HomeMy WebLinkAboutCOMPLIANCE CERTIFICATE - 16-00293 - Rigby Eye CareP""',d I&- AOZ13
COMcheck Software Version 4.3.4
Envelope Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Vertical Glazing / Wall Area:
20121ECC
Rigby Eye Care
Rigby, Idaho
6b
New Construction
10%
Construction Site: Owner/Agent: Designer/Contractor:
711 Rigby Lake Drive, Unit # 3
Rigby, Idaho 83442
Building Area Floor Area
1 -Office : Nonresidential 5394
Additional Efficiency Package
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity Cont.
R -Value R -Value
Proposed
U -Factor
Budget U.
Factor(.)
Roof: Attic Roof, Wood Joists, [Bldg. Use 1 - Office]
5394
0.0 50.0
0.019
0.021
NORTH
Ext. Wall: Wood -Framed, 161n. o.c., [Bldg. Use 1 - Office]
906
22.0 2.5
0.051
0.051
Window: Wood Frame, Perf. Specs.: Product ID North Fixed, SHGC
48
--- ___
0.280
0.360
0.58, [Bldg. Use 1 - Office] (b)
Basement: Solid Concrete, 81n. Thickness, Normal Density, Furring:
240
11.0 11.0
0.047
0.108
Wood, Wall Ht 7.5, Depth B.G. 7.0, [Bldg. Use 1 - Office]
EAST
Ext. Wall: Wood -Framed, 161n. o.c., [Bldg. Use 1 - Office]
688
22.0 2.5
0.051
0.051
Window: Wood Frame, Perf. Specs.: Product ID East Fixed, SHGC
70
--- ---
0.280
0.360
0.58, [Bldg. Use 1 - Office] (b)
Door: Insulated Metal, Non -Swinging, [Bldg. Use 1 - Office)
21
--- ---
0.280
0.280
Basement: Solid Concrete, 81n. Thickness, Normal Density, Furring:
390
11.0 11.0
0.047
0.108
Wood, Wall Ht 7.5, Depth B.G. 7.5, [Bldg. Use 1 - Office]
SOUTH
Ext. Wall: Wood -Framed, 16in. o.c., [Bldg. Use 1 - Office]
935
22.0 2.5
0.051
0.051
Window: Wood Frame, Perf. Specs.: Product ID South Fixed, SHGC
140
--- _-_
0.260
0.360
0.58, [Bldg. Use 1 - Office] (b)
Door: , Perf. Type: Energy code default, Double Pane with Low -E,
21
_-_ ---
0.800
0.770
Tinted, SHGC 0.60, (Bldg. Use 1 - Office]
Door: , Perf. Type: Energy code default, Double Pane with Low -E,
21
--- ___
0.800
0.770
Tinted, SHGC 0.60, [Bldg. Use 1 -Office]
Basement: Solid Concrete, 81n. Thickness, Normal Density, Furring:
240
11.0 11.0
0.047
0.108
Wood, Wall Ht 7.5, Depth B.G. 7.0, (Bldg. Use 1 - Office]
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 1 of 20
Assembly Gross Area Cavity Cont. Proposed Budget U.
or R -Value R -Value LI -Factor Factor(,)
Perimeter
WEST
Ext. Wall: Wood -Framed, 16in. o.c., [Bldg. Use 1 - Office]
Window: Wood Frame, Perf. Specs.: Product ID West Fixed, SHGC
0.58, [Bldg. Use 1 - Office] (b)
Basement: Solid Concrete, 81n. Thickness, Normal Density, Furring:
Wood, Wall Ht 7.5, Depth B.G. 7.5, [Bldg. Use 1 - Office]
623
22.0 2.5
0.051
0.051
32
-- ---
0.280
0.360
405
11.0 11.0
0.047
0.108
(a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements.
(b) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
Envelope PASSES: Design 7% better than code
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed
in the Inspection Checklist.
��l,C�
Name - Title SignatuM Date
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 2 of 20
6 COMcheck Software Version 4.3.4
�( Interior Lighting Compliance Certificate
Project Information
Energy Code: 2012 IECC
Project Title: Rigby Eye Care
Project Type: New Construction
Construction Site: Owner/Agent:
Designer/Contractor:
711 Rigby Lake Drive, Unit # 3
Rigby, Idaho 83442
Additional Efficiency Package
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance
calculations.
