Mechanical Compliance Certificate
Project Information
Energy Code:
2012 IECC
Project Title:
Mattson Apartments Building 2
Location:
Rexburg, Idaho
Climate Zone:
6b
Project Type:
New Construction
Construction Site: Owner/Agent: Designer/Contractor:
Rexburg, ID Dwayne Sudweeks
Engineered Systems Assoc., Inc.
Additional Efficiency Package 1355 E. Center St.
Pocatello, ID 83201
208-233-0501
dcs@engsystems.com
Unspecified
Mechanical Systems List
Quantity System Type & Description
24 HVAC System 1 (Single Zone):
Heating: 1 each - Duct Furnace, Gas, Capacity = 66 kBtu/h
Proposed Efficiency = 95.00% Ec, Required Efficiency = 80.00% Ec
Cooling: 1 each - Split System, Capacity = 36 kBtu/h, Air -Cooled Condenser, No Economizer, Economizer exception: Low Capacity
Residential
Proposed Efficiency = 13.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 1200 CFM, 0.3 motor nameplate hp
HVAC System 2 (Single Zone):
Packaged Terminal Heat Pump
Heating Mode: Capacity = 12 kBtu/h,
Proposed Efficiency = 3.50 COP, Required Efficiency = 2.97 COP
Cooling Mode: Capacity = 9 kBtu/h,
Proposed Efficiency = 13.00 EER, Required Efficiency: 11.30 EER
Fan System: FAN SYSTEM 1 — Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 1200 CFM, 0.3 motor nameplate hp
23 Water Heater 1:
Electric Storage Water Heater, Capacity: 50 gallons
Proposed Efficiency: 0.86 EF, Required Efficiency: 0.86 EF
1 Water Heater 2:
Electric Instantaneous Water Heater, Capacity: 20 gallons
No minimum efficiency requirement applies
1 Water Heater 3:
Electric Instantaneous Water Heater, Capacity: 0 gallons
No minimum efficiency requirement applies
Project Title: Mattson Apartments Building 2 Report date: 0220/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 1 of 11
Mechanical Compliance Statement
Compliance Statement. The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.0.5.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title nature Date
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 2 of 11
COMcheck Software Version 4.
Inspection Checklist
Energy Code: 2012 IECC
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Plan Review I Complies?
Comments/Assumptions
C103.2 Plans, specifications, and/or
❑Complies
[PR2]1 calculations provide all information
❑Does Not
with which compliance can be
❑Not Observable
determined for the mechanical
❑Not Applicable
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
C103.2
[PR3]1
C406
[PR9]1
Plans, specifications, and/or ❑Complies
calculations provide all information ❑Does Not
with which compliance can be
determined for the service water
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Additional Comments/Assumptions:
❑Not Observable
❑Not Applicable
❑Complies
❑Does Not
❑Not Observable
❑Not Applicable
i 1 High Impact (Tier 1) 2 , Medium Impact (Tier 2) 3 ,Low Impact (Tier 3)
Project Title: Mattson Apartments Building 2
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck
Report date: 02/20/17
Page 3 of 11
# Footing / Foundation Inspection
& Req.1D L —
C403.2.4. Freeze protection and snow/ice
5 melting system sensors for future
IF09]3 connection to controls.
Additional Comments/Assumptions:
Complies?
LJComphes
❑Does Not
❑Not Observable
❑Not ADDlicable
Comments/Assumptions
11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 4 of 11
Section
#
Plumbing Rough -In Inspection
Complies?
Comments/Assumptions
& Req.ID
1
C404.3
Temperature controls installed on
❑Complies
[PL5]3
service water heating systems (110 F
❑Does Not
for dwelling units and lavatories in
[:]Not Observable
public restrooms and 90 F for other
❑Not Applicable
occupancies.)
C404.3
Temperature controls installed on
❑Complies
[PL5]3
service water heating systems (110 F
❑Does Not
for dwelling units and lavatories in
❑Not Observable
public restrooms and 90 F for other
[]Not Applicable
occupancies.)
