Report Recommendations are Limited and Subject to Misinterpretation
There is a possibility that conditions may exist that could not be identified within the scope of the
investigation or that were not apparent during our site investigation. Findings of this report are limited
to data collected from noted explorations advanced and do not account for unidentified fill zones,
unsuitable soil types or conditions, and variability in soil moisture and groundwater conditions. To avoid
possible misinterpretations of findings, conclusions, and implications of this report, NES should be
retained to explain the report contents to other design professionals as well as construction
professionals.
Since actual subsurface conditions on the site can only be verified by earthwork, note that construction
recommendations are based on general assumptions from selective observations and selective field
exploratory sampling. During construction, such conditions may be identified that require corrective
actions, and these required corrective actions may impact the project budget. Therefore, construction
recommendations in this report should be considered preliminary, and NES should be retained to
observe actual subsurface conditions during earthwork construction activities to provide additional
construction recommendations as needed.
If you have any questions please contact me at (208) 932-2720.
Respectfully,
Chris A. Park, P.E.
NORTHWEST ENGINEERING SERVICES, P.C.
1680 Woodruff Park
Idaho Falls, ID 83401
Reviewed By: DBS
Northwest Engineering Services
Idaho Falls, ID • Bend, OR • Salmon, ID 5 of 5
Northwest Engineering Services, P.C.
July 18, 2016
TASK ORDER — JOHNSON RESIDENCE IN REXBURG, ID
AN ATTACHMENT TO THE AGREEMENT BETWEEN
JSM CONSTRUCTION
AND
NORTHWEST ENGINEERING SERVICES, P.C.
General Services
ARTICLE 1: ASSIGNMENT OF TASK ORDER
JSM CONSTRUCTION hereby assigns this task order to NORTHWEST ENGINEERING SERVICES, P.C. (NES)
for which the work included in this task order applies. Coordination for the execution of this task order
shall be with Mr. Jonathan McMullen who will act as the managing entity for this task order.
ARTICLE 2: SCOPE OF WORK
Upon authorization to proceed, Northwest will prepare a limited geotechnical evaluation of onsite soils
via previously excavated foundation footprint for the proposed Johnson Residence located at 505 S Mill
Hollow in Rexburg, ID. The scope will include the following services:
■ Onsite evaluation of excavated footprint area for general foundation suitability
• Limited geotechnical report including visual soils classification, visual slope stability
recommendations, and soil foundation recommendations
ARTICLE 3: COMPENSATION
A. Project Budget
The work described under the Scope of Work for this task order will be performed for a lump sum of
$620.00. Additional scope items will be completed on a time -and -materials not -to -exceed basis in
accordance with the NES billing rate schedule. Northwest will not exceed the total dollar amount of this
Task Order without a signed amendment.
NES billing rate schedule
Hourly Rate
Engineer - PE $ 110.00
Engineer - EI $ 90.00
Drafter $ 60.00
B. Invoicing
The lump sum amount will be invoiced upon submittal of the final report due within 15 days of the
invoice date.
Jones Residence - Limited Geotechnical Report 1 of 4
ARTICLE 4: SCHEDULE
We anticipate submitting the findings report approximately two (2) days after performing the field work.
The schedule may be modified during the execution of the project as agreed to by both parties to this
agreement.
If you have any questions please contact me at (208) 932-2720.
Respectfully,
Chris A. Park, P.E.
NORTHWEST ENGINEERING SERVICES, P.C.
1680 Woodruff Park
Attached: Contract Agreement
Jones Residence - Limited Geotechnical Report 2 of 4
AGREEMENT BETWEEN
JSM CONSTRUCTION
AND
NORTHWEST ENGINEERING SERVICES, P.C.
General Services
THIS AGREEMENT (this "Agreement") is made and effective this _ day of 2016,
by and between JSM CONSTRUCTION ("CLIENT"),
and NORTHWEST ENGINEERING SERVICES. P.C. ("NES"), an Idaho professional corporation
with offices located in Salmon, Idaho; Idaho Falls, Idaho; and Bend, Oregon.
WITNESSETH:
WHEREAS, CLIENT is desires professional services related to Civil Engineering and requires
specialized technical advice and assistance therewith as specified hereinafter; and
WHEREAS, NES represents that it is able, willing, and qualified to render the technical advice and
assistance called for herein:
NOW, THEREFORE, the parties hereto, in consideration of the mutual undertakings and agreements
herein contained, agree as follows:
SECTION 1— SCOPE OF WORK
NES will perform all services as specified in specific TASK ORDERS between the parties included as
Attachments to this Agreement. As additional services are agreed to between the parties, the TASK
ORDERS for those services shall specify the scope of work for said services and be appended to this
contract and will become a part of this contract.
SECTION 2—SCHEDULE
Schedule will be set by NES and client per client needs.
