Loading...
HomeMy WebLinkAboutREVIEW BUILDING - 16-00266 - 1360 S 12 W - Motel 6Motel 6 Building ReviewReview Date: 06/20/2016 Permit Number: 16-00266 Reviewed By: Quinton Owens Current Building Review Status: APPW/COND D ESCRIPTIO N CO MMEN TS STATUS Use classification is shown on plans as per IBC Section 302 Not identified. Default R-1 (Hotel)COMPLETED I-1, R-1, R-2, & R-3 units have separation as per IBC Section 422 Floor/ceiling assembly will have 2 layers 5/8" type x on floor joists unless an alternate assembly is approved. Top level ceiling as noted on plans requires 'C' core drywall per listed assembly, UL P522. COMPLETED Incidental use meets the requirements of Table 508.2.5 Walls at incidental use areas (Table 509) shall resist passage of smoke and have self-closing doors. COMPLETED What is the type of construction & sq footage? Please Specify in comments Not identified, default V-B YES Fire barriers meet the requirements of IBC Section 707 Fire riser room and shafts are to be constructed as fire barriers COMPLETED Shaft enclosures meet the requirements of IBC Section 708 Not identified. Water heater vent shaft and laundry chute shall be continuous one hour rated walls COMPLETED Penetrations meet the requirements of IBC Section 713 No details. Approval based on inspection.COMPLETED Rated doors and windows meet the requirements ofIBC Section 715 Doors in rated corridor must have 20 min fire rating or higher. COMPLETED Ducts and dampers meet the requirements of IBC Section 716 Dampers may be required when ducts penetrate a rated wall or ceiling. COMPLETED fireblocking and draftstopping meet the requirements of IBC Section 717. No details. Fireblocking will be approved based on inspection. Draftstopping shall divide attic equally into areas no more than 3,000 sf each. Draftstops are to be in line with unit separation walls below. COMPLETED Automatic sprinklers are provided or exempted as per IBC Section 903.2 Minimum NFPA 13R sprinkler system required. Submit plans for approval prior to installation. COMPLETED Occupant load is identified on plans as per IBC Section 1004 R-1 Occupancy requires the occupant load per floor to be identified with construction documents. Please email occupant loads. REVISIONS Handrails and Guards meet the requirements of IBC Sections 1011 and 1012 Handrails are missing details. Handrails and guards are required to comply with 2012 IBC requirements. COMPLETED Dwelling Units meet the requirements of IBC Section 1107 Type B units (all units other than accessible units on main floor only) require 18" clear space next to latch side of entry door inside units. FOUR accessible units are required (1 min. COMPLETED Page 1 of 2 Building Review (Continued) D ESCRIPTIO N CO MMEN TS STATUS roll-in shower). Service Facilities meet the requirements of IBC Section 1109.11 Service counter must meet accessibility requirements. COMPLETED Ventilation is provided as per IBC Section 1203 Rooms without openings for natural ventilation will require mechanical ventilation. COMPLETED Site Grading meets the requirements of IBC Section 1804.3 Water retention area on south side approved 9' from building as per drawings. Four handicap parking stalls shown on revisions. COMPLETED Page 2 of 2 Building Review (Continued) D ESCRIPTIO N CO MMEN TSSTATUS