAII joints and seams of air ducts i �'
,-a„� Complies 4Requirement will be met.
[FR13]1
lair handlers, and filter boxes are
4.1.1
;Air barrier and thermal barrier
u
;sealed. td
,;]Complies ;Requirement will be met.
r[FR3]1
Installed per manufacturers
a❑Not Applicable
".�:i❑Does Not
- ,~r,�-t? �,
Building cavities are not used as";' w Complies ,Requirement will be met.
,instructions.
,
{❑Not Observable
402.4.3
1 Fenestration that is not site built
=?,❑Complies ;Requirement will be met.
[FR20]1
Is listed and labeled as meeting E
''.{❑Does Not
AAMA /WDMA/CSA 101/L5.2/A440 [
I
"E]Not Observable
below 55 2F are insulated to >_R -
for has Infiltration rates per NFRC ,
E71\lot
;400 that do not exceed code - ,
`
Applicable j
❑Not Applicable
ilimits. '
Protection of insulation on HVAC
402.4.4
: IC -rated recessed lighting fixturesi �-
_?<; :❑Complies ;Requirement will be met.
[FR16]2
':sealed at housing/interiorfmish ;' t
-�--'1❑Does Not
-; and labeled to indicate r2.0 cfm
Observable
v
.:;leakage at 75 Pa.h,'❑Not
��❑Not Applicable
`
{
(r,,; ` ' .,'❑Not Applicable
403.2.1
Supply ducts in attics are R-_ j R-
Complies !Requirement will be met.
[FR12]1
:insulated to >_R-8. All other ducts ; R- R-
;❑Does Not
in unconditioned spaces or❑Not
lA,-}❑Not
;outside the building envelope are
Observable
insulated to >_R-6.❑Not
Applicable
403.2.2
IAII joints and seams of air ducts i �'
,-a„� Complies 4Requirement will be met.
[FR13]1
lair handlers, and filter boxes are
t :]Does Not
J
u
;sealed. td
-]Not Observable
?intakes and exhausts.
4 Y
)w-,�
a❑Not Applicable
403.2.3"
- ,~r,�-t? �,
Building cavities are not used as";' w Complies ,Requirement will be met.
[FR15]3,
;ducts or plenums. �+ t' ❑Does Not
+
C�,xi= x1.,,
z
"` ',._-;❑Not Observable
403,3
>: i HVAC piping conveying fluids
R-_ R-_
',UComplies Requirement will be met.
[FR1712
- above 105 OF or chilled fluids
❑Does Not
below 55 2F are insulated to >_R -
;❑Not Observable
j3.
❑Not Applicable
403.3.1
Protection of insulation on HVAC
r ;; w f'.
`` , Complies Requirement will be met.
[FR24]1
jpiping.
'^�,'�' '"«„ „''�❑Does
Not
v
' E]Not Observable
`
{
(r,,; ` ' .,'❑Not Applicable
403.4.2
; Hot water pipes are insulated to
R-_ R-_
bdComplies Requirement will be met.
[FR18]?
'+>R-3.0Does
Not
lA,-}❑Not
Observable
❑Not Applicable
403.5
:Automatic or gravity dampers are r' �.`'raj
Complies ;Requirement will be met.
[FR19]z
iinstalled on all outdoor air
'i�t❑Does Not
..,.a
?intakes and exhausts.
.. .., ,..,^,-.. _. ..
ble
Additional Comments/Assumptions:
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 13',: Low Impact (Tier 3)
Project Title: Erikson Home Report date: 03/14/16
Data filename: Untitled.rck Page 4 of 8
111 High Impact (Tier 1) 12 Medium Impact (Tier 2) 1, 3':1 Low Impact (Tier 3)
Project Title: Erikson Home Report date: 03/14/16
Data filename: Untitled.rck Page 5 of 8
Section
#
Insulation Inspection
Plans Verified
l.. value :.
Field Verified "
Value Complies? Comments/Assumptions
RegAD
303.1
!All installed insulation is labeled
Complies Requirement will be meta
[IN13]2
or the installed R-values
+ = "
'_?❑Does Not
;provided.
i ``` '
]„❑Not
!£Y£i
Observable
4 b
❑Not Applicable
402.1.1,
Floor insulation R-value.
R-
R- Complies !See the Envelope Assemblies
402.2.6
Wood
Wood ❑Does Not ;table for values.
[IN1]1
❑ Steel
j ❑ Steel ❑Not Observable
I❑Not Applicable
303.2,
:Floor insulation installed per
!
'; ;❑Complies ;Requirement will be met.
402.2.7
!manufacturer's instructions and
f
'❑Does Not
[IN2]1
in substantial contact with the
!underside of the subfloor.
,,❑Not Observable
=';❑Not Applicable
402.1.1,
Wall insulation R-value. If this is
a ; R-
R- ;❑CompliesjSee the Envelope Assemblies
402.2.5,
mass wall with at least % of the
[]W cod
j ❑ Wood El Does Not '.,table for values.
402.2.6
;wall insulation on the wall
E] Mass
E] Mass;❑Not Observable,'
[IN3]1
(exterior, the exterior insulation
!requirement applies (FR10).