C404.2
Heat traps installed on non -circulating
❑Complies
[PL4]3
storage water tanks.
❑Does Not
❑Not Observable
❑Not Applicable
CC404.2
Heat traps installed on non -circulating
❑Complies
[PL4]3
storage water tanks.
❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
i 1 High Impact (Tier 1) ; 2 I Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 5 of 11
section
#
Mechanical Rough -in Inspection
! Complies?
Comments/Assumptions
& Req ID
C403.2.3
HVAC equipment efficiency verified.
❑Complies See the Mechanical Systems list for values.
[ME55]2
❑Does Not
❑Not Observable
❑Not Applicable
C403.2.5.
Demand control ventilation provided
❑Complies
1
for spaces >500 sq.ft, and >25
❑Does Not
JME5911
people/1000 sq.ft. occupant density
❑Not Observable
and served by systems with air side
❑Not Applicable
economizer, auto modulating outside
air damper control, or design airflow
>3,000 cfm.
IC403.2.7
HVAC ducts and plenums insulated.
❑Complies
JME60]2
Where ducts or plenums are installed
❑Does Not
in or under a slab, verification may
❑Not Observable
need to occur during Foundation
❑Not Applicable
Inspection.
�C403.2.8
HVAC piping insulation thickness.
❑Complies
[ME61]2
Where piping is installed in or under a
❑Does Not
slab, verification may need to occur
❑Not Observable
Iduring
Foundation Inspection.
❑Not Applicable
C403.2.8.
Piping Insulation exposed to weather
❑Complies
1
is protected from damage (due to sun,
❑Does Not
! [ME7]3
moisture, wind, etc.).
❑Not Observable
❑Not Applicable
C403.2.8
Thermally ineffective panel surfaces of
❑Complies
[ME41]3
sensible heating panels have
❑Does Not
insulation >= R-3.5.
❑Not Observable
❑Not Applicable
C403.3.1.
Total cooling capacity without
❑Complies
a
economizers must be less than
❑Does Not
[NA]0
%varMaxKBtuPerH%.
❑Not Observable
F
❑Not Applicable
1 C403.2.7
Ducts and plenums sealed based on
❑Complies
[ME10]2
i
static pressure and location.
❑Does Not
❑Not Observable
❑Not Applicable
1C403.2.7.
Ductwork operating >3 in. water
❑Complies
11.3
[ME11]3
column requires air leakage testing.
❑Does Not
❑Not Observable
j
❑Not Applicable
C403.2.7.
Ductwork operating >3 in. water
❑Complies
11.3
column requires air leakage testing.
❑Does Not
(ME11]3
❑Not Observable
Applicable
C408.2.2.
_❑Not
Air outlets and zone terminal devices
-
❑Complies
1
have means for air balancing.
❑Does Not
[ME53]3
1
❑Not Observable
j
❑Not Applicable
fC403.4.2
VAV fan motors >=7.5 hp to be driven
❑Complies
[ME66]2
by variable speed drive, have a vane-
❑Does Not
axial fan with variable pitch blades, or
❑Not Observable
have controls to limit fan motor
❑Not Applicable
demand.
------------------
11 High Impact (Tier 1) j 2 1 Medium Impact (Tier 2)_ j 3_1 Low Impact (Tier 3)
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 6 of 11
Section
II #
I Mechanical Rough -in Inspection
1 Complies?
Comments/Assumptions
Req.ID
&
—
C403.4.2
VAV fan motors >=7.5 hp to be driven
❑Complies
I [ME66]2
by variable speed drive, have a vane-
❑Does Not
axial fan with variable pitch blades, or
❑Not Observable
have controls to limit fan motor
❑Not Applicable
demand.
