HomeMy WebLinkAboutINSPECTION SUMMARY - 13-00376 - 357 S 5th W - Rexburg Storage & Site PlanPermit Inspection Summary Permit Status of (Expired) as of Report Date: 01/10/2017 1:19 pm Permit Details Permit Number: 13-00376 Rexburg Storage & Site Plan 357 South 5th West Building - Commercial Permit Issued Date: 10/11/2013 Permit Inspection Statistics 19Total Inspections Completed: 12Total Inspections Passed: Inspection Pass Rate 63.16% Permit Inspection History *Refer to Individual Inspection Report for more Details 11/25/2013PassSAUREY AMANDAElectrical Service Inspection Approved for permanent power Okay to cover as per Jane Shaw Inspector Comments: Building Inspection Type Correction: Nth bldg done 10/21 (not 10/23) with UFer installed.Inspector Comments: 10/23/2013PassQuinton OwensFooting Inspection Bldg 2 (middle): Need clearance under rebar in some places. Raise top bar on west footing (should be like footing rebar on east side). Ted verified corrections early next morning. Inspector Comments: 10/23/2013PassQuinton OwensFooting Inspection North Bldg. Monolithic slabInspector Comments: 12/19/2013FailQuinton OwensFraming/Structure Inspection 12/19/2013FailQuinton OwensFraming/Structure Inspection Building 2: Missed truss web bracing on M5 & M6.Inspector Comments: 12/23/2013PassQuinton OwensFraming/Structure Inspection Bldg 2 truss bracing doneInspector Comments: 12/31/2013PassQuinton OwensSheetrock/Drywall Inspection Bldg 2: Drywall approved: double 5/8" type x on ceilings. Walls 5/8" type x. Structural elements 1 hr rated for type VA construction. Fix: too much overhang at top step (11" tread depth min. nose to nose) Inspector Comments: 01/10/2014FailQuinton OwensFraming/Structure Inspection Nail sheathing in NE corner Stud backing needed at vertical joint (by double stud near middle of North wall). Finish nailing portal panels between overhead doors as required. Upstairs: Nail vertical joints to backing (North wall - marked with red crayon). Inspector Comments: 01/14/2014PassQuinton OwensFraming/Structure Inspection Building 1 approved. Except non-bearing walls not built yet.Inspector Comments: 01/17/2014PassTed DyeSheetrock/Drywall Inspection Drywall; North exterior wallInspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 13-00376 Rexburg Storage & Site Plan 357 South 5th West Building - Commercial Permit Status of (Expired) as of Report Date: 01/10/2017 1:19 pm Permit Inspection Summary 01/21/2014PassTed DyeSheetrock/Drywall Inspection Drywall, upstairs North building: Note; double layer on roof and single layer on the sides. Inspector Comments: 01/24/2014PassQuinton OwensSheetrock/Drywall Inspection Sheetrock, downstairs North Bldg. Other comment refers to Bldg 2Inspector Comments: 02/03/2014FailTed DyeBuilding Final Electrical wire outside hanging out. Both unit barrior wall to extend to top step. Interior electricall not completed. Both units handrail on steps missing. Inspector Comments: 03/12/2014FailTed DyeBuilding Final -Hand rail on north bldg. to low at bottom and extends to high on top story. It should level out at 34" to 38" and run parallel with floor. -Top guard rail to extend out to top step(both buildings). Inspector Comments: 04/01/2014FailTed DyeBuilding Final 04/07/2014FailTed DyeBuilding Final Electrical Inspection Type 12/18/2013PassSAUREY AMANDAElectrical Rough-in 01/14/2014PassPLL ADMINElectrical Rough-in Pass, approved for cover as per Jane ShawInspector Comments: 03/03/2014PassSAUREY AMANDACOM, COM-A, COM-R, and COM-T Electrical Final Inspection Pass, per Jane ShawInspector Comments: Inspections Required Public Works Final Inspection Planning and Zoning Final Inspection Sidewalk Inspection Building Final Building Final Page 2 of 2