Loading...
HomeMy WebLinkAboutCOMCHECK - 16-00399 - CFT Retail PlazaCOMcheck Software Version 4.0.2.9 Mechanical Compliance Certificate Project Title: 2012 IECC Project Type:New Construction Location:Rexburg, Idaho Climate Zone:6b Construction Site: 303 E MOODY ROAD REXBURG, ID Owner/Agent: CFT NV. DEVELOPMENTS, INC 1683 Walnut Grove Ave. Rosemead, CA 91770 626-8-799-9898 Designer/Contractor: GARY WANG & ASSOCIATES, INC. 1255 Corporate Center Dr., Suite 8 Monterey Park, CA 91754 TEL: (626) 288-6898 Project Information Energy Code: CFT RETAIL PLAZA On-site Renewable Energy Additional Efficiency Package Mechanical Systems List Quantity System Type & Description Heating: 2 each - Central Furnace, Gas, Capacity = 115 kBtu/h Proposed Efficiency = 82.00% Et, Required Efficiency = 80.00% Et Cooling: 2 each - Field-Assembled DX System, Capacity = 53 kBtu/h, Air-Cooled Condenser, Air Economizer No minimum efficiency requirement applies Fan System: Unspecified 2 RTU-110, 120 (Single Zone): Heating: 2 each - Central Furnace, Gas, Capacity = 180 kBtu/h Proposed Efficiency = 82.00% Et, Required Efficiency = 80.00% Et Cooling: 2 each - Field-Assembled DX System, Capacity = 88 kBtu/h, Air-Cooled Condenser, Air Economizer No minimum efficiency requirement applies Fan System: Unspecified 2 RTU-100, 130 (Single Zone): Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.2.9 and to comply with the mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: CFT RETAIL PLAZA JT working folder new\JT 2012, 2013\JT 2016\mix\Comcheck\1605016.cck 07/14/16Report date: 81 ofPage Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version 4.0.2.9 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2012 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR2]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Complies Does Not Not Observable Not Applicable C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CFT RETAIL PLAZA JT working folder new\JT 2012, 2013\JT 2016\mix\Comcheck\1605016.cck 07/14/16Report date: 82 ofPage Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C403.2.4. 5 [FO9]3 Freeze protection and snow/ice melting system sensors for future connection to controls. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CFT RETAIL PLAZA JT working folder new\JT 2012, 2013\JT 2016\mix\Comcheck\1605016.cck 07/14/16Report date: 83 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.2.3 [ME55]2 HVAC equipment efficiency verified.Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.2.5. 1 [ME59]1 Demand control ventilation provided for spaces >500 sq.ft. and >25 people/1000 sq.ft. occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. Complies Does Not Not Observable Not Applicable C403.2.7 [ME60]2 HVAC ducts and plenums insulated. Where ducts or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable C403.2.8 [ME61]2 HVAC piping insulation thickness. Where piping is installed in or under a slab, verification may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable C403.2.8 [ME61]2 HVAC piping insulation thickness. Where piping is installed in or under a slab, verification may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable C403.2.8. 1 [ME7]3 Piping Insulation exposed to weather is protected from damage (due to sun, moisture, wind, etc.). Complies Does Not Not Observable Not Applicable C403.2.8 [ME41]3 Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5. Complies Does Not Not Observable Not Applicable C403.2.7 [ME10]2 Ducts and plenums sealed based on static pressure and location. Complies Does Not Not Observable Not Applicable C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.2.7. 1.3 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.3.1, C403.3.1. 1 [ME62]1 Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CFT RETAIL JT 2012, 2013\JT 2016\mix\Comcheck\1605016.cck 07/14/16Report date: 84 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.3.1, C403.3.1. 1 [ME62]1 Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. Complies Does Not Not Observable Not Applicable C408.2.2. 1 [ME53]3 Air outlets and zone terminal devices have means for air balancing. Complies Does Not Not Observable Not Applicable C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable C403.4.2 [ME66]2 VAV fan motors >=7.5 hp to be driven by variable speed drive, have a vane- axial fan with variable pitch blades, or have controls to limit fan motor demand. Complies Does Not Not Observable Not Applicable C403.2.6 [ME57]1 Exhaust air energy recovery on systems meeting Table C403.2.6 Complies Does Not Not Observable Not Applicable C403.2.11 [ME71]2 Unenclosed spaces that are heated use only radiant heat. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CFT RETAIL PLAZA JT 2012, 2013\JT 2016\mix\Comcheck\1605016.cck 07/14/16Report date: 85 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 2 [FI38]3 Thermostatic controls have a 5 °F deadband. Complies Does Not Not Observable Not Applicable C403.2.4. 2 [FI20]3 Temperature controls have setpoint overlap restrictions. Complies Does Not Not Observable Not Applicable C403.2.4. 3 [FI39]3 Each zone equipped with setback controls using automatic time clock or programmable control system. Complies Does Not Not Observable Not Applicable C403.2.4. 3 [FI40]3 Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2- hour occupant override, 10-hour backup Complies Does Not Not Observable Not Applicable C408.2.5. 1 [FI7]3 Furnished HVAC as-built drawings submitted within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C303.3, C408.2.5. 3 [FI8]3 Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C408.2.5. 3 [FI43]1 An air and/or hydronic system balancing report is provided for HVAC systems. Complies Does Not Not Observable Not Applicable C408.2.3. 2 [FI10]1 HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Complies Does Not Not Observable Not Applicable C403.2.2 [FI27]3 HVAC systems and equipment capacity does not exceed calculated loads. Complies Does Not Not Observable Not Applicable C408.2.1 [FI28]1 Commissioning plan developed by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CFT RETAIL PLAZA JT working folder new\JT 2012, 2013\JT 2016\mix\Comcheck\1605016.cck 07/14/16Report date: 86 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C408.2.4 [FI29]1 Preliminary commissioning report completed and certified by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable C408.2.5. 4 [FI30]1 Final commissioning report due to building owner within 90 days of receipt of certificate of occupancy. Complies Does Not Not Observable Not Applicable C408.2.3. 1 [FI31]1 HVAC equipment has been tested to ensure proper operation. Complies Does Not Not Observable Not Applicable C408.2.3. 3 [FI32]1 Economizers have been tested to ensure proper operation. Complies Does Not Not Observable Not Applicable C406 [FI34]1 Efficient HVAC performance, efficient lighting system, or on-site supply of renewable energy consistent with what is shown the approved plans. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CFT RETAIL PLAZA JT working folder new\JT 2012, 2013\JT 2016\mix\Comcheck\1605016.cck 07/14/16Report date: 87 ofPage Project Title: Data filename: CFT RETAIL PLAZA JT working folder new\JT 2012, 2013\JT 2016\mix\Comcheck\1605016.cck 07/14/16Report date: 88 ofPage