HomeMy WebLinkAboutRESCHECK - 16-00579 - Gorilla Performance New Building6 COMcheck Software Version 4.0.4.1
�( Envelope Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Vertical Glazing / Wall Area:
Construction Site:
Building Area
2012 IECC
Rexburg, Idaho
6b
New Construction
5%
Owner/Agent:
Rexburg, ID 83440
Floor Area
1 -Retail : Nonresidential 11250
Designer/Contractor:
jRW & Associates
1152 Bond Ave
Rexburg, ID 83440
208-359-2309
Additional Efficiency Package
High efficiency HVAC. Systems. that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Envelope Assemblies
Assembly Gross Area Cavity Cont. Proposed Budget U.
or R -Value R -Value U -Factor Factorm
Perimeter
Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 - Retail]
11250
0.0 50.0
0.019
0.021
Exterior Wall 1: Wood -Framed, 16" o.c., [Bldg. Use 1 - Retail]
6880
21.0 0.0
0.062
0.051
Window 1: Vinyl/Fiberglass Frame:Fixed, Ped. Type: Energy code
210
--- ---
0.550
0:360
default, Double Pane with Low -E, Clear, SHGC 0.70, PF 0.50, [Bldg.
Use 1 - Retail]
Door 1: Insulated Metal, Swinging, [Bldg. Use 1 - Retail]
40
--- ---
0.091
0.370
Door 2: Other Door, Non -Swinging, [Bldg. Use 1 - Retail]
784
--- ---
0.061
0.061
Door 3: Glass (> 50%glazing):Metal Frame, Entrance Door, Ped.
126
--- ---
0.370
0.770
Specs.: Product ID tubelite, SHGC 0.60, [Bldg. Use t - Retail] (c)
Floor 1: Slab-On-Grede:Unheated, Horizontal with vertical 4 ft., [Bldg.
430
--- 10.0
0.640
0.540
Use 1 - Retail] (d)
(a) Budget 1.1 -factors are used for software baseline calculations ONLY, and are not code requirements.
(b)'Other' components require supporting documentation for proposed U -factors.
(c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(d) Slab -On -Grade proposed and budget U -factors shown in table are F -factors.
Project Title:
Data filename: Untitled.cck
Report date: 08/24/16
Page 1 of 9
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented In this document Is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.0.4.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
S`6 W4
Date
Project Title: Report date: 08/24/16
Data filename: Untitled.cck Page 2 of 9