C403.4.2
VAV fan motors >=7.5 hp to be driven
❑Complies
[ME66]2
by variable speed drive, have a vane-
❑Does Not
axial fan with variable pitch blades, or
❑Not Observable
have controls to limit fan motor
❑Not Applicable
demand.
C403.4.2
VAV fan motors >=7.5 hp to be driven
❑Complies
[ME66]2
by variable speed drive, have a vane-
❑Does Not
axial fan with variable pitch blades, or
❑Not Observable
have controls to limit fan motor
❑Not Applicable
demand.
k
C403.4.2
VAV fan motors >=7.5 hp to be driven
❑Complies
!;[ME66]2
by variable speed drive, have a vane-
❑Does Not
axial fan with variable pitch blades, or
fan
❑Not Observable
have controls to limit motor
❑Not Applicable
1C403.2.6
demand.
Exhaust air energy recovery on
❑Complies
[ME57]1
systems meeting Table C403.2.6
❑Does Not
❑Not Observable
❑Not Applicable
C403.2.11
Unenclosed spaces that are heated
❑Complies
i[ME71]2
use only radiant heat.
El Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact (Tier 1) 2- Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 7 of 11
1 !High Impact (Tier 1) 2 Medium Impact (Tier 2) — 3 ow Impact (Tier 3)
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 8 of 11
i #
Final Inspection
Complies?
Comments/Assumptions
& Req.ID
C403.2.4.
Heating and cooling to each zone is
❑Complies
s l
controlled by a thermostat control.
❑Does Not
[F[47]3
Minimum one humidity control device
❑Not Observable
per installed
humidification/dehumidification
❑Not Applicable
i
system.
C403.2.4.
Heating and cooling to each zone is
❑Complies
1 1
controlled by a thermostat control.
❑Does Not
1 [FI47]3
Minimum one humidity control device
❑Not Observable
j
per installed
humidification/dehumidification
❑Not Applicable
system.
IC403.2.4.
Thermostatic controls have a 5 'F
❑Complies
2
deadband.
❑Does Not
[F138]3
❑Not Observable
f
❑Not Applicable
C403.2.4.
—
Temperature controls have setpoint
–
❑Complies
i2
overlap restrictions.
❑Does Not
[F120]3
❑Not Observable
❑Not Applicable
C403.2.4.
Each zone equipped with setback
❑Complies
k3
controls using automatic time clock or
❑Does Not
[F139]3
programmable control system.
❑Not Observable
❑Not Applicable
C403.2.4.
Automatic Controls: Setback to 55°F
❑Complies
%3
(heat) and 85'F (cool); 7-day clock, 2-
❑Does Not
[F[40]3
hour occupant override, 10-hour
❑Not Observable
I
backup
❑Not Applicable
rC403.2.4.
Systems include optimum start
❑Complies
3.3
controls.
❑Does Not
'[F141 ]3
❑Not Observable
❑Not Applicable
!C403.2.4.
Systems include optimum start
❑Complies
{ 3.3
controls.
❑Does Not
;[FI41]3
's
❑Not Observable
'
❑Not Applicable
iC403.2.4.
-
Heat pump controls prevent
❑Complies
1.1
supplemental electric resistance heat
❑Does Not
j [F142]3
from coming on when not needed.
❑Not Observable
❑Not Applicable
1 C408.2.5.
Furnished HVAC as-built drawings
❑Complies
1
submitted within 90 days of system
❑Does Not
�[F17]3
acceptance.
❑Not Observable
❑Not Applicable
C303.3,
Furnished O&M manuals for HVAC
❑Complies
C408.2.5.
systems within 90 days of system
❑Does Not
13
[FIS]3
acceptance.
❑Not Observable
❑Not Applicable
I C408.2.5.
An air and/or hydronic system
❑Complies
13
balancing report is provided for HVAC
❑Does Not
�[F[43]1
systems.
❑Not Observable
I
❑Not Applicable
1 !High Impact (Tier 1) 2 Medium Impact (Tier 2) — 3 ow Impact (Tier 3)
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 8 of 11
Section
#
Final inspection
i
J Complies?
