Loading...
HomeMy WebLinkAboutRESCHECK - 16-00579 - Gorilla Performance New Building6 COMcheck Software Version 4.0.4.1 �( Envelope Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Vertical Glazing / Wall Area: Construction Site: Building Area 2012 IECC Rexburg, Idaho 6b New Construction 5% Owner/Agent: Rexburg, ID 83440 Floor Area 1 -Retail : Nonresidential 11250 Designer/Contractor: jRW & Associates 1152 Bond Ave Rexburg, ID 83440 208-359-2309 Additional Efficiency Package High efficiency HVAC. Systems. that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U. or R -Value R -Value U -Factor Factorm Perimeter Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 - Retail] 11250 0.0 50.0 0.019 0.021 Exterior Wall 1: Wood -Framed, 16" o.c., [Bldg. Use 1 - Retail] 6880 21.0 0.0 0.062 0.051 Window 1: Vinyl/Fiberglass Frame:Fixed, Ped. Type: Energy code 210 --- --- 0.550 0:360 default, Double Pane with Low -E, Clear, SHGC 0.70, PF 0.50, [Bldg. Use 1 - Retail] Door 1: Insulated Metal, Swinging, [Bldg. Use 1 - Retail] 40 --- --- 0.091 0.370 Door 2: Other Door, Non -Swinging, [Bldg. Use 1 - Retail] 784 --- --- 0.061 0.061 Door 3: Glass (> 50%glazing):Metal Frame, Entrance Door, Ped. 126 --- --- 0.370 0.770 Specs.: Product ID tubelite, SHGC 0.60, [Bldg. Use t - Retail] (c) Floor 1: Slab-On-Grede:Unheated, Horizontal with vertical 4 ft., [Bldg. 430 --- 10.0 0.640 0.540 Use 1 - Retail] (d) (a) Budget 1.1 -factors are used for software baseline calculations ONLY, and are not code requirements. (b)'Other' components require supporting documentation for proposed U -factors. (c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (d) Slab -On -Grade proposed and budget U -factors shown in table are F -factors. Project Title: Data filename: Untitled.cck Report date: 08/24/16 Page 1 of 9 Envelope Compliance Statement Compliance Statement: The proposed envelope design represented In this document Is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.4.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. S`6 W4 Date Project Title: Report date: 08/24/16 Data filename: Untitled.cck Page 2 of 9