Loading...
HomeMy WebLinkAboutCOMPLIANCE CERTIFICATE 2 - 16-00293 - Rigby Eye Care* 16-100243 COMcheck Software Version 4.3.4 Envelope Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Vertical Glazing/ Wall Area: Construction Site: 711 Rigby Lake Drive, Unit # 3 Rigby, Idaho 83442 Building Area 20121ECC Rigby Eye Care Rigby, Idaho 6b New Construction 13% Owner/Agent: Floor Area Designer/Contractor: rvmce : Nonresidential 5394 Additional Efficiency Package Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.1. Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U. 0.051 or R -Value R -Value IU -Factor Factory.) Door: , Perf. Type: Energy code default, Double Pane with Low -E, Perimeter Tinted, SHGC 0.60, [Bldg. Use 1 -Office] 42 — — Roof: Attic Roof, Wood Joists, [Bldg. Use 1 - Office] 0.770 Door: , Pert. Type: Energy code default, Double Pane with Low -E, Floor: Wood -Framed, [Bldg. Use 1 - Office] 5394 0.0 50.0 0.019 0.021 5394 0.0 19.0 0.044 0.033 NORTH Ext. Wall: Wood -Framed, 161n. o.c., [Bldg. Use 1 - Office] Window: Wood Frame, Pert. Specs.: Product ID North Fixed, SHGC 906 22.0 2.5 0.051 0.051 0.58, [Bldg. Use 1 - Office] (b) 48 — — 0.280 0.360 Basement: Solid Concrete, Sin. Thickness, Normal Density, Furring: Wood, Wall Ht 7.5, Depth B.G. 7.0, [Bldg. Use 1 - Office] 240 11.0 6.0 0.062 0.108 EAST Ext. Wall: Wood -Framed, 161n. o.c., [Bldg. Use 1 - Office] 688 22.0 2.5 0.051 0.051 Window: Wood Frame, Perf. Specs.: Product ID East Fixed, SHGC 70 0.58, [Bldg. Use 1 - Office] (b) — — 0.280 0.360 Basement: Solid Concrete, Bin. Thickness, Normal Density, Furring: Wood, Wall Ht 7.5, Depth B.G. 7.5, [Bldg. Use 1 - Office]390 11.0 6.0 0.062 0.108 SOUTH Ext. Wall: Wood -Framed, 16in, o.c., [Bldg. Use 1 - Office] 935 Window: Wood Frame, Perf. Specs.: Product ID South Fixed, SHGC 22.0 2.5 0.051 0.051 0.58, [Bldg. Use 1 - Office] (b) 140 — — 0.280 0.360 Door: , Perf. Type: Energy code default, Double Pane with Low -E, Tinted, SHGC 0.60, [Bldg. Use 1 -Office] 42 — — 0.800 0.770 Door: , Pert. Type: Energy code default, Double Pane with Low -E, Tinted, SHGC 0.60, [Bldg. Use 1 -Off 21 — -- 0.800 0.770 Basement: Solid Concrete, Bin. Thickness, Normal Density, Furring: Wood, Wall Ht 7.5, Depth B.G. 7.0, [Bldg. Use 1 - Office] 240 11.0 6.0 0.062 0.108 Project Title: Rigby Eye Care Data filename: Report date: 04/11/16 Page 1 of 20 Assembly Gross Area Cavity Cont. Proposed Budget U - or R -Value R -Value U -Factor Factorrr Perimeter WEST Ext. Wall: Wood -Framed, 161n. o.c., [Bldg. Use 1 -Office] 623 22.0 2.5 0.051 0.051 Door: Insulated Metal, Non -Swinging, [Bldg. Use 1 - Office] 21 — — 0.280 0.280 Window: Wood Frame, Pert. Specs.: Product ID West Fixed, SHGC 80 — — 0.280 0.360 0.58, [Bldg. Use 1 - Office] (b) Basement: Solid Concrete, Bin. Thickness, Normal Density, Furring: 405 11.0 6.0 0.062 0:108 Wood, Wall Ht 7.5, Depth B.G. 7.5, [Bldg. Use 1 - Office] (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. (b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. Envelope Design better than code Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed in the Inspection Checklist. � 11 zo/(o Date Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 2 of 20 �( COMcheck Software Version 4.3.4 Interior Lighting Compliance Certificate Project Information Energy Code: Project Title: Project Type: 2012 IECC Rigby Eye Care New Construction Construction Site: Owner/Agent: 711 Rigby Lake Drive, Unit # 3 Designer/Contractor: Rigby, Idaho 83442 Additional Efficiency Package Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Wafts (ft2) Watts / ft2 1 -Office 5394 0.85 4585 Total Allowed Wafts = 4585 Proposed Interior Lighting Power A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B C D Lamps/ # of Fixture E (C X D) Fixture Fixture Watt. 1 -Office LED: ceiling can trim: LED Trim: LED PAR 11 W: Linear Fluorescent: corridor track: 2 bulb Flourescent: 48" T8 32W (Super T8): Electronic: 1 88 11 968 2 14 32 448 Track Lighting: Wattage based on 52 feet of track 0 Linear Fluorescent: lights: 4 bulb Flourescent: 48" T8 32W: Electronic: 0 0 1560 LED: wall sconce: LED Wall Mount: LED Linear Lamp 8W: 4 7 32 224 1 6 11 66 Total Proposed Wafts = 3266 compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed in the Inspection Checklist. 