Comments/Assumptions
& Req.1D
-- --I
- —--
C408.2.3.
HVAC control systems have been
❑Complies
12
tested to ensure proper operation,
❑Does Not
j [FI10]1
calibration and adjustment of controls.
❑Not Observable
❑Not Applicable
j C404.3
Public lavatory faucet water
❑Complies
![F111]3
temperature <=110°F.
❑Does Not
❑Not Observable
j
❑Not Applicable
C404.3
Public lavatory faucet water
❑Complies
[Fl 11]3
temperature <=110'F.
❑Does Not
❑Not Observable
❑Not Applicable
----------- ---- —
C404.3
---
Public lavatory faucet water
- ---
❑Complies
`[FI11]3
temperature <=110'F.
❑Does Not
❑Not Observable
i
�
❑Not Applicable-
j C404.5
First 8 ft of outlet piping is insulated
❑Complies
�[FI45]2
❑Does Not
❑Not Observable
❑Not Applicable
' C404.5
First 8 ft of outlet piping is insulated
❑Complies
1[FI45]2
❑Does Not
❑Not Observable
❑Not Applicable
0404.5
First 8 ft of outlet piping is insulated
❑Complies
JF145]2
❑Does Not
❑Not Observable
❑Not Applicable
0403.2.2
HVAC systems and equipment
❑Complies
1[F127]3
capacity does not exceed calculated
❑Does Not
loads.
❑Not Observable
❑Not Applicable
C408.2.1
Commissioning plan developed by
❑Complies
[FI28]1
registered design professional or
❑Does Not
approved agency.
❑Not Observable
❑Not Applicable
C408.2.4
Preliminary commissioning report
❑Complies
[F129]1
completed and certified by registered
❑Does Not
design professional or approved
❑Not Observable
agency.
❑Not Applicable
' C408.2.5.
�4
Final commissioning report due to
❑Complies
building owner within 90 days of
❑Does Not
493011
receipt of certificate of occupancy.
❑Not Observable
❑Not Applicable
C408.2.3.
HVAC equipment has been tested to
❑Complies
1
ensure proper operation.
❑Does Not
[FI31]1
❑Not Observable
❑Not Applicable
-
C406
Efficient HVAC performance, efficient
--
❑Complies
[F134]1
lighting system, or on-site supply of
❑Does Not
renewable energy consistent with
Observable
-
what is shown the approved plans.
_❑Not
❑Not Applicable
1 - --
High Impact (Tier 1) Medium Impact (Tier 2) 3 row Impact (Tier 3)
2J_-- -
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 9 of 11
Additional Comments/Assumptions:
1 1 High Impact (Tier 1) 12 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 10 of 11
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne I5\Documents\COMcheck\Mattson Bldg 2 Mech.cck Page 11 of 11
Envelope Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Vertical Glazing / Wall Area
Construction Site:
E 1st S. & S. 2nd E.
Rexburg, ID
Building Area
2012 IECC
Mattson Apartments Building 2
Rexburg, Idaho
6b
New Construction
11%
Owner/Agent: Designer/Contractor:
Dwayne Sudweeks
Engineered Systems Assoc., Inc.
