Loading...
HomeMy WebLinkAboutCOMCHECK - 16-00577 - 117 S 2nd E - Mattson Apts - Bldg B NO 23 UnitsCOMcheck Software Version 4.0.5.1 Mechanical Compliance Certificate Project Information Energy Code: 2012 IECC Project Title: Mattson Apartments Building 2 Location: Rexburg, Idaho Climate Zone: 6b Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: Rexburg, ID Dwayne Sudweeks Engineered Systems Assoc., Inc. Additional Efficiency Package 1355 E. Center St. Pocatello, ID 83201 208-233-0501 dcs@engsystems.com Unspecified Mechanical Systems List Quantity System Type & Description 24 HVAC System 1 (Single Zone): Heating: 1 each - Duct Furnace, Gas, Capacity = 66 kBtu/h Proposed Efficiency = 95.00% Ec, Required Efficiency = 80.00% Ec Cooling: 1 each - Split System, Capacity = 36 kBtu/h, Air -Cooled Condenser, No Economizer, Economizer exception: Low Capacity Residential Proposed Efficiency = 13.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 1200 CFM, 0.3 motor nameplate hp HVAC System 2 (Single Zone): Packaged Terminal Heat Pump Heating Mode: Capacity = 12 kBtu/h, Proposed Efficiency = 3.50 COP, Required Efficiency = 2.97 COP Cooling Mode: Capacity = 9 kBtu/h, Proposed Efficiency = 13.00 EER, Required Efficiency: 11.30 EER Fan System: FAN SYSTEM 1 — Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 1200 CFM, 0.3 motor nameplate hp 23 Water Heater 1: Electric Storage Water Heater, Capacity: 50 gallons Proposed Efficiency: 0.86 EF, Required Efficiency: 0.86 EF 1 Water Heater 2: Electric Instantaneous Water Heater, Capacity: 20 gallons No minimum efficiency requirement applies 1 Water Heater 3: Electric Instantaneous Water Heater, Capacity: 0 gallons No minimum efficiency requirement applies Project Title: Mattson Apartments Building 2 Report date: 0220/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 1 of 11 Mechanical Compliance Statement Compliance Statement. The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.5.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title nature Date Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 2 of 11 COMcheck Software Version 4. Inspection Checklist Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Plan Review I Complies? Comments/Assumptions C103.2 Plans, specifications, and/or ❑Complies [PR2]1 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the mechanical ❑Not Applicable systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. C103.2 [PR3]1 C406 [PR9]1 Plans, specifications, and/or ❑Complies calculations provide all information ❑Does Not with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Additional Comments/Assumptions: ❑Not Observable ❑Not Applicable ❑Complies ❑Does Not ❑Not Observable ❑Not Applicable i 1 High Impact (Tier 1) 2 , Medium Impact (Tier 2) 3 ,Low Impact (Tier 3) Project Title: Mattson Apartments Building 2 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Report date: 02/20/17 Page 3 of 11 # Footing / Foundation Inspection & Req.1D L — C403.2.4. Freeze protection and snow/ice 5 melting system sensors for future IF09]3 connection to controls. Additional Comments/Assumptions: Complies? LJComphes ❑Does Not ❑Not Observable ❑Not ADDlicable Comments/Assumptions 11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 4 of 11 Section # Plumbing Rough -In Inspection Complies? Comments/Assumptions & Req.ID 1 C404.3 Temperature controls installed on ❑Complies [PL5]3 service water heating systems (110 F ❑Does Not for dwelling units and lavatories in [:]Not Observable public restrooms and 90 F for other ❑Not Applicable occupancies.) C404.3 Temperature controls installed on ❑Complies [PL5]3 service water heating systems (110 F ❑Does Not for dwelling units and lavatories in ❑Not Observable public restrooms and 90 F for other []Not Applicable occupancies.) C404.2 Heat traps installed on non -circulating ❑Complies [PL4]3 storage water tanks. ❑Does Not ❑Not Observable ❑Not Applicable CC404.2 Heat traps installed on non -circulating ❑Complies [PL4]3 storage water tanks. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: i 1 High Impact (Tier 1) ; 2 I Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 5 of 11 section # Mechanical Rough -in Inspection ! Complies? Comments/Assumptions & Req ID C403.2.3 HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values. [ME55]2 ❑Does Not ❑Not Observable ❑Not Applicable C403.2.5. Demand control ventilation provided ❑Complies 1 for spaces >500 sq.ft, and >25 ❑Does Not JME5911 people/1000 sq.ft. occupant density ❑Not Observable and served by systems with air side ❑Not Applicable economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. IC403.2.7 HVAC ducts and plenums insulated. ❑Complies JME60]2 Where ducts or plenums are installed ❑Does Not in or under a slab, verification may ❑Not Observable need to occur during Foundation ❑Not Applicable Inspection. �C403.2.8 HVAC piping insulation thickness. ❑Complies [ME61]2 Where piping is installed in or under a ❑Does Not slab, verification may need to occur ❑Not Observable Iduring Foundation Inspection. ❑Not Applicable C403.2.8. Piping Insulation exposed to weather ❑Complies 1 is protected from damage (due to sun, ❑Does Not ! [ME7]3 moisture, wind, etc.). ❑Not Observable ❑Not Applicable C403.2.8 Thermally ineffective panel surfaces of ❑Complies [ME41]3 sensible heating panels have ❑Does Not insulation >= R-3.5. ❑Not Observable ❑Not Applicable C403.3.1. Total cooling capacity without ❑Complies a economizers must be less than ❑Does Not [NA]0 %varMaxKBtuPerH%. ❑Not Observable F ❑Not Applicable 1 C403.2.7 Ducts and plenums sealed based on ❑Complies [ME10]2 i static pressure and location. ❑Does Not ❑Not Observable ❑Not Applicable 1C403.2.7. Ductwork operating >3 in. water ❑Complies 11.3 [ME11]3 column requires air leakage testing. ❑Does Not ❑Not Observable j ❑Not Applicable C403.2.7. Ductwork operating >3 in. water ❑Complies 11.3 column requires air leakage testing. ❑Does Not (ME11]3 ❑Not Observable Applicable C408.2.2. _❑Not Air outlets and zone terminal devices - ❑Complies 1 have means for air balancing. ❑Does Not [ME53]3 1 ❑Not Observable j ❑Not Applicable fC403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor ❑Not Applicable demand. ------------------ 11 High Impact (Tier 1) j 2 1 Medium Impact (Tier 2)_ j 3_1 Low Impact (Tier 3) Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 6 of 11 Section II # I Mechanical Rough -in Inspection 1 Complies? Comments/Assumptions Req.ID & — C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies I [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor ❑Not Applicable demand. C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor ❑Not Applicable demand. C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies [ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or ❑Not Observable have controls to limit fan motor ❑Not Applicable demand. k C403.4.2 VAV fan motors >=7.5 hp to be driven ❑Complies !;[ME66]2 by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or fan ❑Not Observable have controls to limit motor ❑Not Applicable 1C403.2.6 demand. Exhaust air energy recovery on ❑Complies [ME57]1 systems meeting Table C403.2.6 ❑Does Not ❑Not Observable ❑Not Applicable C403.2.11 Unenclosed spaces that are heated ❑Complies i[ME71]2 use only radiant heat. El Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1) 2- Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 7 of 11 1 !High Impact (Tier 1) 2 Medium Impact (Tier 2) — 3 ow Impact (Tier 3) Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 8 of 11 i # Final Inspection Complies? Comments/Assumptions & Req.ID C403.2.4. Heating and cooling to