1-.Ja1 uim: nigoy eye care Report date: 04/11/16 Data filename: Page 3 of 20 COMcheck Software Version 4.3.4 Exterior Lighting Compliance Certificate ProJect Information Energy Code: Project Title: Project Type: Exterior Lighting Zone Construction Site: 711 Rigby Lake Drive, Unit # 3 Rigby, Idaho 83442 Allowed Exterior Lighting Power A Area/Surface Category 2012 IECC Rigby Eye Care New Construction 2 (Neighborhood business district) Owner/Agent: B Quantity Designer/Contractor: C D E Allowed Tradable Allowed Watts Watts / Wattage B X C Illuminated length of facade wall or surface 13 234 ( ) Main entry 300 ft 2.5 No 750 Other door (not main entry) 10 It of 20 Yes 200 3 It of door 20 Yes 60 Total Tradable Watts (a) = 260 Total Allowed Watts = 1010 (a) Wattage tradeoffs are only allowed between tradable areas/surfaces.Total Allowed Supplemental Watts (b) = 600 (b) A supplemental allowance equal to 600 watts may be applied toward compliance of both non4radable and tradable areas/surfaces. Proposed Exterior Lighting Power A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Illuminated lenath of facade wall or 5urface (3Q0 ft) Non tragi/ tt ae LED. Soffit Can. Recess LED Can: LED Other Fixture Unit 13W: LED: Downcast Lamp: Gooseneck LED bulb: LED A Lamp 2.5W. Main entry (10 ftof door Width),Trn/ansae LED: Entry Can: Recess LED Can: LED Other Fixture Unit 13W: LED: Entry Wall: Entry Wall Mount: LED Other Fixture Unit 6.5W: Other door (not main entry) (3 ft of door idth)Inaclable Wni LED: Soffit Can: Recess LED Can: LED Other Fixture Unit 13W: B C D E Lamps/ # of Fixture (C X D) Fixture Fixture Watt. 1 18 13 234 1 6 13 78 1 4 13 52 1 4 13 52 1 2 13 26 Total Tradable Proposed Watts = 130 Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed in the Inspection Checklist. Project Title: Rigby Eye Care Data filename: Report date: 04/11/16 Page 4 of 20 COMcheck Software Version 4.3.4 Mechanical Compliance Certificate Project Information Energy Code: 2012 IECC Project Title: Rigby Eye Care Location: Rigby, Idaho Climate Zone: 6b Project Type: New Construction Construction Site: Owner/Agent: 711 Rigby Lake Drive, Unit # 3 Designer/Contractor: Rigby, Idaho 83442 Additional Efficiency Package Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Mechanical Systems List Quantity System Type & Description 1 HVAC System (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 84 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency = 80.00% Et Cooling: 1 each - VRF Zone Fan Unit, Capacity = 50 kStu/h, Air Economizer No minimum efficiency requirement applies 1 HVAC System (Multiple -Zone): Heating: 2 each - Central Furnace, Gas, Capacity = 106 kBtu/h Proposed Efficiency = 98.00% EL Required Efficiency = 80.00% Et Cooling: 2 each - VRF Zone Fan Unit, Capacity = 60 kBtu/h, No Economizer, Economizer exception: None No minimum efficiency requirement applies 2 Water Heater: Gas Storage Water Heater, Capacity: 50 gallons, Input Rating: 75 Btu/h Proposed Efficiency: 0.85 EF, Required Efficiency: 0.58 EF Mechanical Compliance Statement Compliance statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed in the Inspection Checklist. Project Title: Rigby Eye Care Data filename: Report date: 04/11/16 Page 5 of 20 COMcheck Software Version 4.3.4 Inspection Checklist Energy Code: 2012 IECC Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # & Re .ID Plan Review Complies? ,Comments/Assumptions C103.2 [PRl11 Plans and/or specifications provide all information with which compliance [Complies ❑Does Not Requirement will be met. can be determined for the building envelope and document where ❑Not Observable exceptions to the standard