1355 E. Center St.
Pocatello, ID 83201
208-233-0501
dcs@engsystems.com
Floor Area
1 -Dormitory : Residential 41205
Additional Efficiency Package
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Envelope Assemblies
Assembly
Gross Area
Cavity
Cont Proposed
Budget U -
or
R -Value
R -Value U -Factor
Factor(e)
Perimeter
Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 - Dormitory]
9078
38.0
10:0 0.021
0.021
Exterior Wall 1: Wood -Framed, 16" o.c., [Bldg. Use 1 - Dormitory]
20862
23.0
5.0 0.043
0.051
Window 1: Vinyl/Fiberglass Frame:Fixed, Perf. Type: Energy code
1200
--
-- 0.550
0.360
default, Double Pane, Clear, SHGC 0.70, [Bldg. Use 1 - Dormitory]
Window 2: Vinyl/Fiberglass Frame:Fixed, Perf. Type: Energy code
50
--
— 0.550
0.360
default, Double Pane, Clear, SHGC 0.70, [Bldg. Use 1 - Dormitory]
Door 1: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Type:
42
--
--- 0.800
0.770
Energy code default, Double Pane, Clear, SHGC 0.70, [Bldg. Use 1 -
Dormitory]
Door 2: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Type:
48
---
— 0.800
0.770
Energy code default, Double Pane, Clear, SHGC 0.70, [Bldg. Use 1 -
Dormitory]
Door 3: Glass (> 50% glazing):Metal Frame, Entrance Door, Perf. Type:
136
—
— 0.800
0.770
Energy code default, Double Pane, Clear, SHGC 0.70, [Bldg. Use 1 -
Dormitory]
Door 4: Insulated Metal, Non -Swinging, [Bldg. Use 1 - Dormitory]
63
--
-- 0.100
0.100
Door 5: Glass (> 50% glazing):Metal Frame, Non -Entrance Door, Perf.
230
—
— 0.800
0.770
Type: Energy code default, Double Pane, Clear, SHGC 0.70, [Bldg.
Use 1 - Dormitory]
Door 6: Glass (> 50% glazing):Metal Frame, Non -Entrance Door, Perf.
624
—
— 0.800
0.770
Type: Energy code default, Double Pane, Clear, SHGC 0.70, [Bldg
Use 1 - Dormitory]
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bldg2.cck Page 1 of 9
Assembly Gross Area Cavity Cont. Proposed Budget U -
or R -Value R -Value U -Factor Factor(a)
Perimeter
Basement Wall 1: Solid Concrete:6" Thickness, Light Density, Furring: 585 --- 13.0 0.065 0.108
None, Wall Ht 9.0, Depth B.G. 9.0, [Bldg. Use 1 - Dormitory]
Floor 1: Slab -On -Grade: Unheated, Horizontal with vertical 2 ft., [Bldg. 574 -- 15.0 0.690 0.520
Use 1 - Dormitory] (b)
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements.
(b) Slab -On -Grade proposed and budget U -factors shown in table are F -factors.
clone PASSES: Desinn 2%„ hatter than code
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.0.5.1 and to comply with any applicable mandatory
r quirements listed in the Inspection Checklist.
Name -Title ignature Date
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bldg2.cck Page 2 of 9
COMcheck Software Version .1
Inspection Checklist
Energy Code: 2012 IECC
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
section
#
Plan Review
Complies?
& Req.11)
- - -'
C103.2
Plans and/or specifications provide all
❑Complies
[PR111
information with which compliance
❑Does Not
can be determined for the building
❑Not Observal
envelope and document where
❑Not Applicab
exceptions to the standard are
claimed.
C 04C 6
Plans, specifications, and/or
❑Complies
[PR9]1
calculations provide all information
❑Does Not
with which compliance can be
❑Not Observal
determined for the additional energy
❑Not Applicab
efficiency package options.
C402.3.1
The vertical fenestration area <= 30
❑Complies
[PR10]1
percent of the gross above -grade wall
❑Does Not
area.
❑Not Observal
❑Not Applicab
C402.3.1
The skylight area <= 3 percent of the
❑Complies
J[PR1111
gross roof area.
❑Does Not
❑Not Observal
❑Not Applicab
C402.3.2.
Skylights in office, storage,
❑Complies
2
automotive service, manufacturing,
❑Does Not
I [PR15]1
non -refrigerated warehouse, retail
❑Not Observa
store, and distribution/sorting area
❑Not Applicab
j
have a measured haze value > 90
percent unless designed to exclude
direct sunlight.