Allowed Interior Lighting Power
A
B C
D
Area Category Floor Area Allowed
Allowed Watts
(ft2) Watts / ft2
1 -Office
5394 0.85
4585
Total Allowed Watts =
4585
Proposed Interior Lighting Power
A
B C
D
E
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
Lamps/ # of
Fixture
(C X D)
Fixture Fixture
Watt.
-Office
LED: ceiling can trim: LED Trim: LED PAR 11 W:
1 88
11
968
Linear Fluorescent: corridor track: 2 bulb Flourescent: 48" T8 32W (Super T8): Electronic:
2 14
32
448
Track Lighting: Wattage based on 52 feet of track
0 0
0
1560
Linear Fluorescent: lights: 4 bulb Flourescent: 48" T8 32W: Electronic:
4 7
32
224
LED: wall sconce: LED Wall Mount: LED Linear Lamp 8W:
1 6
11
66
Total Proposed Watts =
3266
Compliance
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed
in the Inspection Checklist.
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 3 of 20
6�(
COMcheck Software Version 4.3.4
Exterior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
Exterior Lighting Zone
Construction Site:
711 Rigby Lake Drive, Unit # 3
Rigby, Idaho 83442
Allowed Exterior Lighting Power
A
Area/Surface Category
20121ECC
Rigby Eye Care
New Construction
2 (Neighborhood business district)
Owner/Agent:
B
Quantity
Designer/Contractor:
C D E
Allowed Tradable Allowed Watts
Watts / Wattage (B X C)
Illuminated length of facade wall or surface
300 ft 2.5 No
750
Main entry
10 ft of 20 Yes
200
Other door (not main entry)
3 It of door 20 Yes
60
234
Total Tradable Watts (a) =
260
6
Total Allowed Watts =
1010
Main entry (10 ft of door width): Tradable Wattage
Total Allowed Supplemental Watts (b) =
600
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A supplemental allowance equal to 600 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
A B C D E
Fixture ID : Description / Lamp I Wattage Per Lamp I Ballast Lamps/ # of Fixture (C X D)
Fixture Fixture Watt.
Illuminated length of facade wall or surface (300 ft)7 Non -tradable Wattage
LED: Soffit Can: Recess LED Can: LED Other Fixture Unit 13W:
1
18
13
234
LED: Downcast Lamp: Gooseneck LED bulb: LED A Lamp 2.5W:
1
6
13
78
Main entry (10 ft of door width): Tradable Wattage
LED: Entry Can: Recess LED Can: LED Other Fixture Unit 13W:
1
4
13
52
LED: Entry Wall: Entry Wall Mount: LED Other Fixture Unit 6.5W:
1
4
13
52
Other door (not main entry) (3 ft of door width) Tradable Wattage
LED: Soffit Can: Recess LED Can: LED Other Fixture Unit 13W:
1
2
13
26
Total Tradable
Proposed Watts =
130
Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed
in the Inspection Checklist.
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 4 of 20
�( COMcheck Software Version 4.3.4
Mechanical Compliance Certificate
Project Information
Energy Code: 2012 IECC
Project Title: Rigby Eye Care
Location: Rigby, Idaho
Climate Zone: 6b
Project Type: New Construction
Construction Site: Owner/Agent: Designer/Contractor:
711 Rigby Lake Drive, Unit # 3
Rigby, Idaho 83442
Additional Efficiency Package
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Mechanical Systems List
Quantity System Type & Description
1 HVAC System (Single Zone):
Heating: 1 each - Central Furnace, Gas, Capacity = 84 kBtu/h
Proposed Efficiency = 96.00% Et, Required Efficiency = 80.00% El
Cooling: 1 each - VRF Zone Fan Unit, Capacity = 50 kBtu/h, Air Economizer
No minimum efficiency requirement applies
1 HVAC System (Multiple -Zone):
Heating: 2 each - Central Furnace, Gas, Capacity = 106 kBtu/h
Proposed Efficiency = 98.00% El, Required Efficiency = 80.00% Et
Cooling: 2 each - VRF Zone Fan Unit, Capacity = 60 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
2 Water Heater:
Gas Storage Water Heater, Capacity: 50 gallons, Input Rating: 75 Btu/h
Proposed Efficiency: 0.85 EF, Required Efficiency: 0.53 EF
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.3.4 and to comply with the mandatory requirements listed
in the Inspection Checklist.