are ❑Not Applicable claimed. C103.2 [PR211 Plans, specifications, and/or calculations provide all information ❑Complies ❑Does Not Requirement will be met. with which compliance can be determined for the mechanical [--]Not Observable systems and equipment and ❑Not Applicable document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. C103.2 Plans, specifications, and/or ❑Complies [PR331 calculations provide all information ❑Does Not Requirement will be met. with which compliance can be determined for the service water ❑Not Observable heating systems and equipment and []Not Applicable document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR411 calculations provide all information ❑Does Not with which compliance can be determined for the interior lighting ❑Not Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. 0103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PR8j1 calculations provide all information ❑Does Not with which compliance can be determined for the exterior lighting ❑Not Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. C406 Plans, specifications, and/or ❑Complies Requirement will be met. [PR911 calculations provide all information ❑Does Not with which compliance can be determined for the additional energy ❑Not Observable efficiency package options. ❑Not Applicable I 1 [High Impact (Tier 1) 12 1 Medium Impac]Tier2) 3 Low Impact(Tier 3) Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 6 of 20 Section # & Re .ID Plan Review Complies? Comments/Assumptions [40203.1 [PR10]1 j Vertical fenestration area �= 30 ;percent of the gross above-grade wall ❑Complies ❑Does Not Requirement will be met. I a rea. ❑Not Observable ❑Not Applicable [402.3.1 ;Skylight [PR11]1 'gross area <= 3 percent of the roof area. ❑Complies Requirement will be met. ❑Does Not ❑Not Observable ❑Not Applicable Et Areas with obstructions that block Complies direct beam sunlight on >= 1/2 of the ❑Does Not Exception: Requirement does nota I apply. roof over the enclosed area for more han 1,500 daytime hours per year ❑Not Observable between 8 am and 4 pm. ❑Not Applicable Project Title: Data filename: a.vnuff le"WNssu mptions: 1 High Impact (Tier 1) ,2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Rigby Eye Care Report date: 04/11/16 Page 7 of 20 1 High Impact (Tier 1) 2.: Medium Impact (Tier 2) 3 Low Impact (Tier 3) P ' roject Title: Rigby Eye Care Data filename: Report date: 04/11/16 Page 8 of 20 Section # Framing / Rough -in Inspection Plans Verified Value Field Verified i< Value Complies? Comments/Assumptions Reg.ID. 0402.4.1, ;The building envelope contains a = ❑Complies Requirement will be met. 0402.4.2 continuous air barrier that is i'[]Does Not [FR1611 (sealed in an approved manner and either constructed or tested [__]Not Observable in an approved manner. Air ,.. "❑Not Applicable barrier penetrations are sealed in x ,an approved manner, C402.4.3, Factory -built fenestration and � ❑Complies Requirement will be met. C402.4.4 doors are labeled as meeting air ,'�E]Does Not [FR18]3 leakage requirements. ❑Not Observable �.❑Not Applicable 0402.4.7 Vestibules are installed on all _ ,❑Complies Exception: Doors that open [FR17]3 building entrances. Doors have`,❑Does Not directly from a space =3000 self-closing devices. j❑Not Observable ft2. �!❑Not Applicable C402.3.3, Vertical fenestration U -Factor. U-_ U- ❑Complies See the Envelope Assemblies C402.3.4 ❑Does Not table for values. [FR8]1 ❑Not Observable ❑Not Applicable C402.3.3 Vertical fenestration SHGC value. SHGC:_ SHGC:_ ❑Complies See the Envelope Assemblies [FR10]1 ❑Does Not table for values. [_-]Not Observable ❑Not Applicable C303.1.3 Fenestration products rated in -EIC plies Requirement will be met. [FR12p ' accordance with NFRC. �z r ❑Does Not ' ❑Not Observable ❑Not Applicable C303.1.3 Fenestration products are " Elco mplies Requirement will be met. [FR13]1 certified as to performance labels . �. `^`"_ + ` ;, ,h❑Does Not or certificates provided.'.