Loading...
HomeMy WebLinkAboutRESCHECK - 17-00203 - 1081 Washington Blvd - SFRCREScheck Software Version 4.6.2 �(J Compliance Certificate Project FS3B3 "FRAHM" Energy Code: 2012 IECC Location: Rexburg, Idaho Construction Type: Single-family Project Type: New Construction Orientation: Unspecified Conditioned Floor Area: 3,386 ft2 Glazing Area 23% Climate Zone: 6 (8693 HDD) Permit Date: Permit Number: 60 Construction Site: Owner/Agent: 1081 WASHINGTON BLVD 19 FOUNDERS SQUARE SUBD. REXBURG. ID Designer/Contractor: KARTCHNER HOMES LOGAN, UT JOHN@KARTCHNERHOMES.COM Compliance: 3.4% Better Than Code Maximum UA: 293 Your UA: 283 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home. Envelope Assemblies Ceiling 1: Flat Ceiling or Scissor Truss 1,693 50.0 0.0 0.026 44 Main Level - Front: Wood Frame, 16" o.c. 528 22.0 0.0 0.056 24 Orientation: Front Window 1: Vinyl/Fiberglass Frame:Double Pane with low -E 60 0.320 19 Orientation: Front Door 1: Solid 40 0.170 7 Orientation: Front Main Level - Right: Wood Frame, 16" o.c. 205 22.0 0.0 0.056 9 Orientation: Right side Window 9: Vinyl/Fiberglass Frame:Double Pane with Low -E 40 0.320 13 Orientation: Right side Main Level - Rear: Wood Frame, 16" o.c. 416 22.0 0.0 0.056 16 Orientation: Back Window 1: Vinyl/Fiberglass Frame:Double Pane with Low -E 120 0.320 38 Orientation: Back Door 2: Solid 15 0.150 2 Orientation: Back Main Level - Left: Wood Frame, 16" o.c. 316 22.0 0.0 0.056 16 Orientation: Left side Window 7: Vinyl/Fiberglass Frame:Double Pane with Low -E 38 0.320 12 Orientation: Left side Project Title: FS3B3 "FRAHM" Report date: 04/13/17 Data filename: C:\Users\j hoe Ilei n.MAI N\Documents\REScheck\FS3B3 - AUSTIN.rck Page 1 of 9 Basement Wall 1: Solid Concrete or Masonry 528 0.0 15.0 0.042 21 Orientation: Front Wall height: 8.0' Depth below grade: 8.0' Insulation depth: 8.0' Window 8: Vinyl/Fiberglass Frame:Double Pane with Low -E 20 0.320 6 Orientation: Front Basement Wall 2: Solid Concrete or Masonry 204 0.0 15.0 0.042 9 Orientation: Right side Wall height: 8.0' Depth below grade: 8.0' Insulation depth: 8.0' Basement Wall 3: Solid Concrete or Masonry 416 0.0 15.0 0.042 15 Orientation: Back Wall height: 8.0' Depth below grade: 8.0' Insulation depth: 8.0' Window 5: Vinyl/Fiberglass Frame:Double Pane with Low -E 60 0.320 19 Orientation: Back Basement Wall 4: Solid Concrete or Masonry 316 0.0 15.0 0.042 13 Orientation: Left side Wall height: 8.0' Depth below grade: 8.0' Insulation depth: 8.0' Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2012 IECC requirements in REScheck Version 4.6.2 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name - Title Signature Project Title: FS3133 "FRAHM" Report date: 04/13/17 Data filename: C:\Users\jhoeIlein.MAIN\Documents\REScheck\FS3B3 - AUSTIN.rck Page 2 of 9 CREScheck Software Version 4.6.2 �J( Inspection Checklist Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. becxion Plans Verlfled Field Verified ^# •^ Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions 103.1. Construction drawings and fg�, 103.2 :documentation demon! :building envelope. � A2 1031, 'Construction drawings and 