Project Title: Rigby Eye Care
Data filename:
Report date: 08/16/16
Page 5 of 20
COMcheck Software Version 4.3.4
Inspection Checklist
Energy Code: 2012 IECC
Requirements: 98.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
#
Plan Review
Complies?
Comments/Assumptions
& Re .ID
C103.2
Plans and/or specifications provide all
❑Complies
Requirement will be met.
[PR111
information with which compliance
❑Does Not
can be determined for the building
❑Not Observable
envelope and document where
❑Not Applicable
exceptions to the standard are
PP
claimed.
C103.2
Plans, specifications, and/or
❑Complies
Requirement will be met.
[PR211
calculations provide all information
❑Does Not
with which compliance can be
❑Not Observable
determined for the mechanical
❑Not Applicable
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
C103.2
Plans, specifications, and/or
❑Complies
Requirement will be met.
[PR311
calculations provide all information
❑Does Not
with which compliance can be
[)Not Observable
determined for the service water
❑Not Applicable
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
C103.2
Plans, specifications, and/or
❑Complies
Requirement will be met.
[PR411
calculations provide all information
El Does Not
with which compliance can be
❑Not Observable
determined for the interior lighting
❑Not Applicable
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
0103.2
Plans, specifications, and/or
❑Complies
Requirement will be met.
[PR8j1
calculations provide all information
❑Does Not
with which compliance can be
[]Not Observable
determined for the exterior lighting
❑Not Applicable
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
C406
Plans, specifications, and/or
❑Complies
Requirement will be met.
[PR911
calculations provide all information
❑Does Not
with which compliance can be
❑Not Observable
determined for the additional energy
❑Not Applicable
efficiency package options.
1 JHigh Impact (Tier 1) Medium Impact (Tier 2) 13: Low Impact (Tier 3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 6 of 20
$action
#
Plan Review
Complies?
Comments/Assumptions
& Re .ID
C402.3.1
The vertical fenestration area <= 30
❑Complies
Requirement will be met.
[PRSO]1
percent of the gross above -grade wall
❑Does Not
area.
❑Not Observable
❑Not Applicable
C402.3.1
The skylight area <= 3 percent of the
❑Complies
Requirement will be met.
[PRll]1
'gross roof area.
❑Does Not
[]Not Observable
❑Not Applicable
C402.3.2.
Skylights in office, storage,
❑Complies
Exception: Requirement does not apply.
2
automotive service, manufacturing,
[]Does Not
[PR15]1
non -refrigerated warehouse, retail
❑Not Observable
store, and distribution/sorting area
❑Not
have a measured haze value > 90
Applicable
percent unless designed to exclude
direct sunlight.
Additional Comments/Assumptions:
1 IHigh Impact (Tier 1) -'' Medium Impact (Tier 2) 15I Low Impact (Tier 3)
Project Title: Rigby Eye Care
Data filename:
Report date: 08/16/16
Page 7 of 20
Section
#
Footing / Foundation Inspection
Complies?
Comments/Assumptions
& Re .ID
C402.2.4
Below -grade wall insulation R -value.
❑Complies
See the Envelope Assemblies table for values.
IF0112
❑Does Not
❑Not Observable
[]Not Applicable
C303.2
Below -grade wall insulation installed
[]Complies
Requirement will be met.
[FO2]2
per manufacturer's instructions.
[]Does Not
❑Not Observable
❑Not Applicable
0403.2.8.
Exterior insulation protected against
❑Complies
1
damage, sunlight, moisture, wind,
❑Does Not
[FO611
landscaping and equipment
❑Not Observable
maintenance activities.
❑Not Applicable
C403.2.4.
Freeze protection and snow/ice
❑Complies
Exception: Requirement does not apply.
5
melting system sensors for future
❑Does Not
[FO9]3
connection to controls.
❑Not Observable
[]Not Applicable
C402.2.8
Bottom surface of floor structures
[]Complies
Exception: Requirement does not apply.
[FO12]3
incorporating radiant heating
❑Does Not
insulated to >=R-3.5.
❑Not Observable
See the Envelope Assemblies table for values.
❑Not Applicable
Additional Comments/Assumptions:
1 JHigh Impact (Tier 1) 1 2 1 Medium Impact (Tier 2) 3 1 Low:lm3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 8 of 20
Section
#
Framing / Rough -In Inspection
Complies?