� ' _ rk❑Not Observable Applicable -;❑Not C402.2.7 U -factor of opaque doors U- U`_ []Complies See the Envelope Assemblies [FR14]2 '.. associated with the building E] Swinging ❑ Swinging El Does Not table for values. thermal envelope meets ❑ Nonswinging ❑ Nonswinging ❑Not Observable requirements. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) '.:2 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 9 of 20 Section # & Re .ID Plumbing Rough -4) Inspection Compll Is Comments/Assumptions C404.3 [PLS]' ;Temperature controls installed on I i service water heating systems (110 9F ❑Complies Requirement will be met. ❑Does Not jfor dwelling units and lavatories in ;Public restrooms and 90 QF for other ❑Not Observable ;occupancies.) []Not Applicable 0404.2 [PL4]3,, !Heat traps installed on non -circulating "storage water tanks. ❑Complies Requirement will be met. ❑Does Not []Not Observable ❑Not Applicable A A:4:---1 1 High Impact (Tier 1) Z Medium Impact (Tier 2) 3. Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 10 of 20 . "Ution Mechanical Rough -in #Plans Verified & Req.ID Inspection Value 0403.2.3 i HVAC equipment efficiency Efficient [ME55]2. -;verified. y'- 0402.4.5. !Stair and elevator shaft vents 1 ' have motorized dampers that [ME3]3 automatically close. 0401.4.5, Outdoor air and exhaust systems 2 have motorized dampers that [ME58]3 automatically shut when not in damage (due to sun, moisture, use and meet maximum leakage ' wind, etc.). rates. Check gravity dampers -.. Thermally ineffective panel where allowed. C403.2.5. Demand control ventilation 1 provided for spaces >500 ft2 and [ME5911 >25 people/1000 ft2 occupant density and served by systems with air side economizer, auto Requirement will be met. modulating outside air damper control, or design airflow >3,000 s❑Not Applicable fan >= 7.5 hp are driven byanical Requirement will be met. or electrical variable d drive, or driven by vane- with variable speed blades, F Requirement will be met. erate with motor demand k 0% design kW at 50% design-calcu ducts and plenums R- IME6012 insulated. Where ducts or — plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. .C403.2.8 "„ HVAC piping insulation thickness. in. [ME61]2 — Where piping is installed in or under a slab, verification may need to occur during Foundation -;Inspection. 0403.2.8 - HVAC piping insulation thickness. in. [ME61]2 ;:.' Where piping is installed in or — under a slab, verification may -: '. need to occur during Foundation Insnprtinn C403.2.8. Piping Insulation exposed to 1 weather is protected from [ME713 damage (due to sun, moisture, ❑Complies ❑Does Not wind, etc.). ..403.2.8 'ME4113 -.. Thermally ineffective panel ❑Not Applicable surfaces of sensible heating —in. ❑Complies ❑Does panels have insulation >= R-3.5. C403.3.1. Total cooling capacity without a economizers must be less than [null]0 %varMaxKBtuPerH%. I 1111911 nnpac[ I ver tl i.. 2. Medium Project Title: Rigby Eye Care Data filename: Field Verified Com II Value.,. P es? Comments/Assumptions Efficiency.— ❑Complies See the Mechanical Systems list ❑Does Not for values. ❑Not Observable ❑Not Annlirahlp uuumpues ❑Does Not Exception: Requirement does not apply. ❑Not Observable ❑Not Applicable ❑Complies ❑Does Not Exception: Requirement does not apply. ❑Not Observable ❑Not Applicable u0omplies Requirement will be met. ❑Does Not ❑Not Observable ❑Not Applicable complies Exception: Requirement Does Not does not apply. Not Observable See the Mechanical Systems list Not Applicable for values. R-- ❑Complies ❑Does Not Requirement will be met. ❑Not Observable ❑Not Applicable — in. ❑Complies ❑Does Not Requirement will be met. ❑Not Observable ❑Not Applicable —in. ❑Complies ❑Does Exception: Piping within Not HVAC equipment. []Not Observable ❑Not Applicable ❑Complies ❑Does Not Requirement will be met. ❑Not Observable s❑Not Applicable ❑Complies ❑Does Not Requirement will be met. `❑Not Observable f '❑Not Applicable ;. ;I❑Complies ' •.