Additional Comments/Assumptions:
1 I High Impact (Tier 1) J 2 Medium Impact (Tier 2) j 3 FLow Impact (Tier 3)
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bldg2.cck Page 3 of 9
Section
#
Footing / Foundation Inspection
i Complies?
( Comments/Assumptions
& Req.ID
---
---- -- - -
C402.2.4
Below -grade wall insulation R -value.
❑Complies
See the Envelope Assemblies table for values.
[FOl]2
[]Does Not
❑Not Observable
❑Not Applicable
C303.2
Below -grade wall insulation installed
❑Complies
I[F02]2
per manufacturer's instructions.
❑Does Not
❑Not Observable
❑Not Applicable
-- ----
C4402.2.02.2.6
Slab edge insulation R -value.
❑Complies
See the Envelope Assemblies table for values.
,[FO3]2
❑Does Not
❑Not Observable
❑Not Applicable
'FC303.2
Slab edge insulation installed per
❑Complies
j[FO4]2
manufacturer's instructions.
❑Does Not
❑Not Observable
a
❑Not Applicable
-
C402.2.6
_
Slab edge insulation depth/length.
❑Complies
See the Envelope Assemblies table for values.
j[FO5]2
Slab insulation extending away from
❑Does Not
building is covered by pavement or
❑Not Observable
>= 10 inches of soil.
❑Not Applicable
C403.2.8.
Exterior insulation protected against
❑Complies
1
damage, sunlight, moisture, wind,
❑Does Not
[FO6]1
landscaping and equipment
❑Not Observable
maintenance activities.
❑Not Applicable
C402.2.8
Bottom surface of floor structures
❑Complies
See the Envelope Assemblies table for values.
[FO12]3
incorporating radiant heating
❑Does Not
insulated to >=R-3.5.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 `High Impact (Tier 1) 2 LMedium Impact (Tier 2)- _13TLow
IImpact (Tier 3)
�._ -
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bldg2.cck Page 4 of 9
Section
#
Framing / Rough -In Inspection
Complies?
Comments/Assumptions
& Req.ID
-- - .. ---
---
C402.4.1,
- --- ---
The building envelope contains a
❑Complies
C402.4.2
continuous air barrier that is sealed in
❑Does Not
[FR16]'
an approved manner and either
❑Not Observable
j
constructed or tested in an approved
❑Not Applicable
manner. Air barrier penetrations are
IC402.4.3,
sealed in an approved manner.
❑Complies
Factory -built fenestration and doors
C402.4.4
are labeled as meeting air leakage
❑Does Not
I [FR18]3
requirements.
❑Not Observable
❑Not Applicable
C402.4.7
Vestibules are installed on all building
❑Complies
[FR17]3
entrances. Doors have self-closing
❑Does Not
i
devices.
❑Not Observable
❑Not Applicable
i C402.3.3,
Vertical fenestration U -Factor.
❑Complies
See the Envelope Assemblies table for values.
C402.3.4
❑Does Not
1[FR8]1
❑Not Observable
❑Not Applicable
i C402.3.3
Vertical fenestration SHGC value.
❑Complies
See the Envelope Assemblies table for values.
[FR10]'
❑Does Not
❑Not Observable
❑Not Applicable
C303.1.3
Fenestration products rated in
❑Complies
[FR12]2
accordance with NFRC.
❑Does Not
❑Not Observable
-
❑Not Applicable
IC303.1.3
Fenestration products are certified as
❑Complies
j[FR13]1
to performance labels or certificates
❑Does Not
provided.
❑Not Observable
i
❑Not Applicable
C402.2.7
U -factor of opaque doors associated
❑Complies
See the Envelope Assemblies table for values.
[FR14]2
with the building thermal envelope
❑Does Not
i
meets requirements.