Comments/Assumptions
& Req.ID
C402.4.1,
The building envelope contains a
❑Complies
Requirement will be met.
C402.4.2
continuous air barrier that is sealed In
❑Does Not
[FR16]1
an approved manner and either
❑Not Observable
constructed or tested in an approved
manner. Air barrier penetrations are
❑Not Applicable
sealed in an approved manner.
C402.4.3,
Factory -built fenestration and doors
❑Complies
Requirement will be met.
C402.4.4
are labeled as meeting air leakage
❑Does Not
[FR18]3
requirements.
❑Not Observable
❑Not Applicable
C402.4.7
Vestibules are installed on all building
❑Complies
Exception: Doors that open directly from a space =3000 ft2.
[FR17]3
entrances. Doors have self-closing
❑Does Not
devices.
❑Not Observable
❑Not Applicable
C402.3.3,
Vertical fenestration U -Factor.
❑Complies
See the Envelope Assemblies table for values.
C402.3.4
❑Does Not
[FR8]1
❑Not Observable
❑Not Applicable
C402.3.3
Vertical fenestration SHGC value.
❑Complies
See the Envelope Assemblies table for values.
[FR10]1
❑Does Not
❑Not Observable
❑Not Applicable
C303.1.3
Fenestration products rated in
❑Complies
Requirement will be met.
[FR12]2
accordance with NFRC.
❑Does Not
❑Not Observable
❑Not Applicable
C303.1.3
Fenestration products are certified as
❑Complies
Requirement will be met.
[FR13]1
to performance labels or certificates
❑Does Not
provided.
❑Not Observable
❑Not Applicable
0402.2.7
U -factor of opaque doors associated
❑Complies
See the Envelope Assemblies table for values.
[FR14]'
with the building thermal envelope
❑Does Not
meets requirements.
[]Not Observable
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact (Tier 1)#4 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 9 of 20
#Plumbing
Rough -In Inspection
Complies?
Comments/Assumptions
& Req. IDI
I
- -
C404.3'Temperature
controls installed on
[]Complies Requirement will be met.
[PL5]3
service water heating systems (110 F
❑Does Not
for dwelling units and lavatories In
public restrooms and 90 F for other
❑Not Observable
❑Not Applicable
occupancies.)
C404.2
- Heat traps installed on non -circulating
❑Complies Requirement will be met.
[PL4]3
storage water tanks.
❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 JHIgh Impact (Tier 1) e -1l Medium Impact (Tier 2) 13 ILow Impact (Tier 3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 10 of 20
,Section
-
#
Mechanical Rough -In Inspection
Complies?
Comments/Assumptions
& Reci.ID
C403.2.3
HVAC equipment efficiency verified.
❑Complies
See the Mechanical Systems list for values.
[ME55]2
❑Does Not
❑Not Observable
❑Not Applicable
C402.4.5.
Stair and elevator shaft vents have
❑Complies
Exception: Requirement does not apply.
1
motorized dampers that automatically
❑Does Not
[ME313
close.
[]Not Observable
❑Not Applicable
C402.4.5.
Outdoor air and exhaust systems have
❑Complies
Exception: Requirement does not apply.
2
motorized dampers that automatically
❑Does Not
[ME58]3
shut when not in use and meet
❑Not Observable
maximum leakage rates. Check
gravity dampers where allowed.
❑Not Applicable
C403.2.5.
Demand control ventilation provided
❑Complies
Requirement will be met.
1
for spaces >500 sq.ft. and >25
❑Does Not
[ME59]1
people/1000 sq.ft, occupant density
❑Not Observable
and served by systems with air side
❑Not Applicable
economizer, auto modulating outside
air damper control, or design airflow
>3,000 cfm.
C403.4.2
VAV fan >= 7.5 hp are driven by
❑Complies
Exception: Requirement does not apply.
[ME75)2
mechanical or electrical variable
❑Does Not
speed drive, or driven by vane -axial
with variable speed blades, or operate
❑Not Observable
See the Mechanical Systems list for values.
with motor demand <=30% design
❑Not Applicable
kW at 50% design flow - calculations
required
C403.2.7
HVAC ducts and plenums insulated.
❑Complies
Requirement will be met.
[ME60]'
Where ducts or plenums are installed
❑Does Not
in or under a slab, verification may
❑Not Observable
need to occur during Foundation
❑Not Applicable
_
Inspection.
C403.2.8
HVAC piping insulation thickness.