❑Does Not Requirement will be met. ❑Not Observable Report date: 04/11/16 Page 11 of 20 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 12 of 20 Section Mechanical Rough -In Plans Verified Field Verified & Re .111 ' '.inspection Value Value Complies? Comments/Assumptions C403.2.7 !Ducts and plenums sealed based [ME10]2 ;on static pressure and location. ❑Complies Requirement will be met. '!❑Does Not ❑Not Observable ❑Not Applicable C403.2.7. ;Ductwork operating ea a water 1.3 'column requires air leakage ❑Complies Exception: Requirement [ME111 3 testing. ❑Does Not does not apply. t?❑Not Observable =❑Not Applicable C403.2.7,' Ductwork operating >3 in. water 1.3 column requires air leakage !❑Complies Exception: Requirement [MEll] 3 testing. ❑Does Not does not apply. -:-"i❑Not Observable ❑Not Applicable C403.3.1, C403.3.1. Air economizers provided where required, meet the requirements : ❑Complies Requirement will be met. 1 for design capacity, control i❑Does Not [ME62]1 signal, ventilation controls, high- , ;'❑Not Observable limit shut-off, integrated -❑Not Applicable economizer control, and provide a means to relieve excess outside air during operation. C408.2.2. 1 Air outlets and zone terminal ' devices have means for air , !❑Complies Requirement will be met. "i❑Does [ME53]3 : balancing. Not ❑Not Observable :'-,❑Not Applicable C403.2.10' HVAC fan systems at design .1 conditions do not exceed s r ❑Complies Requirement will be met. [ME65]3 allowable fan system motor +" "• ?❑Does Not nameplate hp or fan system bhp. See the Mechanical systems list ❑Not Observable for values. ..;.A❑Not Applicable C403.4,2 [ME6611 VAV fan motors >=7.5 hp to be VSD driven by variable speed drive, ❑ Vane axial VSD ❑Complies Exception: Requirement ❑ Vane axial ❑Does does have a vane -axial fan with fan Not fan not apply. variable pitch blades, or have Other ❑ Other ❑Not Observable controls to limit fan motor ❑Not Applicable demand. C403.4z2 [ME66] VAV fan motors >=7.5 hp to be VSD driven by variable speed drive, ❑ Vane axial VSD ❑Complies Exception: Requirement El Vane axial❑Does does have a vane -axial fan with fan N Not fan notaI apply. variable pitch blades, or have Other ❑Other ❑Not Observable controls to limit fan motor ❑Not Applicable demand. C403.4.2 [ME6611 VAV fan motors >=7.5 hp to be VSD driven by variable speed drive, ❑ Vane axial VSD ❑Complies Exception: Requirement El Vane axial❑Does does have a vane -axial fan with fan N Not fan notaI apply. variable pitch blades, or have Other E] Other (--]Not Observable controls to limit fan motor ❑Not Applicable demand. C403.4.2. - 1 VAV fans have static pressure '''" sensors positioned so setpo+ ""❑Complies Requirement will be met. Not [ME67]2 <=1/3 total design pressure.. ,>;❑Does ' "^ " :;❑Not Observable ❑Not Applicable C403.4.2. 2 Reset static pressure setpoint for , DDC controlled VAV boxes . "❑Complies Requirement will be met. [ME24]1. reporting to central controller ❑Does Not based on the zones requiring the `:!❑Not Observable most pressure. !❑Not Applicable 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 12 of 20 Section Mechanical Rough -In Plans Verified Field Verified # Inspection Value Value.: Complies? Comments/Assumptions. & Req.ID` 0403.2.6 Exhaust air energy recovery on `❑Complies [ME57]1 ;systems meeting Table C403.2.6 ❑Does Not „ ❑Not Observable C403.2.11 I Unenclosed spaces that are "'r -'i❑Complies Exception: Requirement [ME71]1 'heated use only radiant heat. `.❑Does Not does not apply. '. E]Not Observable 'i ❑Not Applicable mutatnonai Comments//assumptions: 1 JHlgh Impact (Tier 1) ,2- Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 13 of 20 Sectin # Rough -In Electrical inspection Complies? Comments/Assumptions & Reg. ID C405.2.2.. (Automatic controls to shut off all ❑Complies Exception: Emergency egress lighting. 