each zone is ❑Complies s l controlled by a thermostat control. ❑Does Not [F[47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ❑Not Applicable i system. C403.2.4. Heating and cooling to each zone is ❑Complies 1 1 controlled by a thermostat control. ❑Does Not 1 [FI47]3 Minimum one humidity control device ❑Not Observable j per installed humidification/dehumidification ❑Not Applicable system. IC403.2.4. Thermostatic controls have a 5 'F ❑Complies 2 deadband. ❑Does Not [F138]3 ❑Not Observable f ❑Not Applicable C403.2.4. — Temperature controls have setpoint – ❑Complies i2 overlap restrictions. ❑Does Not [F120]3 ❑Not Observable ❑Not Applicable C403.2.4. Each zone equipped with setback ❑Complies k3 controls using automatic time clock or ❑Does Not [F139]3 programmable control system. ❑Not Observable ❑Not Applicable C403.2.4. Automatic Controls: Setback to 55°F ❑Complies %3 (heat) and 85'F (cool); 7-day clock, 2- ❑Does Not [F[40]3 hour occupant override, 10-hour ❑Not Observable I backup ❑Not Applicable rC403.2.4. Systems include optimum start ❑Complies 3.3 controls. ❑Does Not '[F141 ]3 ❑Not Observable ❑Not Applicable !C403.2.4. Systems include optimum start ❑Complies { 3.3 controls. ❑Does Not ;[FI41]3 's ❑Not Observable ' ❑Not Applicable iC403.2.4. - Heat pump controls prevent ❑Complies 1.1 supplemental electric resistance heat ❑Does Not j [F142]3 from coming on when not needed. ❑Not Observable ❑Not Applicable 1 C408.2.5. Furnished HVAC as-built drawings ❑Complies 1 submitted within 90 days of system ❑Does Not �[F17]3 acceptance. ❑Not Observable ❑Not Applicable C303.3, Furnished O&M manuals for HVAC ❑Complies C408.2.5. systems within 90 days of system ❑Does Not 13 [FIS]3 acceptance. ❑Not Observable ❑Not Applicable I C408.2.5. An air and/or hydronic system ❑Complies 13 balancing report is provided for HVAC ❑Does Not �[F[43]1 systems. ❑Not Observable I ❑Not Applicable 1 !High Impact (Tier 1) 2 Medium Impact (Tier 2) — 3 ow Impact (Tier 3) Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 8 of 11 Section # Final inspection i J Complies? Comments/Assumptions & Req.1D -- --I - —-- C408.2.3. HVAC control systems have been ❑Complies 12 tested to ensure proper operation, ❑Does Not j [FI10]1 calibration and adjustment of controls. ❑Not Observable ❑Not Applicable j C404.3 Public lavatory faucet water ❑Complies ![F111]3 temperature <=110°F. ❑Does Not ❑Not Observable j ❑Not Applicable C404.3 Public lavatory faucet water ❑Complies [Fl 11]3 temperature <=110'F. ❑Does Not ❑Not Observable ❑Not Applicable ----------- ---- — C404.3 --- Public lavatory faucet water - --- ❑Complies `[FI11]3 temperature <=110'F. ❑Does Not ❑Not Observable i � ❑Not Applicable- j C404.5 First 8 ft of outlet piping is insulated ❑Complies �[FI45]2 ❑Does Not ❑Not Observable ❑Not Applicable ' C404.5 First 8 ft of outlet piping is insulated ❑Complies 1[FI45]2 ❑Does Not ❑Not Observable ❑Not Applicable 0404.5 First 8 ft of outlet piping is insulated ❑Complies JF145]2 ❑Does Not ❑Not Observable ❑Not Applicable 0403.2.2 HVAC systems and equipment ❑Complies 1[F127]3 capacity does not exceed calculated ❑Does Not loads. ❑Not Observable ❑Not Applicable C408.2.1 Commissioning plan developed by ❑Complies [FI28]1 registered design professional or ❑Does Not approved agency. ❑Not Observable ❑Not Applicable C408.2.4 Preliminary commissioning report ❑Complies [F129]1 completed and certified by registered ❑Does Not design professional or approved ❑Not Observable agency. ❑Not Applicable ' C408.2.5. �4 Final commissioning report due to ❑Complies building owner within 90 days of ❑Does Not 493011 receipt of certificate of occupancy. ❑Not Observable ❑Not Applicable C408.2.3. HVAC equipment has been tested to ❑Complies 1 ensure proper operation. ❑Does Not [FI31]1 ❑Not Observable ❑Not Applicable - C406 Efficient HVAC