❑Complies
Requirement will be met.
[ME61]2
Where piping is installed in or under a
❑Does Not
slab, verification may need to occur
❑Not Observable
during Foundation Inspection.
❑Not Applicable
C403.2.8
HVAC piping Insulation thickness.
❑Complies
Exception: Piping within HVAC equipment.
[ME61]2
Where piping is installed in or under a
❑Does Not
slab, verification may need to occur
❑Not Observable
during Foundation Inspection.
❑Not Applicable
C403.2.8.
Piping Insulation exposed to weather
❑Complies
Requirement will be met.
1
is protected from damage (due to sun,
❑Does Not
[ME7]3
moisture, wind, etc.).
❑Not Observable
❑Not Applicable
C403.2.8
Thermally ineffective panel surfaces of
❑Complies
Requirement will be met.
[ME41]3
sensible heating panels have
❑Does Not
insulation >= R-3.5.
❑Not Observable
❑Not Applicable
C403.3.1.
Total cooling capacity without
❑Complies
Requirement will be met.
a
economizers must be less than
❑Does Not
[NA]°
%varMaxKBtu PerH%.
❑Not Observable
❑Not Applicable
C403.2.7
Ducts and plenums sealed based on
❑Complies
Requirement will be met.
[ME10]'
static pressure and location.
❑Does Not
❑Not Observable
❑Not Applicable
11 High Impact (Tier 1) 1 u.`_ Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 11 of 20
Section
#
Mechanical Rough -In Inspection
Compiles?
Comments/Assumptions
& Re .ID
C403.2.7.
Ductwork operating >3 in. water
❑Complies
Exception: Requirement does not apply.
1.3
- column requires air leakage testing.
❑Does Not
[MEll]3
❑Not Observable
❑Not Applicable
C403.2.7.
Ductwork operating >3 in. water
[Complies
Exception: Requirement does not apply.
1.3
column requires air leakage testing.
❑Does Not
[ME11]3
[]Not Observable
❑Not Applicable
C403.3.1,
Air economizers provided where
❑Complies
Requirement will be met.
C403.3.1.
required, meet the requirements for
❑Does Not
1design
[ME62]1
capacity, control signal,
ventilation controls, high -limit shut-off,
❑Not Observable
integrated economizer control, and
❑Not Applicable
provide a means to relieve excess
outside air during operation.
C408.2.2.
Air outlets and zone terminal devices
❑Complies
Requirement will be met.
1
have means for air balancing.
[]Does Not
[ME53]3
❑Not Observable
❑Not Applicable
C403.2.10
HVAC fan systems at design
❑Complies
Requirement will be met.
.1
conditions do not exceed allowable
❑Does Not
[ME65]3
fan system motor nameplate hp or fan
❑Not Observable
See the Mechanical Systems list for values.
system bhp.
❑Not Applicable
C403.4.2
VAV fan motors >=7.5 hp to be driven
❑Complies
Exception: Requirement does not apply.
[ME66]2
by variable speed drive, have a vane-
[]Does Not
axial fan with variable pitch blades, or
❑Not Observable
have controls to limit fan motor
[]Not Applicable
demand.
C403.4.2
VAV fan motors >=7.5 hp to be driven
❑Complies
Exception: Requirement does not apply.
[ME66]2
by variable speed drive, have a vane-
❑Does Not
axial fan with variable pitch blades, or
[]Not Observable
have controls to limit fan motor
❑Not Applicable
demand.
C403.4.2
VAV fan motors >=7.5 hp to be driven
[]Complies
Exception: Requirement does not apply.
[ME66]2
by variable speed drive, have a vane-
❑Does Not
axial fan with variable pitch blades, or
❑Not Observable
have controls to limit fan motor
[]Not Applicable
demand.
C403.4.2.
VAV fans have static pressure sensors
❑Complies
Requirement will be met.
1
positioned so setpoint <=1/3 total
❑Does Not
[ME67]2
design pressure.
❑Not Observable
❑Not Applicable
C403.4.2.
Reset static pressure setpoint for DDC
❑Complies
Requirement will be met.
2
controlled VAV boxes reporting to
❑Does Not
[ME24]2
central controller based on the zones
[]Not Observable
requiring the most pressure.
❑Not Applicable
C403.2.6
Exhaust air energy recovery on
❑Complies
[ME57]1
systems meeting Table C403.2.6
❑Does Not
❑Not Observable
[]Not Applicable
C403.2.11
Unenclosed spaces that are heated
❑Complies
Exception: Requirement does not apply.