1 -i building lighting installed in all ❑Does Not [EL22]2 :;buildings. ❑Not Observable ❑Not Applicable C405.2.1. Independent lighting controls installed ❑Complies Exception: Lighting that is related to means of egress in I per approved lighting plans and all [--]Does Not stairways or corridors. [EL23]2 manual controls readily accessible and []Not Observable visible to occupants. ❑Not Applicable C405.2.1. Lighting controls installed to uniformly ❑Complies Exception: Areas with only one luminaire of less than 100 2 reduce the lighting load by at least ❑Does Not watts. [EL15]1 50%. ❑Not Observable []Not Applicable C405.2.2. Daylight zones provided with '. ❑Complies Exception: Enclosed daylight zones with two or fewer light 3 individual controls that control the ❑Does Not fixtures do not require a separate switch for general area [EL16]2 i. lights independent of general area ❑Not Observable lighting. lighting, ❑Not Applicable C405.2.3 ' Sleeping units have at least one ❑Complies Exception: Requirement does not apply. [EL17]3 - ` master switch at the main entry door ❑Does Not that controls wired luminaires and switched receptacles. ❑Not Observable []Not Applicable C405.2.2. Occupancy sensors installed in ❑Complies Exception: Automatic -on controls are allowed in corridors, 2 required spaces. ❑Does Not stairways, restrooms, primary building entrance areas and [EL18]1 ❑Not Observable lobbies, and areas where manual -on controls could impact ❑Not Applicable safety or security. 0405.2.2. Primary sidelighted areas are ❑Complies Requirement will be met. 3 equipped with required lighting ❑Does Not [EL20]1 controls. ❑Not Observable []Not Applicable C405.2.2. Enclosed spaces with daylight area ❑Complies Exception: Requirement does not apply. 3 under skylights and rooftop monitors ❑Does Not [EL21]1 are equipped with required lighting ❑Not Observable controls. []Not. Applicable C405.2.4 ' Automatic lighting controls for exterior ❑Complies Requirement will be met. [EL25]=. -:<z, lighting installed. El Does Not []Not Observable ❑Not Applicable C405.2.3 Separate lighting control devices for ❑Complies Requirement will be met. [EL4]1 specific uses installed per approved E1 Does Not lighting plans. []Not Observable ❑Not Applicable C405.3 "' Fluorescent luminaires with odd ❑Complies Exception: Requirement does not apply. [EL19]3 numbered lamp configurations that ❑Does Not are with 10 feet center to center (if ❑Not Observable recess mounted) or are within 1 foot edge to edge (if pendant or surface ❑Not Applicable mounted) shall be tandem wired. C405.4 Exit signs do not exceed 5 watts per ❑Complies Requirement will be met. [EL611 face. ❑Does Not [-]Not Observable ❑Not Applicable 1 I High Impact (Tier 1) ,2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 14 of 20 "Section # Rough -in Electrical Inspection Complies? Comments/Assumptions. & Re .ID C405.6 ! Exterior grounds lighting over 100 W ❑Complies Requirement will be met. [EL24]1 :!provides >60lm/W unless on motion ❑Does Not sensor or fixture is exempt from scope (--]Not Observable ;of code or from external LPD. ❑Not Applicable C405.2.3 iAdditional interior lighting power ❑Complies Requirement will be met. [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is []Not Observable automatically controlled and separated from general lighting. []Not Applicable Additional Comments/Assumptions: 1 I High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 13 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 15 of 20 Section Roof insulation installed per manufacturer's instructions. ❑Complies Requirement will be met. Requirement Not Requirement will be met. Blown or poured loose -fill with R -value or insulation ;t # & Re .ID' insulation Inspection Plans Verified Value Fie1d Verified Value `. Compiles? Comments/Assumptions ,. C402.4.1. 