❑ Steel
❑ Steel j❑Not Applicable
3032
;Wall insulation is installed perComplies
!Requirement will be met.
[IN4]1
.manufacturer's instructions
Not
( + £
.'-EIDoes
�❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) -2. Medium Impact (Tier 2) ,3::1 Low Impact (Tier 3)
Project Title: Erikson Home Report date: 03/14/16
Data filename: Untitled.rck Page 6 of 8
Section
-. # Final Inspection Provisions
Plans Verified
Value
Field Verified
'.Value
Complies? : Comments/Assumptions-
=,.
& Req.ID
[F1211
Blown insulation marked every
] HVAC equipment meet efficacy WITM,';
402.1.1, iCeiling insulation R -value.
R-
! R-
;❑complies ISee the Envelope Assemblies
402.2.1,4[]
Wood
Wood❑Does
Not ; table for values.
402.2.2,
402.2.6Not
❑ Steel
E] Steel
❑ Observable
[Fill'❑Not
extends over insulation.
❑Does Not
Applicable
JQ
303.1.1.1, ;Ceiling insulation installed per
11
303.2
'manufacturer's instructions
1 "
[F1211
Blown insulation marked every
] HVAC equipment meet efficacy WITM,';
❑Not Observable
300 ftl.
i
,�,'ONot Applicable
402.2.3
_; Vented attics with air permeable
404.1
F122]2--
; insulation include baffle adjacent
-
;fixtures or 75% of permanent_;❑Does
Ito soffit and eave vents that
ACH 50 =_❑Complies
;Requirement will be met.
extends over insulation.
❑Does Not
402.2.4
;Attic access hatch and door
R-_
[FI3]1
insulation >_R -value of the
Requirement will be met.
ftl❑Does
;adjacent assembly.
❑Not Observable I
❑Not Applicable
402.4.1.2
Blower door test @ 50 Pa. <=5
ACH 50 =_
[FI1711
Mach in Climate Zones 1-2, and
u
<=3 ach in Climate Zones 3-8.'
403.2.2
Duct tightness test result of <=4
cfm/100
[FI411
cfm/100 ft2 across the system or
ft2
<=3 cfm/100 ft2 without air
!handier @ 25 Pa. For rough -in
!tests, verification may need to
;occur during Framing Inspection.
403.2.2.1
;Air handler leakage designated
[FI24]1
l by manufacturer at <=2% of
design air flow.
nable thermostats
on forced air furnaces.
Heat pump thermostat Installed
on heat pumps.
Circulating service hot water
systems have automatic or
accessible manual controls.
Requirement will be met.
' '� n1._JDoes Not
1❑Not Observable
'1All mechanical ventilation system
`?❑Not Applicable
[FI35]1fans
❑Complies ;Requirement will be met.
Not
;❑Does Not
] HVAC equipment meet efficacy WITM,';
❑Not Observable
land air flow limits. �,❑Not Observable h
❑Not Applicable
,�,'ONot Applicable
R -_❑Complies
;Requirement will be met.
404.1
❑Does Not
❑Complies ;Requirement will be met.
❑Not Observable
;fixtures or 75% of permanent_;❑Does
❑Not Applicable
ACH 50 =_❑Complies
;Requirement will be met.
❑Does Not
{Does not apply to low -voltage
I❑Not Observable
❑Not Applicable
_ cfm/100❑Complies
Requirement will be met.
ftl❑Does
Not
❑Not Observable I
❑Not Applicable
Requirement will be met.
Does Not
Not Observable
Requirement will be met.
s Not
Observable
Applicable
1plies ;Exception: null.
s Not
Observable
s Not
Observable
null.
403.5.1
'1All mechanical ventilation system
,`�...„,'❑Complies ;Requirement will be met.
[FI35]1fans
not part of tested and listed'I❑Does
Not
] HVAC equipment meet efficacy WITM,';
land air flow limits. �,❑Not Observable h
❑Not Applicable
404.1
;75% of lamps in permanent
❑Complies ;Requirement will be met.
[FI611
;fixtures or 75% of permanent_;❑Does
Not
;fixtures have high efficacy lamps.
{Does not apply to low -voltage
:;=,❑Not Observable
- .. .. ,
11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 13'1 Low impact (Tier 3)
Project Title: Erikson Home Report date: 03/14/16
Data filename: Untitled.rck Page 7 of 8
Section
#
-
Final inspection Provisions
Plans Verified
Field Verified
l Complies? Comments/Assumptions
&Re .ID
Value ;.
Value
404.1.1
:Fuel gas lighting systems have
; l -:
'❑Complies !Exception: null.
[F[23]3
no continuous pilot light.
�`' . ❑Does Not
Observable
77❑❑�Not
NotApplicable
401.3
;Compliance certificate posted
i ;
'❑Complies I1Requirement will be met.
,[F17].
is❑Does Not
r ,t.
�..;
s ,❑Not Observable
Y;±❑Not Applicable
3033
' Manufacturer manuals for
I ` ''`
I
?❑Complies 1 Requirement will be met.
[FI18]
mechanical and water heating
'❑Does Not
b
;systems have een provided
I
❑Not Observable
"Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Erikson Home Report date: 03/14/16
Data filename: Untitled.rck Page 8 of 8