[ME71]2
use only radiant heat.
❑Does Not
❑Not Observable
[:]Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) '.3. Low Impact(Tier 3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 12 of 20
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13,.. Low Impact (Tier 3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 13 of 20
Section
#
Rough -In Electrical Inspection
Complies?
Comments/Assumptions '
& Req.ID
C405.2.2.
Automatic controls to shut off all
❑Complies
Exception: Emergency egress lighting.
1
building lighting Installed in all
[]Does Not
[EL2212
buildings.
[]Not Observable
❑Not Applicable
C405.2.1.
Independent lighting controls installed
❑Complies
Exception: Lighting that is related to means of egress in
1
per approved lighting plans and all
[]Does Not
stairways or corridors.
[EL23]2
manual controls readily accessible and
[]Not Observable
visible to occupants.
[]Not Applicable
0405.2.1.
Lighting controls installed to uniformly
❑Complies
Exception: Areas with only one luminaire of less than 100
2
reduce the lighting load by at least
❑Does Not
watts.
[EL15]1
50%.
❑Not Observable
❑Not Applicable
C405.2.2.
Daylight zones provided with
❑Complies
Exception: Enclosed daylight zones with two or fewer light
3
individual controls that control the
❑Does Not
fixtures do not require a separate switch for general area
[EL16]1
lights Independent of general area
[-]Not Observable
lighting.
lighting.
❑Not Applicable
C405.2.3
Sleeping units have at least one
❑Complies
Exception: Requirement does not apply.
[EL17]3
master switch at the main entry door
❑Does Not
that controls wired luminaires and
❑Not Observable
switched receptacles.
❑Not Applicable
C405.2.2.
Occupancy sensors installed in
❑Complies
Exception: Automatic -on controls are allowed in corridors,
2
required spaces.
❑Does Not
stairways, restrooms, primary building entrance areas and
[EI -1811
❑Not Obseryable
lobbies, and areas where manual -on controls could impact
safety or security.
❑Not Applicable
0405.2.2.
Primary sidelighted areas are
❑Complies
Requirement will be met.
3
equipped with required lighting
❑Does Not
[EL20]1
controls.
❑Not Observable
❑Not Applicable
0405.2.2.
Enclosed spaces with daylight area
❑Complies
Exception: Requirement does not apply.
3
under skylights and rooftop monitors
❑Does Not
[EL2111
are equipped with required lighting
❑Not Observable
controls.
❑Not Applicable
Automatic lighting controls for exterior
❑Complies
Requirement will be met.
lighting installed.
❑Does Not
r
❑Not Observable
a
❑Not Applicable
C405.2.3
Separate lighting control devices for
❑Complies
Requirement will be met.
[EL4]1
specific uses installed per approved
❑Does Not
lighting plans.
❑Not Observable
❑Not Applicable
C405.3
Fluorescent luminaires with odd
❑Complies
Exception: Requirement does not apply.
[EL19]3
numbered lamp configurations that
❑Does Not
are within 10 feet center to center (if
❑Not Observable
recess mounted) or are within 1 foot
❑Not Applicable
edge to edge (if pendant or surface
mounted) shall be tandem wired.
C405.4
Exit signs do not exceed 5 watts per
❑Complies
Requirement will be met.
[EL6]1
face,
❑Does Not
❑Not Observable
❑Not Applicable
1 High Impact (Tier 1) 2. Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 14 of 20
# I Rough -in Electrical Inspection I Compiles?
Comments/Assumptions
C405.6
Exterior grounds lighting over 100 W
❑Complies Requirement will be met.
[EL24]1
provides >60 Im/W unless on motion
❑Does Not
sensor or fixture is exempt from scope
of code or from external LPD.
[]Not Observable
❑Not Applicable
C405.2.3
,Additional interior lighting power
❑Complies Requirement will be met.
[EL8]1
allowed for special functions per the
❑Does Not
approved lighting plans and is
automatically controlled and
[-]Not Observable
separated from general lighting.
❑Not Applicable
Additional Comments/Assumptions:
1 JlHigh Impact (Tier 1) ",,,I Medium Impact (Tier 2) iii Low Impact (Tier 3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 15 of 20
Section
#
Insulation Inspection 7
Complles7
Comments/Assumptions
& Re .ID
C402.4.1.