1'documentation4� p'i s q,z �E, sF �Y,e,r� " 3 r • - 403.7 energy code complianc �N'•` a, ;fighting and mechanical systems. t" .,pyx"!dwelling .s `" x red` 3�*s ■ • • • . • ' units must demonstrate compliance with the IECC ,Commerciali •• Additional Comments/Assumptions: 111 High Impact (Tier 1) 12':1 Medium Impact (Tier 2) 1 3 ILow Impact (Tier 3) Project Title: FS3B3 "FRAHM" Report date: 04/13/17 Data filename: C:\Users\jhoeIlein.MAIN\Documents\REScheck\FS3B3 - AUSTIN.rck Page 3 of 9 Section # Plans Verified Foundation Inspection Value Field Verified Value Complies? Comments/Assumptions & Re .ID 402.1.1 {Conditioned basement wall R- R -❑Complies '.See the envelope assemblies (F0411 !insulation R -value. Where interior: R- ! R- ❑Does Not table for values. :Insulation is used, verification may need to occur during ;❑Not Observable I Insulation Inspection. Not ;❑Not Applicable ;required in warm -humid locations; :in Climate Zone 3. 303.2 ;Conditioned basement wall ❑Complies [F0511 !insulation installed per ❑Does Not ;manufacturer's instructions. []Not Observable I ! ❑Not Applicable 402.2.8 ;Conditioned basement wall It ft❑Complies See the Envelope Assemblies [FO611 insulation depth of burial or UDoes Not ;table for values. -;distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 IA protective covering Is Installed '.. ❑Complies [FO1111 oto protect exposed exterior ❑Does Not U� insulation and extends a ',❑Not Observable minimum of 6 in. below grade.. ;❑Not Applicable 403.8 ;Snow- and ice -melting system ;❑Complies [F01212 controls installed.❑Does Not ,4❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 2] Medium Impact (Tier 2) 1 3 1 Low Impact (Tier 3) Project Title: F53133 "FRAHM" Report date: 04/13/17 Data filename: C:\Users\jhoellein.MAIN\Documents\REScheck\F53B3 - AUSTIN.rck Page 4 of 9 Section # Framing / Rough -In Inspection Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Re .ID 402.1.1, ;Door U -factor. U- U- ❑complies j See the Envelope Assemblies 402.3.4 ❑Does Not ;table for values. [FRl]1 ;❑Not Observable ❑Not Applicable 402.1.1, ;Glazing U -factor (area -weighted U-_ U -❑Complies ;See the Envelope Assemblies 402.3.1, :average).❑Does Not ;table for values. 402.3.3, 402.3.6, ❑ Not Observable 402.5❑Not Applicable [FR211 : 303.1.3;U -factors of fenestration products❑Complies [FR411 :are determined in accordance❑Does Not ;with the NFRC test procedure or ;taken from the default table. ❑Not Observable ❑Not Applicable 402.4.1.1 ;Air barrier and thermal barrier ❑Complies [FR2311 :installed per manufacturer's❑Does Not I !Instructions.❑Not Observable ❑Not Applicable 402.4.3 (Fenestration that is not site built : j❑Complies [FR20]1 pis listed and labeled as meeting❑Does Not IAAMA /WDMA/CSA 101/I.S.2/A440❑Not j W has infiltration rates per NFRC Observable 1400 that do not exceed code❑Not Applicable ;limits. 402.4.4" ]IC -rated recessed lighting fixtures. I❑Complies [FR16F2 ;sealed at housing/interior finish ❑Does Not U ;and labeled to indicate s2.0 cfm Observable :leakage at 75 Pa.