1 All sources of air leakage in the !building thermal envelope are + Requirement will be met. other relevant data.ONot ❑Complies Requirement Requirement will be met. [IN1]1 ]sealed, caulked, gasketed, ❑Not Observable ❑Not Applicable ElNot ❑Not Applicable Y' Exterior insulation is protected weather stripped or wrapped with {. `� a'�,❑Complies Exception: Exception: Requirement ;ONotObservable damage with a protective 'material. : Imoisturevapor-permeable (, does not apply. ❑Not Applicable z 1,f wrapping material to minimize air: "foundation insulation may need I' z` Observable I leakage, i to occur during Foundation - ,,;❑Not "`r?❑Not Applicable 402.4.2. Roof R -value. For some ceiling R-_ R- ❑Complies See the Envelope Assemblies [[IN2] 1 systems, verification may need to ❑ Above deck L] Above deck ❑Does Not table for values. Not occur during Framing Inspection. ❑ Metal ❑ Metal ❑Not Observable Attic E] Attic Attic ❑Not Applicable C303.2 [IN3] 1 Roof insulation installed per manufacturer's instructions. ❑Complies Requirement will be met. Requirement Not Requirement will be met. Blown or poured loose -fill with R -value or insulation ;t :w„�+t❑Does insulation is installed only where :❑Not Observable the roof slope is <=3 in 12. j. ;., +❑Not Applicable 0303.2 [IN7]1 Above -grade wall insulation❑Complies installed per manufacturer's Requirement will be met. other relevant data.ONot instructions. .!❑Does Not ❑Not Observable ❑Not Applicable ❑Not Applicable C402.2.5`'Floor insulation R -value. R- R- ❑Complies See the Envelope Assemblies [INB]z ❑ Mass ❑ Mass ❑Does Not table for values. ❑ Steel ❑ Steel ❑Not Observable ❑ Wood ❑ Wood ❑Not Applicable C303.2 Floor insulation installed per I 4,.`,c 1111+ ..,❑Complies Requirement will be met. [IN9]2 manufacturer's instructions. ��z-;, ;aODoes Not ❑Not Observable + ` {❑Not Applicable C303.1 [IN 10] Building envelope insulation is �r k labeled Complies Requirement will be met. with R -value or insulation ;t :w„�+t❑Does Not certificate providing R -value and " other relevant data.ONot Observable ❑Not Applicable 0303.2.1 Y' Exterior insulation is protected �r' {. `� a'�,❑Complies Exception: Exception: Requirement [IN14]from damage with a protective 'material. : '. does not apply. Verification for exposed z 1,f "foundation insulation may need I' z` Observable to occur during Foundation - ,,;❑Not "`r?❑Not Applicable r, Inspection.' 1 ,,, 0402.2.1 Insulation intended to meet the `❑Complies Requirement will be met. [IN17] roof insulation requirements,;❑Does `cannot Not be installed on top of a suspended ceiling. Mark this !'" ` ❑Not Observable requirement compliant if �� '`❑Not Applicable Insulation is installed accordingly. .+. MJL,vuuK — log, ltlnC3/A95ti mption s: 1 High Impact (Tier i) -.2'` Medium Impact (Tier 2) 3.. Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 16 of 20 Sections # Final Inspection & Re .ID Complies? Comments/Assumptions C402.4.6 weatherseals installed on all loading [F13711 'dock cargo doors. ❑Complies Exception: Requirement does not apply. ❑Does Not �. ❑Not Observable []Not Applicable C403.2'.4..Thermostatic controls have a 5 °F 2 ❑Complies Requirement will be met. [FI3813 ,deadband• ❑Does Not - ❑Not Observable ❑Not Applicable C403.2.4. Temperature controls have setpoint ❑Complies Requirement will be met. 2 overlap restrictions. ❑Does Not [F120]3 ❑Not Observable ❑Not Applicable C403.2.4..'. 3 Each zone equipped with setback ❑Complies Requirement will be met. controls using automatic time clock or ❑Does Not [FI39]3 programmable control system. ❑Not Observable ❑Not Applicable C403.2.4. Automatic Controls: Setback to 55°F ❑Complies Requirement will be met. 3-. _. (heat) and 85°F (cool); 7 -day clock, 2- Not ❑Does Not [F140]3 `hour occupant override, 10 -hour backup ❑Not ❑Not Applicable C408.2.5. 1 Furnished HVAC as -built drawings ❑Complies Requirement will be met. - submitted within 90 days of system ❑Does Not [F1713 'acceptance. ❑Not Observable ❑Not Applicable C303.3,C4i Furnished O&M manuals for HVAC ❑Complies Requirement will be met. D8.2.5.3 - systems within 90 days of system ❑Does Not [F]8]3 acceptance. []Not Observable ❑Not Applicable C408.2.5. An air and/or hydronic system ❑Complies Requirement will be met. 3 balancing report is provided for HVAC ❑Does Not [FI4311 systems. ❑Not Observable ❑Not Applicable C408.2.3. 