All sources of air leakage in the
❑Complies
Requirement will be met.
1
building thermal envelope are sealed,
❑Does Not
[IN111
caulked, gasketed, weather stripped
[]Not Observable
or wrapped with moisture vapor-
❑Not Applicable
permeable wrapping material to
minimize air leakage.
C402.4.2.
Roof R -value. For some ceiling
❑Complies
See the Envelope Assemblies table for values.
1
systems, verification may need to
[]Does Not
[IN2]1
occur during Framing Inspection.
[]Not Observable
❑Not Applicable
C303.2
Roof insulation installed per
❑Complies
Requirement will be met.
[IN3)1
manufacturer's instructions. Blown or
❑Does Not
poured loose -fill insulation is installed
❑Not Observable
only where the roof slope is <=3 in
❑Not Applicable
12.
C303.2
Above -grade wall insulation Installed
❑Complies
Requirement will be met.
[IN711
per manufacturer's instructions.
❑Does Not
❑Not Observable
❑Not Applicable
C303.1
Building envelope insulation is labeled
❑Complies
Requirement will be met.
[IN1012
with R -value or insulation certificate
❑Does Not
providing R -value and other relevant
❑Not Observable
data.
❑Not Applicable
C303.2.1
Exterior insulation is protected from
❑Complies
Exception: Requirement does not apply.
[IN14)2
damage with a protective material.
❑Does Not
Verification for exposed foundation
[]Not Observable
insulation may need to occur during
❑Not Applicable
Foundation Inspection.
C402.2.1
Insulation intended to meet the roof
❑Complies
Requirement will be met.
[IN1713
insulation requirements cannot be
❑Does Not
installed on top of a suspended
❑Not Observable
ceiling. Mark this requirement
compliant If insulation is installed
❑Not Applicable
accordingly.
Additional Comments/Assumptions:
1 JHIgh Impact (Tier 1) 2 1 Medium Impact (Tier 2) 13. Low Impact (Tier 3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 16 of 20
Section
#.
Final Inspection
Complles7
Comments/Assumptions
& Req.ID
C402.4.6
'', weatherseals installed on all loading
❑Complies
Exception: Requirement does not apply.
[FI37]1
'.dock cargo doors.
❑Does Not
❑Not Observable
❑Not Applicable
0403.2.4.
Heating and cooling to each zone is
❑Complies
Requirement will be met.
1
controlled by a thermostat control.
[]Does Not
[FI47]3
Minimum one humidity control device
❑Not Observable
per installed
humidification/dehumidification
[]Not Applicable
system.
C403.2.4.
Heating and cooling to each zone is
❑Complies
Requirement will be met.
1
controlled by a thermostat control.
❑Does Not
[FI4713
Minimum one humidity control device
[:]Not Observable
per Installed
humidification/dehumidification
❑Not Applicable
system.
C403.2.4.
Thermostatic controls have a 5 OF
❑complies
Requirement will be met.
2
deadband.
❑Does Not
[FI3813
❑Not Observable
[]Not Applicable
C403.2.4.
Temperature controls have setpoint
❑Complies
Requirement will be met.
2
overlap restrictions.
❑Does Not
[F12013
❑Not Observable
❑Not Applicable
0403.2.4.
Each zone equipped with setback
❑Complies
Requirement will be met.
3
controls using automatic time clock or
❑Does Not
[FI3913
programmable control system.
❑Not Observable
❑Not Applicable
C403.2.4.
Automatic Controls: Setback to 55°F
❑Complies
Requirement will be met.
3.
(heat) and 85°F (cool); 7 -day clock, 2-
❑Does Not
(F140]3
hour occupant override, 10 -hour
❑Not Observable
backup
❑Not Applicable
C408.2.5.
Furnished HVAC as -built drawings
❑Complies
Requirement will be met.
1
submitted within 90 days of system
[]Does Not
[FI7]3
acceptance.
❑Not Observable
❑Not Applicable
C303.3,
Furnished O&M manuals for HVAC
❑Complies
Requirement will be met.
C408.2.5.
systems within 90 days of system
❑Does Not
3
[F18]3
acceptance.
❑Not Observable
❑Not Applicable
C408.2.5.
An air and/or hydronic system
❑Complies
Requirement will be met.
3
balancing report is provided for HVAC
❑Does Not
[FI4311
systems.
❑Not Observable
❑Not Applicable
C408.2.3.