performance, efficient -- ❑Complies [F134]1 lighting system, or on-site supply of ❑Does Not renewable energy consistent with Observable - what is shown the approved plans. _❑Not ❑Not Applicable 1 - -- High Impact (Tier 1) Medium Impact (Tier 2) 3 row Impact (Tier 3) 2J_-- - Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 9 of 11 Additional Comments/Assumptions: 1 1 High Impact (Tier 1) 12 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 10 of 11 Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne I5\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 11 of 11 Envelope Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Vertical Glazing / Wall Area Construction Site: E 1st S. & S. 2nd E. Rexburg, ID Building Area 2012 IECC Mattson Apartments Building 2 Rexburg, Idaho 6b New Construction 11% Owner/Agent: Designer/Contractor: Dwayne Sudweeks Engineered Systems Assoc., Inc. 1355 E. Center St. Pocatello, ID 83201 208-233-0501 dcs@engsystems.com Floor Area 1 -Dormitory : Residential 41205 Additional Efficiency Package High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Envelope Assemblies Assembly Gross Area Cavity Cont Proposed Budget U - or R -Value R -Value U -Factor Factor(e) Perimeter Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 - Dormitory] 9078 38.0 10:0 0.021 0.021 Exterior Wall 1: Wood -Framed, 16" o.c., [Bldg. Use 1 - Dormitory] 20862 23.0 5.0 0.043 0.051 Window 1: Vinyl/Fiberglass Frame:Fixed, Perf. Type: Energy code 1200 -- -- 0.550 0.360 default, Double Pane, Clear, SHGC 0.70, [Bldg. Use 1 - Dormitory] Window 2: Vinyl/Fiberglass Frame:Fixed, Perf. Type: Energy code 50 -- — 0.550 0.360 default, Double Pane, Clear, SHGC 0.70, [Bldg. Use 1 - Dormitory] Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Type: 42 -- --- 0.800 0.770 Energy code default, Double Pane, Clear, SHGC 0.70, [Bldg. Use 1 - Dormitory] Door 2: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Type: 48 --- — 0.800 0.770 Energy code default, Double Pane, Clear, SHGC 0.70, [Bldg. Use 1 - Dormitory] Door 3: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Type: 136 — — 0.800 0.770 Energy code default, Double Pane, Clear, SHGC 0.70, [Bldg. Use 1 - Dormitory] Door 4: Insulated Metal, Non -Swinging, [Bldg. Use 1 - Dormitory] 63 -- -- 0.100 0.100 Door 5: Glass (> 50% glazing):Metal Frame, Non -Entrance Door, Perf. 230 — — 0.800 0.770 Type: Energy code default, Double Pane, Clear, SHGC 0.70, [Bldg. Use 1 - Dormitory] Door 6: Glass (> 50% glazing):Metal Frame, Non -Entrance Door, Perf. 624 — — 0.800 0.770 Type: Energy code default, Double Pane, Clear, SHGC 0.70, [Bldg Use 1 - Dormitory] Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bldg2.cck Page 1 of 9 Assembly Gross Area Cavity Cont. Proposed Budget U - or R -Value R -Value U -Factor Factor(a) Perimeter Basement Wall 1: Solid Concrete:6" Thickness, Light Density, Furring: 585 --- 13.0 0.065 0.108 None, Wall Ht 9.0, Depth B.G. 9.0, [Bldg. Use 1 - Dormitory] Floor 1: Slab -On -Grade: Unheated, Horizontal with vertical 2 ft., [Bldg. 574 -- 15.0 0.690 0.520 Use 1 - Dormitory] (b) (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. (b) Slab -On -Grade proposed and budget U -factors shown in table are F -factors. clone PASSES: Desinn 2%„ hatter than code Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.5.1 and to comply with any applicable mandatory r quirements listed in the Inspection Checklist. Name -Title ignature Date Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bldg2.cck Page 2 of 9 COMcheck Software Version .1 Inspection Checklist Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. section # Plan Review Complies? & Req.11) - - -' C103.2 Plans and/or specifications provide all ❑Complies [PR111 information with which compliance ❑Does Not can be determined for the building ❑Not Observal