❑Not ❑Not Applicable 403.2.1 ;Supply ducts in attics are R- R -❑Complies [FR12]1 ;insulated to >_R-8. All other ducts R- R -❑Does Not ,J jin unconditioned spaces or []Not Observable I outside the building envelope are :insulated to z:R-6. ;❑Not Applicable 403.2.2 :All joints and seams of air ducts, ❑Complies [FR13]1 :air handlers, and filter boxes are ❑Does Not ;sealed. ❑Not Observable ❑Not Applicable 403.2.3 Building cavities are not used as ❑Complies [FR15]3 .ducts or plenums. ❑Does Not ❑Not Observable ❑Not Applicable 403.3 HVAC piping conveying fluids R-_ R -❑Complies [FR17]' :above 105 OF or chilled fluids❑Does Not below 55 OF are Insulated to aR- 0, 13 ;❑Not Observable j❑Not Applicable 403.3.1 Protection of insulation on HVAC - ❑Complies [FR24]1 I piping. ❑Does Not ❑Not Observable ❑Not Applicable 403.4.2 ;Hot water pipes are insulated to R-_ R-_ ;❑Complies [FR18]2 I>R-3. ❑Does Not ❑Not Observable j❑Not Applicable 111 High Impact (Tier 1) 12.1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: FS3B3 "FRAHM" Report date: 04/13/17 Data filename: CAUsers\jhoe Ilei n.MAI N\Documents\REScheck\FS3B3 - AUSTIN.rck Page 5 of 9 # Framing /Rough -In Inspection Value Plans Verified Value Field Verified Complies? Comments/Assumptions 403.5 :Automatic or gravity dampers are [FR19]2 linstalled on all outdoor air M f intakes and exhausts. Additional Comments/Assumptions: s Not Observable 1 1 High Impact (Tier 1) _. Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: FS3B3 "FRAHM" Report date: 04/13/17 Data filename: C:\Users\jhoellain.MAIN\Documents\REScheck\FS3B3 - AUSTIN.rck Page 6 of 9 Section # Insulation Inspection Plans Verified Field Verified Value Value Complies? Comments/Assumptions & Req.ID 303.1 '.. All installed insulation is labeled ❑Complies [IN13]' or the installed R-values ❑Does Not provided. ❑Not Observable ❑Not Applicable 402.1.1, ''..Wall insulation R-value. if this isa'. R- R-❑Complies ;See the Envelope Assemblies 402.2.5, I mass wall with at least 1k of the ❑ Wood, ❑ Wood❑Does Not :table for values. 402.2.6 ;wall insulation on the wall ❑ Mass '., ❑ Mass❑Not Observable [IN311 exterior, the exterior Insulation :requirement applies (FR10). i j ❑ Steel ❑ Steel ❑Not Applicable 303.2 :Wall insulation is installed per ❑Complies [IN411 :manufacturer's instructions.❑Does Not ❑Not Observable i - ;❑Not Applicable Additional Comments/Assumptions: 11 High Impact (Tier 1) r4,,j Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: FS3B3 "FRAHM" Report date: 04/13/17 Data filename: C:\Users\jhoellein.MAIN\Documents\REScheck\FS3B3 - AUSTIN.rck Page 7 of 9 Section # Final Inspection Provisions plans Verified Field Verified value Value Complies? Comments/Assumptions & Req.ID - ❑Does Not -^' - - []Does Not 402.1.1, ;Ceiling insulation R -value. R- ; R -❑Complies ;See the Envelope Assemblies 402.2.1, 1 ❑ Wood ; ❑ Wood ODoes Not ;table for values. 