Loading...
HomeMy WebLinkAboutCOMCHECK - 16-00628, 629 - Sawtelle Apts - 18 Plex #1Envelope Compliance Certificate Project information Energy Code: Project Title: Location: Climate Zone: Project Type: Vertical Glazing / Wall Area: Construction Site: Rexburg, ID 83440 2012 IECC 146 N 1st W 18 Plex Apt Rexburg, Idaho 6b New Construction 9% Owner/Agent: Building Area Floor Area 1 -Dormitory: Nonresidential 9026 Additional Efficiency Package Designer/Contractor: Design Intelligence LLC Rexburg, ID 83440 High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U - or R -Value R -Value U -Factor Factor(a) Perimeter Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 - Dormitory] 3042 49.0 0.0 0.021 0.021 Exterior Wall 1: Wood -Framed, 16" o.c., [Bldg. Use 1 - Dormitory] 8534 21.0 0.0 0.062 0.051 Window 1: Vinyl/Fiberglass Frame:Operable, Perf. Specs.:. Product ID 756 -- -- 0.290 - 0.430 Window, SHGC 0.70, [Bldg. Use 1 - Dormitory] (b) Door 1: Insulated Metal, Swinging, [Bldg. Use 1 - Dormitory] 380 -- -- 0.290 0.370 Floor 1: Slab-On-Grade:Unhealed, Vertical 2 ft., [Bldg. Use 1 - 336 -- 10.0 0.540 0.550 Dormitory] (c) (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. (b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation (c) Slab -On -Grade proposed and budget U -factors shown in table are F -factors. drre.pA.SSES: C7esidrr. ln.beit�rtttan rorfP Envelope Compliance Statement Compliance Statement. The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.3.0 and to comply with the mandatory requirements listed in the Inspection Checklist. Name - Title Date Project Title: 146 N 1st W 18 Plex Apt Report date: 09/01/16 Data filename: S:\losh\Year 2016\2016-120 146 N 1st West Apts\18 Plex\090116 146 N 1st W 18 Plex Apt Page 1 of 8 Comcheck.cck COMcheck Software Version 4.0.3.0 Inspection Checklist Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # -Plan Review ,Complies? Comments/Assumptions & Req:lq: ,. ... .. C103.2 : Plans and/or specifications provide all i❑Complies [PR1]1 !information with which compliance '❑Does Not can be determined for the building '.. ❑Not Observable envelope and document where exceptions to the standard are❑Not Applicable claimed. C406 Plans, specifications, and/or❑Complies [PR9]1 (calculations provide all information❑Does Not :with which compliance can be determined 'determined for the additional energy Observable efficiency package options. '..❑Not Applicable C402.31 :The vertical fenestration area <= 30 ':.❑Complies [PR10]1 'percent of the gross above -grade wall❑Does Not area. ❑Not Observable I '!❑Not Applicable 0402.3.1 The skylight area <= 3 percent of the❑Complies [PR11]1 :gross roof area. -❑Does Not -]Not Observable _ •:❑Not Applicable 0402.3.2. iSkylights in office, storage,❑Complies 2 : automotive service, manufacturing, ❑Does Not [PR15]1 non -refrigerated warehouse, retail '..store, Observable! and distribution/sorting area❑Not have a measured haze value > 90❑Not Applicable j percent unless designed to exclude ':.direct sunlight. Additional Comments/Assumptions: 1 ;High Impact (Tier 1) 2`. Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 146 N 1st W 18 Plex Apt Report date: 09/01/16 Data filename: S:\losh\Year 2016\2016-120 146 N 1st West Apts\18 Plex\090116 146 N 1st W 18 Plex Apt Page 2 of 8 Comcheck.cck section '.. # Footing I Foundation Inspection Complies? Comments)Assumptions 'Slab edge insulation R-value,❑Complies See the Envelope Assemblies table for values.