envelope and document where ❑Not Applicab exceptions to the standard are claimed. C 04C 6 Plans, specifications, and/or ❑Complies [PR9]1 calculations provide all information ❑Does Not with which compliance can be ❑Not Observal determined for the additional energy ❑Not Applicab efficiency package options. C402.3.1 The vertical fenestration area <= 30 ❑Complies [PR10]1 percent of the gross above -grade wall ❑Does Not area. ❑Not Observal ❑Not Applicab C402.3.1 The skylight area <= 3 percent of the ❑Complies J[PR1111 gross roof area. ❑Does Not ❑Not Observal ❑Not Applicab C402.3.2. Skylights in office, storage, ❑Complies 2 automotive service, manufacturing, ❑Does Not I [PR15]1 non -refrigerated warehouse, retail ❑Not Observa store, and distribution/sorting area ❑Not Applicab j have a measured haze value > 90 percent unless designed to exclude direct sunlight. Additional Comments/Assumptions: 1 I High Impact (Tier 1) J 2 Medium Impact (Tier 2) j 3 FLow Impact (Tier 3) Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bldg2.cck Page 3 of 9 Section # Footing / Foundation Inspection i Complies? ( Comments/Assumptions & Req.ID --- ---- -- - - C402.2.4 Below -grade wall insulation R -value. ❑Complies See the Envelope Assemblies table for values. [FOl]2 []Does Not ❑Not Observable ❑Not Applicable C303.2 Below -grade wall insulation installed ❑Complies I[F02]2 per manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable -- ---- C4402.2.02.2.6 Slab edge insulation R -value. ❑Complies See the Envelope Assemblies table for values. ,[FO3]2 ❑Does Not ❑Not Observable ❑Not Applicable 'FC303.2 Slab edge insulation installed per ❑Complies j[FO4]2 manufacturer's instructions. ❑Does Not ❑Not Observable a ❑Not Applicable - C402.2.6 _ Slab edge insulation depth/length. ❑Complies See the Envelope Assemblies table for values. j[FO5]2 Slab insulation extending away from ❑Does Not building is covered by pavement or ❑Not Observable >= 10 inches of soil. ❑Not Applicable C403.2.8. Exterior insulation protected against ❑Complies 1 damage, sunlight, moisture, wind, ❑Does Not [FO6]1 landscaping and equipment ❑Not Observable maintenance activities. ❑Not Applicable C402.2.8 Bottom surface of floor structures ❑Complies See the Envelope Assemblies table for values. [FO12]3 incorporating radiant heating ❑Does Not insulated to >=R-3.5. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 `High Impact (Tier 1) 2 LMedium Impact (Tier 2)- _13TLow IImpact (Tier 3) �._ - Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bldg2.cck Page 4 of 9 Section # Framing / Rough -In Inspection Complies? Comments/Assumptions & Req.ID -- - .. --- --- C402.4.1, - --- --- The building envelope contains a ❑Complies C402.4.2 continuous air barrier that is sealed in ❑Does Not [FR16]' an approved manner and either ❑Not Observable j constructed or tested in an approved ❑Not Applicable manner. Air barrier penetrations are IC402.4.3, sealed in an approved manner. ❑Complies Factory -built fenestration and doors C402.4.4 are labeled as meeting air leakage ❑Does Not I [FR18]3 requirements. ❑Not Observable ❑Not Applicable C402.4.7 Vestibules are installed on all building ❑Complies [FR17]3 entrances. Doors have self-closing ❑Does Not i devices. ❑Not Observable ❑Not Applicable i C402.3.3, Vertical fenestration U -Factor. ❑Complies See the Envelope Assemblies table for values. C402.3.4 ❑Does Not 1[FR8]1 ❑Not Observable ❑Not Applicable i C402.3.3 Vertical fenestration SHGC value. ❑Complies See the Envelope Assemblies table for values. [FR10]' ❑Does Not ❑Not Observable ❑Not Applicable C303.1.3 Fenestration products rated in ❑Complies [FR12]2 accordance with NFRC. ❑Does Not ❑Not Observable - ❑Not Applicable IC303.1.3 Fenestration products are certified as ❑Complies j[FR13]1 to performance labels or certificates ❑Does