402.2.2, 402.2.6 - ❑Does Not ❑ Steel ❑ Steel '[]Not Observable [Fill' ;fixtures or 75% of permanent �`u;[�,t ;❑Not Applicable 403.4.1 ;Circulating service hot water ❑Complies [Fl11]2 303.1.1.1, ;Ceiling insulation installed per _ ❑Complies 303.2 :manufacturer's instructions. []Does Not [FI211 Blown insulation marked every UO 1300 W. ❑Not Observable I I,E3Not ❑Not Applicable j 402.2.3 i` Vented attics with air permeable ❑Complies [FI22]2 insulation include baffle adjacent ❑Does Not ;to soffit and eave vents that ❑Not Observable !extends over insulation. - Applicable 402.2.4 ;Attic access hatch and door ; R-_ R -_❑Complies [FI311 !insulation zR-value of the❑Does Not jadJacent assembly. :❑Not Observable ❑Not Applicable 402.4.1.2 ;Blower door test @ 50 Pa. <=5 ACH 50 =_ ACH 50 =_❑Complies [FI17]1 Tach In Climate Zones 1-2, and Does Not <=3 ach in Climate Zones 3-8.❑Not Observable '❑Not Applicable 403.2.2 ;Duct tightness test result of <=4 ; cfm/100 cfm/100❑Complies [FI4]1 :cfm/100 ft2 across the system or ft' ft'❑Does Not !<=3 cfm/100 ft2 without air❑Not ;handler @ 25 Pa. For rough -in Observable ;tests, verification may need to ;❑Not Applicable ;occur during Framing Inspection. 403.2.2.1 ;Air handler leakage designatedEUWMIII_F-Ui.a .. ❑Complies [FI2411 Iby manufacturer at <=2% of ❑Does Not ;design airflow.❑Not Observable A,...n—nie 403.1.1 Programmable thermostats ❑Complies [FI9]2 ;installed on forced airfurnaces. --3, - ❑Does Not -^' - - []Does Not ❑Not Observable HVAC equipment meet efficacy - ❑Not Applicable 403.1.2 l Heat pump thermostat installed ❑Complies [FI10]2 Ion heat pumps. - ❑Does Not ,J ❑Complies ❑Not Observable ;fixtures or 75% of permanent �`u;[�,t ❑Not Applicable j 403.4.1 ;Circulating service hot water ❑Complies [Fl11]2 '.. systems have automatic or - ❑Does Not _ ;accessible manual controls. _ .. ❑Not Observable 403.5.1 -'All mechanical ventilation system .❑Complies [FI25]1 !fans not part of tested and listed -^' - - []Does Not HVAC equipment meet efficacy - []Not Observable and air flow limits. >�_ ❑Not Applicable 404.1 '75% of lamps in permanent alll ❑Complies [FI6]1 ;fixtures or 75% of permanent �`u;[�,t - ❑Does Not ;fixtures have high efficacy lamps !Does not apply to low -voltage _� - . �'�' a ,k []Not Observable lliahtina. ; ax _ ❑Not Applicable 1 IHigh Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: FS383 "FRAHM" Report date: 04/13/17 Data filename: CAUsers\jhoellei n.MAI N\Documents\REScheck\FS3B3 - AUSTIN.rck Page 8 of 9 Section # Final Inspection Provisions Plans Verified Field Verified Value Value Complies? Coin me nts/Assumptions & Req.ID 404.1.1 :,Fuel gas lighting systems have ,❑Complies [FI23]3 '!no continuous pilot light. ]❑Does Not ❑Not Observable i❑Not Applicable 401.3 ;Compliance certificate posted. ', i❑Complies [FI7]2 i> -!❑Does Not 'J ][]Not Observable - ;❑Not Applicable 303.3 ,Manufacturer manuals for ,❑Complies [FI18]3 !mechanical and water heating ' ❑Does Not U ;systems have been provided. 1 --❑Not Observable .I❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) -J Medium Impact (Tier 2) 1 3 IlLow Impact (Tier 3) Project Title: FS3B3 "FRAHM" Report date: 04/13/17 Data filename: C:\Users\jhoellein.MAIN\Documents\REScheck\FS3B3 - AUSTIN.rck Page 9 of 9 2012 IECC Energy Efficiency Certificate Above -Grade Wall 22.00 Below -Grade Wall 15.00 Floor 0.00 Ceiling / Roof 50.00 Ductwork (unconditioned spaces): Window 0.32 Door 0.17 Heating System: Cooling System: Water Heater: Name: Date: Comments