HomeMy WebLinkAboutINSPECTION SUMMARY - 13-00293 & 00294 - Edward Jones OfficePermit
Inspection
Summary
Permit Status of (Expired) as of Report Date: 01/17/2017 8:47 am
Permit Details Permit Number: 13-00294
Edward Jones Office
526 FIRST AMERICAN CIR
Building - Commercial
Permit Issued Date: 09/20/2013
Permit Inspection Statistics
21Total Inspections Completed:
15Total Inspections Passed:
Inspection Pass Rate
71.43%
Permit Inspection History *Refer to Individual Inspection Report for more Details
09/06/2013PassQuinton OwensFooting Inspection
09/11/2013PassQuinton OwensFoundation Inspection
#4 vert bar at 24"oc. & 2 #4 horiz in top & bottom and 1 #4 in middle.
2 vent openings on north and south side (each). Flood vents required.
Inspector Comments:
10/31/2013PassBret StoddardElectrical Service Inspection
Approved to be energized for permanent power-after much discussion the
electrical service is over sized for the future space(320A), the electrical contractor
insisted upon this size for a possible x-ray machine in the future space. The
electrical distributors in town claim that there is no such thing as a 200A on one
side and a 320 on the other to provide one main service instead of two. We are
now mandating an electrical service plan for all commercial projects as the result
of this.
Inspector Comments:
11/08/2013FailQuinton OwensSheeting
11/8: finish nailing tie down straps and joint blocking to be nailed. Small sections
not nailed by back door of north side and window on north wall.
Inspector Comments:
01/06/2014PassQuinton OwensSheeting
Reinspected with framing inspection.Inspector Comments:
01/06/2014FailQuinton OwensFraming/Structure Inspection
1/6/14 Truss A07 (North side) missing some bracing (labeled different on truss
details). Some studs have almost no bearing on bottom plate due to notching.
Some nuts are barely onto anchor bolt. Foundation vent not cut open in
insulation NW corner and sides. No hour separation in crawl space (not req'd by
code - get approval of designer). Submit information on Foundation vents.
Backing needed for vertical grab bars (ADA).
Inspector Comments:
01/13/2014N/ASAUREY AMANDAPlumbing Underground Inspection
01/13/2014PassQuinton OwensInsulation Inspection
insulation good, window v factor = .29 blown fiberglass at ext. walls
2" foam board (cont) in crawl space. windows/doors sealed around perimeter.
*2 front large windows not sealed.
No 1hr rating behind shower. (not required by code) check with architect for
design.
Inspector Comments:
01/13/2014PassDon AllenPlumbing Sewer
01/13/2014N/ADon AllenRadon-Ground Inspection
Page 1 of 3
(Continued)
Permit Details Permit Number: 13-00294
Edward Jones Office
526 FIRST AMERICAN CIR
Building - Commercial
Permit Status of (Expired) as of Report Date: 01/17/2017 8:47 am
Permit
Inspection
Summary
01/13/2014PassDon AllenPlumbing Water
01/13/2014PassDon AllenPlumbing Rough-in
All good to cover the rough inInspector Comments:
01/13/2014PassDon AllenHVAC Rough-in
All good to cover the rough in
gas presser held at 20 lb on both lines
Inspector Comments:
01/16/2014PassQuinton OwensSheetrock/Drywall Inspection
drywall ok to tape (all 5/8" type x)
*front wall with large window (larger cavities above arch covered - perimeter not
sealed).
Inspector Comments:
01/18/2014PassQuinton OwensFraming/Structure Inspection
Framing reinspect, anchor bolt - main level items completed.
crawl space still requires re-inspection. (added as condition for final)
see misccondition 2.
Inspector Comments:
03/18/2014PassDon AllenPlumbing Final Inspection
all good for c/oInspector Comments:
03/18/2014PassDon AllenHVAC Final Inspection
all good for the c/oInspector Comments:
04/11/2014FailQuinton OwensBuilding Final
Anchor bolts missing on interior bearing walls in crawl space. North half of crawl
space missing vapor barrier, which now has a mold problem. Gas line pressure
regulator, not vented outside, is not mounted horizontal and upright as required.
Landscaping must be done to comply with flood plain requirements (see diagram
attached to email). Flood Elevation certificate to be done on existing construction.
Building still locked (except mech room), could not inspect inside tenant space.
Inspector Comments:
06/12/2015FailQuinton OwensCommercial Building Final
Anchor bolts still missing on interior bearing walls in crawl space.Inspector Comments:
Electrical Inspection Type
12/31/2013PassBret StoddardElectrical Rough-in
Approved for cover in south portion of building only.Inspector Comments:
04/09/2014PassBret StoddardCOM, COM-A, COM-R, and COM-T Electrical Final Inspection
Approved for a final and C.O.-Edward Jones portion, no A/C units installed, need
to strap conduits for main service, will inspect on final of next portion.
Inspector Comments:
Mechanical Inspection Type
01/13/2014PassDon AllenGas Pressure Test
pressure test good on both sides for 20 psi - see Don A. rough in inspection notesInspector Comments:
02/20/2014PassDon AllenGas Pressure Test
gas presser held at 60 lb on the east side of the meter barInspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 13-00294
Edward Jones Office
526 FIRST AMERICAN CIR
Building - Commercial
Permit Status of (Expired) as of Report Date: 01/17/2017 8:47 am
Permit
Inspection
Summary
Inspections Required
Public Works Final Inspection
Planning and Zoning Final Inspection
Sidewalk Inspection
Commercial Building Final
Page 3 of 3