❑Not Observable
I
j
❑Not Applicable
Additional Comments/Assumptions:
— - _ - --
`1 High Impact (Tier 1) 2 jMedium Impact (Tier 2) � 3 Low Impact (Tier 3)
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments BIdg2.cck Page 5 of 9
I Mechanical Rough -in Inspection Complies? Comments/Assumptions
& Req.ID ,
C402.4.5. Stair and elevator shaft vents have ❑Complies
1 motorized dampers that automatically ❑Does Not
I[ME3]3 close. ❑Not Observable
❑Not Applicable
C402.4.5. Outdoor air and exhaust systems have ❑Complies
2 motorized dampers that automatically ❑Does Not
[ME58]3 shut when not in use and meet ❑Not Observable
maximum leakage rates. Check
gravity dampers where allowed. ❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bidg2.cck Page 6 of 9
Section
# j
Insulation inspection
Complies?
Comments/Assumptions
& Req. ID
J
C402.4.1.
All sources of air leakage in the
❑Complies
1
building thermal envelope are sealed,
❑Does Not
i[IN1]1
caulked, gasketed, weather stripped
❑Not Observable
or wrapped with moisture vapor -
❑Not Applicable
permeable wrapping material to
minimize air leakage.
C402.4.2.
Roof R -value. For some ceiling
❑Complies See the Envelope Assemblies table for values.
1
systems, verification may need to
❑Does Not
[IN2]1
occur during Framing Inspection.
❑Not Observable
❑Not Applicable
C303.2
Roof insulation installed per
❑Complies
j [IN3]1
manufacturer's instructions. Blown or
❑Does Not
poured loose -fill insulation is installed
❑Not Observable
only where the roof slope is <=3 in
❑Not Applicable
12.
0303.2
Above -grade wall insulation installed
❑Complies
[IN7]1
per manufacturer's instructions.
❑Does Not
❑Not Observable
j
❑Not Applicable
C402.2.5
Floor insulation R -value.
❑Complies See the Envelope Assemblies table for values.
i[IN8]2
I
❑Does Not
❑Not Observable
j
❑Not Applicable
C303.1
_
Building envelope insulation is labeled
❑Complies
[IN10]2
with R -value or insulation certificate
❑Does Not
providing R -value and other relevant
❑Not Observable
data.
❑Not Applicable
C303.2.1
Exterior insulation is protected from
❑Complies
[IN14]2
damage with a protective material.
❑Does Not
Verification for exposed foundation
❑Not Observable
insulation may need to occur during
❑Not Applicable
Foundation Inspection.
C402.2.1
Insulation intended to meet the roof
❑Complies
JIN1713
insulation requirements cannot be
❑Does Not
installed on top of a suspended
❑Not Observable
ceiling. Mark this requirement
❑Not Applicable
compliant if insulation is installed
arrordinoly.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 � Low Impact (Tier 3)
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bldg2.cck Page 7 of 9
Section I
# Final Inspection I Complies?
& RegAD I
I _
C402.4.6
Weatherseals installed on all loading
❑Complies
[F137]1
dock cargo doors.
❑Does Not
❑Not Observable
❑Not Applicable
C402.4.8
Recessed luminaires in thermal
❑Complies
[FI26]3
envelope to limit infiltration and be IC
❑Does Not
rated and labeled. Seal between
❑Not Observable
interior finish and luminaire housing.
❑Not Applicable
C406
Efficient HVAC performance, efficient
❑Complies
[F13413
lighting system, or on-site supply of
❑Does Not
renewable energy consistent with
❑Not Observable
what is shown the approved plans.
❑Not Applicable
Additional Comments/Assumptions:
Comments/Assumptions
1 High Impact -Tier 1) 2 Medium Impact (Tier 2) - 3 mow Impact (Tier 3)
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments BIdg2.cck Page 8 of 9
Project Title: Mattson Apartments Building 2 Report date: 02/20/17
Data filename: C:\Users\Dwayne 15\Documents\COMcheck\mattson apartments Bldg2.cck Page 9 of 9