�� r ❑Does Not P ❑Not Observable: 4 'I;❑Not Applicable Gab 2 j Slab edge insulation installed per I❑Complies [ S FO4j .,manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable C4Q2_2„6; =, Slab edge insulation depth/length. :-]Complies _See the Envelope Assemblies table for values. [FQ5: €.Slab insulation extending away from❑Does Not . building is covered by pavement or inches ❑Not Observable - >= 10 of soil. ❑Not Applicable C403.2.8. iExterior insulation protected against❑Complies 1 damage, sunlight, moisture, wind,❑Does Not [F06]1 landscaping and equipment []Not Observable' maintenance activities. ❑Not Applicable i C402.2.8`. Bottom surface of floor structures❑Complies •See the Envelope Assemblies table for values. [FO12]3 - incorporating radiant heating ❑Does Not insulated to >=R-3.5. ❑Not Observable' ❑Not Applicable Additional Comments/Assumptions: i 1 ;High Impact (Tier 1) '�?2ii Medium Impact (Tier 2) 3 I Low Impact (Tier 3) I Project Title: 146 N 1st W 18 Plex Apt Report date: 09/01/16 Data filename: S:�josh\Year 2016\2016-120 146 N 1st West Apts\18 Plex\090116 146 N 1st W 18 Plex Apt Page 3 of 8 Comcheck.cck section- # Framing] Rough-In Inspection Complies? Comments/Assumptions 4i fieq.ID. C402.4.1, :The building envelope contains a ❑Complies LL�� C402.4.2 continuous air barrier that is sealed in❑Does Not [FR16]1 Ian approved manner and either ❑Not Observable: (constructed or tested in an approved '..❑Not Applicable manner. Air barrier penetrations are 'sealed in an approved manner. C402 4:3, Factory-built fenestration and doors ❑Complies C402.4.4 'are labeled as meeting air leakage❑Does Not [FR18]3 -., requirements. ❑Not Observable; _❑Not Applicable C402.4.7 ':. Vestibules are installed on all building '..❑Complies [FR17]3 !entrances. Doors have self-closing❑Does Not -. devices. ❑Not Observable ❑Not Applicable C402.3.3, 'Vertical fenestration U-Factor. !❑Complies _See the Envelope Assemblies table For values. C402.3.4❑Does Not [FR811 ❑Not Observable -: ❑Not Applicable C402.3.3 :Vertical fenestration SHGC value.❑Complies see the EnvelopeAssemblies table for values. [FR10]1 ❑Does Not I❑Not Observable ❑Not Applicable 76p"3 i :`•({Fenestration products rated in ❑Complies -- ..------- - ---------- ----------- --- _._............ [Fg1.2]1 H.H, accordance with NFRC. ❑Does Not -- - ®"❑Not Observable '.. 151,❑Not Applicable C303.1.3 Fenestration products are certified as❑Complies [FR13]1 to performance labels or certificates -❑Does Not provided. I❑Not Observable :. ❑Not Applicable O..4, ,:TRU-factor ........................... of opaque doors associated ❑Complies ';See the Envelope Assemblies table for values. (Fi€141,= with the building thermal envelope❑Does Not J� ° ]meets Ali requirements. ❑Not Observable, _-- I❑Not Applicable Additional Comments/Assumptions: 11 !High Impact (Tier 1);2 1 Medium Impact (Tier 2) 3 i Low Impact (Tier 3) Project Title: 146 N 1st W 18 Plex Apt Report date: 09/01/16 Data filename: S:Vosh\Year 2016\2016-120 146 N 1st West Apts\18 Plex\090116 146 N 1st W 18 Plex Apt Page 4 of 8 Comcheck.cck C402.4.5. Stair and elevator shaft vents have❑Complies 1 .motorized dampers that automatically❑Does Not [ME3]3 close. -]Not Observable ❑Not Applicable C402,4.5. Outdoor air and exhaust systems have❑Complies 2: - :motorized dampers that automatically❑Does Not [ME58]3 •shut when not in use and meet - :maximum leakage rates. Check .