2 HVAC control systems have been ❑Complies Requirement will be met. tested to ensure proper operation, ❑Does Not [FI10]1 calibration and adjustment of controls. ❑Not Observable ❑Not Applicable C404.3 [F]11]3 `: ' Public lavatory faucet water temperature <=110°F. ❑Complies Requirement will be met. ❑Does Not ❑Not Observable ❑Not Applicable C404.5 [F[45]2.. First 8 ft of outlet piping is insulated ❑Complies Requirement will be met. ,. ❑Does Not ❑Not Observable ❑Not Applicable C402.4.8 [F126]3 Recessed luminaires in thermal envelope to limit infiltration and be IC ❑Complies Requirement will be met. []Does Not rated and labeled. Seal between interior finish and luminaire housing. ❑Not Observable ❑Not Applicable C403.2.2 - [FI27]3 ' HVAC systems and equipment ❑Complies Requirement will be met. : capacity does not exceed calculated El Does Not loads. ❑Not Observable ❑Not Applicable 1 I High Impact (Tier 1) .2 1 Medium Impact (Tier 2) 3 1 Low Impact !T'_ vi Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 17 of 20 Section # Final Inspection Complies? Rea-ID Comments/Assumptions & C408.2.5. I i Furnished as -built drawings for ❑Complies Requirement will be met. electric power systems within 30 days ❑Does Not [FI16]3 jof system acceptance. ;:.. []Not Observable ❑Not Applicable C303.3,C4 Furnished O&M instructions for 08.2,5.2. 'systems and equipment to the ❑Complies Requirement will be met. ❑Does Not [FI17]3 building owner or designated representative. ❑Not Observable ❑Not Applicable C405.5.2 [FI18]1 Interior installed lamp and fixture ❑complies See the Interior Lighting fixture schedule for values. lighting power is consistent with what ❑Does Not is shown on the approved lighting plans, demonstrating proposed watts ❑Not Observable are less than or equal to allowed ❑Not Applicable watts. C405.6.2 [FI19]1 Exterior lighting power is consistent with what is shown on the approved ❑Complies See the Exterior Lighting fixture schedule for values. ❑Does Not lighting plans, demonstrating proposed watts are less than or equal ❑Not Observable to allowed watts. ❑Not Applicable C408.2.1 [FI2811 Commissioning plan developed by ❑Complies Requirement will be met. registered design professional or []Does Not approved agency. ❑Not Observable ❑Not Applicable 0408.2.4 [F12911 Preliminary commissioning report ❑Complies Requirement will be met. completed and certified by registered ❑Does Not design professional or approved agency. ❑Not Observable ❑Not Applicable C408.2.5. 4 Final commissioning report due to ❑Complies Requirement will be met. building owner within 90 days of ❑Does Not [F13011 receipt of certificate of occupancy. []Not Observable ❑Not Applicable 0408.2.3. 1 HVAC equipment has been tested to ❑Complies Requirement will be met. (FI3111 ensure proper operation. ❑Does Not ❑Not Observable ❑Not Applicable 0408.2.3. 3 Economizers have been tested to ❑Complies Requirement will be met. [FI3211 ensure proper operation. El Does Not ❑Not Observable ❑Not Applicable C408.3 [FI3311 Lighting systems have been tested to ❑Complies Requirement will be met. ensure proper calibration, adjustment, ❑Does Not programming, and operation. ❑Not Observable []Not Applicable 0408.3 [F14811 Lighting systems have been tested to ensure ❑Complies Requirement will be met. proper calibration, adjustment, El Does Not programming, and operation. []Not Observable ❑Not Applicable C406 [FI3411 Efficient HVAC performance, efficient lighting system, or on-site supply of ❑Complies Requirement will be met. ❑Does Not renewable energy consistent with what is shown the approved plans. ❑Not Observable ❑Not Applicable ......,w• �. v,,,n lcuai/MiiY1111J1IVr15� 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 18 of 20 Project Title: Rigby Eye Care Data filename: Report date: 04/11/16 Page 19 of 20 Project Title: Rigby Eye Care Report date: 04/11/16 Data filename: Page 20 of 20