Not provided. ❑Not Observable i ❑Not Applicable C402.2.7 U -factor of opaque doors associated ❑Complies See the Envelope Assemblies table for values. [FR14]2 with the building thermal envelope ❑Does Not i meets requirements. ❑Not Observable I j ❑Not Applicable Additional Comments/Assumptions: — - _ - -- `1 High Impact (Tier 1) 2 jMedium Impact (Tier 2) � 3 Low Impact (Tier 3) Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments BIdg2.cck Page 5 of 9 I Mechanical Rough -in Inspection Complies? Comments/Assumptions & Req.ID , C402.4.5. Stair and elevator shaft vents have ❑Complies 1 motorized dampers that automatically ❑Does Not I[ME3]3 close. ❑Not Observable ❑Not Applicable C402.4.5. Outdoor air and exhaust systems have ❑Complies 2 motorized dampers that automatically ❑Does Not [ME58]3 shut when not in use and meet ❑Not Observable maximum leakage rates. Check gravity dampers where allowed. ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bidg2.cck Page 6 of 9 Section # j Insulation inspection Complies? Comments/Assumptions & Req. ID J C402.4.1. All sources of air leakage in the ❑Complies 1 building thermal envelope are sealed, ❑Does Not i[IN1]1 caulked, gasketed, weather stripped ❑Not Observable or wrapped with moisture vapor - ❑Not Applicable permeable wrapping material to minimize air leakage. C402.4.2. Roof R -value. For some ceiling ❑Complies See the Envelope Assemblies table for values. 1 systems, verification may need to ❑Does Not [IN2]1 occur during Framing Inspection. ❑Not Observable ❑Not Applicable C303.2 Roof insulation installed per ❑Complies j [IN3]1 manufacturer's instructions. Blown or ❑Does Not poured loose -fill insulation is installed ❑Not Observable only where the roof slope is <=3 in ❑Not Applicable 12. 0303.2 Above -grade wall insulation installed ❑Complies [IN7]1 per manufacturer's instructions. ❑Does Not ❑Not Observable j ❑Not Applicable C402.2.5 Floor insulation R -value. ❑Complies See the Envelope Assemblies table for values. i[IN8]2 I ❑Does Not ❑Not Observable j ❑Not Applicable C303.1 _ Building envelope insulation is labeled ❑Complies [IN10]2 with R -value or insulation certificate ❑Does Not providing R -value and other relevant ❑Not Observable data. ❑Not Applicable C303.2.1 Exterior insulation is protected from ❑Complies [IN14]2 damage with a protective material. ❑Does Not Verification for exposed foundation ❑Not Observable insulation may need to occur during ❑Not Applicable Foundation Inspection. C402.2.1 Insulation intended to meet the roof ❑Complies JIN1713 insulation requirements cannot be ❑Does Not installed on top of a suspended ❑Not Observable ceiling. Mark this requirement ❑Not Applicable compliant if insulation is installed arrordinoly. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 � Low Impact (Tier 3) Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bldg2.cck Page 7 of 9 Section I # Final Inspection I Complies? & RegAD I I _ C402.4.6 Weatherseals installed on all loading ❑Complies [F137]1 dock cargo doors. ❑Does Not ❑Not Observable ❑Not Applicable C402.4.8 Recessed luminaires in thermal ❑Complies [FI26]3 envelope to limit infiltration and be IC ❑Does Not rated and labeled. Seal between ❑Not Observable interior finish and luminaire housing. ❑Not Applicable C406 Efficient HVAC performance, efficient ❑Complies [F13413 lighting system, or on-site supply of ❑Does Not renewable energy consistent with ❑Not Observable what is shown the approved plans. ❑Not Applicable Additional Comments/Assumptions: Comments/Assumptions 1 High Impact -Tier 1) 2 Medium Impact (Tier 2) - 3 mow Impact (Tier 3) Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments BIdg2.cck Page 8 of 9 Project Title: Mattson Apartments Building 2 Report date: 02/20/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bldg2.cck Page 9 of 9