(--]Not Observable: gravity dampers where allowed. ❑Not Applicable Additional Comments/Assumptions: 1 :High Impact (Tier 1) ���,!2';' Medium Impact (Tier 2)3 ILow Impact (Tier 3) Project Title: 146 N 1st W 18 Plex Apt Report date: 09/01/16 Data filename: S:Uosh\Year 2016\2016-120 146 N 1st West Apts\18 Plex\090116 146 N 1st W 18 Plex Apt Page 5 of 8 Comcheck.cck C402.4.1. All sources of air leakage in the iLlComplies 1 building thermal envelope are sealed,❑Does Not [IN111 caulked, gasketed, weather stripped '.. [IN711 or wrapped with moisture vapor - permeable wrapping material to ---❑Not Applicable '.. r minimize air leakage. ❑Not Observable '.. C402.4.2. 'Roof R -value. For some ceiling❑Complies See the Envelope Assemblies table for values. 1 _systems, verification may need to❑Does Not [IN211 occur during Framing Inspection.❑Not Observable:: _❑Not Applicable '.. 0303.2 [IN311 Roof insulation installed per manufacturer's instructions. Blown or❑Does poured loose -fill insulation is installed❑Not only where the roof slope is <=3 in X12.❑Not '. UComplies Not Observable: Applicable C303.2 (Above -grade wall insulation installed❑Complies '.. [IN711 per manufacturer's instructions. ❑Does Not r Insulation intended to meet the roof❑Complies ❑Not Observable '.. insulation requirements cannot be - -❑Not Applicable ,4'0Z;2-5J.'-M,'Floor insulation R -value. ❑Complies See the Envelope Assemblies table for values. G1N❑Does Not ❑Not Observable ❑Not Applicable O2F31 .'(Building envelope insulation is labeled❑Complies fIRK-079,­!"-`; e with R -value or insulation certificate ❑Does Not ;providing HE MRF €R R -value and other relevant❑ data Not Observable ........... .:.; .._.�. : .❑Not Applicable Exterior insulation is protected from :❑Complies damage with a protective material. ❑Does Not Verification for exposed foundation Observable: insulation may need to occur during❑Not Applicable Foundation Inspection.❑Not r Insulation intended to meet the roof❑Complies insulation requirements cannot be []Does Not installed on top of a suspended Observable; ceiling. Mark this requirement❑Not ❑Not Applicable compliant if insulation is installed Additional Comments/Assumptions: 1 High Impact (Tier 1) 2:. Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: 146 N 1st W 18 Plex Apt Report date: 09/01/16 Data filename: S:Vosh\Year 2016\2016-120 146 N 1st West Apts\18 Plex\090116 146 N 1st W 18 Plex Apt Page 6 of 8 Comcheck.cck C402.4.6 Weatherseals installed on all loading iLIComplies [FI37]1 .dock cargo doors.❑Does Not j❑Not Observable'. ❑Not Applicable C402.4.8 '..Recessed luminaires in thermal ❑Complies [FI26]3 envelope to limit infiltration and be IC ❑Does Not .rated and labeled. Seal between ❑Not Observable'. interior finish and luminaire housing. ❑Not Applicable C406 Efficient HVAC performance, efficient .❑Complies [FI34]1 .lighting system, or on-site supply of❑Does Not _renewable energy consistent with .❑Not Observable .what is shown the approved plans. i❑Not Applicable j Additional Comments/Assumptions: 1 ;High Impact (Tier 1) `,2Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: 146 N 1st W 18 Plex Apt Report date: 09/01/16 Data filename: S:�osh\Year 2016\2016-120 146 N 1st West Apts\18 Plex\090116 146 N 1st W 18 Plex Apt Page 7 of 8 Comcheck.cck Project Title: 146 N 1st W 18 Plex Apt Report date: 09/01/16 Data filename: 5:\Josh\Year 2016\2016-120 146 N 1st West Apts\18 Plex\090116 146 N 1st W 18 Plex Apt Page 8 of 8 Comcheck.cck