HVAC control systems have been
❑Complies
Requirement will be met.
2
tested to ensure proper operation,
❑Does Not
(FI1011
calibration and adjustment of controls.
❑Not Observable
❑Not Applicable
C404.3
Public lavatory faucet water
❑Complies
Requirement will be met.
[FIJI]3
temperature <=110°F.
❑Does Not
❑Not Observable
❑Not Applicable
1 JHIgh Impact (Tier 1) 't .y:. Medium Impact (Tier 2) 3.1 Low Impact (Tier 3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 17 of 20
Section
#
Final Inspection
Complies?
Comments/Assumptions
& Req.ID
C404.5
First 8 It of outlet piping is insulated
❑Complies
Requirement will be met.
[FI45]2
❑Does Not
❑Not Observable
❑Not Applicable
C402.4.8
Recessed luminaires in thermal
❑Complies
Requirement will be met.
[FI26]3
envelope to limit infiltration and be IC
❑Does Not
rated and labeled. Seal between
❑Not Observable
interior finish and luminaire housing.
❑Not Applicable
C403.2.2
HVAC systems and equipment
[Complies
Requirement will be met.
[F12713
capacity does not exceed calculated
❑Does Not
loads.
❑Not Observable
❑Not Applicable
C408.2.5.
Furnished as -built drawings for
❑Complies
Requirement will be met.
1
electric power systems within 30 days
❑Does Not
[FI16]3
of system acceptance.
❑Not Observable
❑Not Applicable
C303.3,
Furnished 0&M instructions for
❑Complies
Requirement will be met.
C408.2.5.
systems and equipment to the
❑Does Not
2
building owner or designated
❑Not Observable
(FI17]3
representative.
❑Not Applicable
C405.5.2
Interior Installed lamp and fixture
❑Complies
See the Interior Lighting fixture schedule for values.
(FI18]1
lighting power is consistent with what
❑Does Not
is shown on the approved lighting
❑Not Observable
plans, demonstrating proposed watts
❑Not Applicable
are less than or equal to allowed
watts.
C405.6.2
Exterior lighting power is consistent
❑Complies
See the Interior Lighting fixture schedule for values.
[FI19)1
with what is shown on the approved
❑Does Not
lighting plans, demonstrating
❑Not Observable
proposed watts are less than or equal
❑Not Applicable
to allowed watts.
C408.2.1
Commissioning plan developed by
❑Complies
Requirement will be met.
[FI2811
registered design professional or
❑Does Not
approved agency.
❑Not Observable
❑Not Applicable
C408.2.4
Preliminary commissioning report
❑Complies
Requirement will be met.
[F12911
completed and certified by registered
❑Does Not
design professional or approved
[-]Not Observable
agency.
❑Not Applicable
0408.2.5.
Final commissioning report due to
❑Complies
Requirement will be met.
4
building owner within 90 days of
❑Does Not
[F13011
receipt of certificate of occupancy.
❑Not Observable
❑Not Applicable
C408.2.3.
HVAC equipment has been tested to
❑Complies
Requirement will be met.
1
ensure proper operation.
❑Does Not
[FI3111
[]Not Observable
❑Not Applicable
C408.2.3.
Economizers have been tested to
[Complies
Requirement will be met.
3
ensure proper operation.
❑Does Not
[FI32]1
❑Not Observable
❑Not Applicable
111 High Impact (Tier 1) i�t>, Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 18 of 20
a
Section
#
Final Inspection
Complies?
Comments/Assumptions
A Re .ID
C408.3
Lighting systems have been tested to
❑Complies
Requirement will be met.
IFI33]1
ensure proper calibration, adjustment,
❑Does Not
. programming, and operation.
❑Not Observable
❑Not Applicable
C408.3
Lighting systems have been tested to
❑Complies
Requirement will be met.
[FI4811
ensure proper calibration, adjustment,
❑Does Not
programming, and operation.
❑Not Observable
❑Not Applicable
C406
Efficient HVAC performance, efficient
❑Complies
Requirement will be met.
[FI3411
lighting system, or on-site supply of
❑Does Not
renewable energy consistent with
❑Not Observable
what is shown the approved plans.
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)r.J Medium Impact (Tier 2) -3 Low Impact (Tier 3)
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 19 of 20
Project Title: Rigby Eye Care Report date: 08/16/16
Data filename: Page 20 of 20