HomeMy WebLinkAboutREVIEW BUILDING - 16-00266 - 1360 S 12 W - Motel 6Motel 6
Building ReviewReview Date: 06/20/2016
Permit Number: 16-00266
Reviewed By: Quinton Owens Current Building Review Status: APPW/COND
D ESCRIPTIO N CO MMEN TS STATUS
Use classification is shown on plans as per
IBC Section 302
Not identified. Default R-1 (Hotel)COMPLETED
I-1, R-1, R-2, & R-3 units have separation as
per IBC Section 422
Floor/ceiling assembly will have 2 layers
5/8" type x on floor joists unless an
alternate assembly is approved.
Top level ceiling as noted on plans requires
'C' core drywall per listed assembly, UL
P522.
COMPLETED
Incidental use meets the requirements of
Table 508.2.5
Walls at incidental use areas (Table 509)
shall resist passage of smoke and have
self-closing doors.
COMPLETED
What is the type of construction & sq
footage? Please Specify in comments
Not identified, default V-B YES
Fire barriers meet the requirements of IBC
Section 707
Fire riser room and shafts are to be
constructed as fire barriers
COMPLETED
Shaft enclosures meet the requirements of
IBC Section 708
Not identified. Water heater vent shaft and
laundry chute shall be continuous one hour
rated walls
COMPLETED
Penetrations meet the requirements of IBC
Section 713
No details. Approval based on inspection.COMPLETED
Rated doors and windows meet the
requirements ofIBC Section 715
Doors in rated corridor must have 20 min
fire rating or higher.
COMPLETED
Ducts and dampers meet the requirements
of IBC Section 716
Dampers may be required when ducts
penetrate a rated wall or ceiling.
COMPLETED
fireblocking and draftstopping meet the
requirements of IBC Section 717.
No details. Fireblocking will be approved
based on inspection.
Draftstopping shall divide attic equally into
areas no more than 3,000 sf each.
Draftstops are to be in line with unit
separation walls below.
COMPLETED
Automatic sprinklers are provided or
exempted as per IBC Section 903.2
Minimum NFPA 13R sprinkler system
required. Submit plans for approval prior to
installation.
COMPLETED
Occupant load is identified on plans as per
IBC Section 1004
R-1 Occupancy requires the occupant load
per floor to be identified with construction
documents. Please email occupant loads.
REVISIONS
Handrails and Guards meet the
requirements of IBC Sections 1011 and
1012
Handrails are missing details. Handrails
and guards are required to comply with
2012 IBC requirements.
COMPLETED
Dwelling Units meet the requirements of IBC
Section 1107
Type B units (all units other than accessible
units on main floor only) require 18" clear
space next to latch side of entry door inside
units.
FOUR accessible units are required (1 min.
COMPLETED
Page 1 of 2
Building Review (Continued)
D ESCRIPTIO N CO MMEN TS STATUS
roll-in shower).
Service Facilities meet the requirements of
IBC Section 1109.11
Service counter must meet accessibility
requirements.
COMPLETED
Ventilation is provided as per IBC Section
1203
Rooms without openings for natural
ventilation will require mechanical
ventilation.
COMPLETED
Site Grading meets the requirements of IBC
Section 1804.3
Water retention area on south side
approved 9' from building as per drawings.
Four handicap parking stalls shown on
revisions.
COMPLETED
Page 2 of 2
Building Review (Continued)
D ESCRIPTIO N CO MMEN TSSTATUS