SECTION 3 — COMPENSATION
As consideration for performing the services specified herein, NES shall be paid the sums stipulated and
be reimbursed for expenses incurred in accordance with the Compensation section of the TASK
ORDERS and the NES billing rate schedule which included in Exhibit 1-1 and hereby made a part of
this Agreement for said services provided in Attachments to this Agreement.
SECTION 4 — GENERAL TERMS AND CONDITIONS
This Agreement will be subject to the General Terms and Conditions included in Attachment A. For the
purpose of the General Terms and Conditions, the term "Contract" shall refer to this agreement and its
Attachments.
Jones Residence - Limited Geotechnical Report 3 of 4
SECTION 5 — LEGAL NOTICE
Any and all communication between the parties will be considered as having been legally delivered if
sent to the following addresses:
TO: JSM CONSTRUCTION
626 Sunflower Road
Rexburg, ID 83440
(208) 569-2147
jsmconstruction.inc@gmail.com
TO: NORTHWEST
1680 Woodruff Park
Idaho Falls, ID 83401
(208)932-2720
dsharp@nwengring.com
NG SERVICES, P.C.
or 1680 Woodruff Park
Idaho Falls, ID 83401
(208) 932-2720
cpark@nwengring.com
If either of the parties should change its address, it shall, without delay, communicate the fact to the
other by writing or by fax or by e-mail.
SECTION 6 — LAW OF CONTRACT
This Agreement shall be construed in accordance with the laws of the state of Idaho provided that
nothing contained herein shall be interpreted in such manner as shall render it unenforceable under the
laws of the United States. No action may be brought except in the state of Idaho.
SECTION 7 — EXECUTION
IN WITNESS WHEREOF, the parties hereto have made and executed this Agreement as of the day and
year first above written.
NORTHWEST ENGINEERING SERVICES, P.C.
By:
Name:
Title:
Date:
JSM CONSTRUCTION
By:
Name:
Title:
Date:
Jones Residence - Limited Geotechnical Report 4 of 4
®July
A16-169 Johnson Residence - Limited Geotechnical Report
18, 2016
Jonathan McMullen
JSM Construction, Inc
626 Sunflower Road
RexbuXg,ID 83440
Re: Johnson Residence - Limited Geotechnical Engineering Report
505 S Mill Hollow, Rexburg
In compliance with your instructions, NES has conducted a limited foundation evaluation and visual
slope stability assessment for the above referenced residence. Fieldwork for this investigation was
conducted on July 18, 2016. The proposed residence development is located in the eastern portion of
the City of Rexburg, Madison County, ID, and occupies a portion of the NWYaSEY4 of Section 29,
Township 6 North, Range 40 East, Boise Meridian. Loads of up to 4,000 pounds per lineal foot for wall
footings, and column loads of up to 50,000 pounds were assumed for settlement calculations. Retaining
walls are not anticipated as part of this report.
Authorization
Authorization to perform this exploration and analysis was given in the form of verbal direction from Mr
Jonathan McMullen of JSM Construction, Inc. to Chris Park of Northwest Engineering Services, PC (NES),
on July 15, 2016. Said authorization is subject to terms, conditions, and limitations described in the
Agreement entered into between JSM Construction and NES. Our scope of services for the proposed
development has been provided in our proposal dated July 18, 2016 and repeated below.
Scope of Investigation
The scope of this investigation included a visual assessment of the natural slope and recently excavated
foundation area. Our scope of work did not include physical subsurface exploration, numerical slope
analysis, laboratory testing, pavement design, or earthwork recommendations.
General Site Characteristics
This proposed development consists of approximately 0.3 acres of sloping terrain. Throughout the
majority of the site, surficial soils consist of fine-grained silt -sand mixtures. Vegetation primarily consists
of sagebrush, bunchgrass, and other native grass varieties typical of and to semi -arid environments.
Soil and Sediment Profile
Surficial soil was observed to be sandy silt over naturally and partially exposed native basalt rock. Below
the sandy silt, gray basalt rock was observed which was slightly weathered, widely fractured, and strong.
Northwest Engineering Services
Idaho Falls, ID • Bend, OR • Salmon, ID 1 of 5
A16-169 Johnson Residence - Limited Geotechnical Report
July 18, 2016
Slopes and Setbacks
A visual assessment of the slope was performed to determine possible instability issues relating to the
existing slope, subsurface geology, and proposed structure. The proposed residence is expected to be
constructed at the top of a natural slope with a minimal setback. The steepest part of the slope was
observed near the bottom of the slope to be approximately 4 foot horizontal to 1 feet vertical (4:1). The
general slope was observed to be approximately 6:1. Naturally exposed basalt rock was observed in
places on the lot and down the slope to the east. As discussed earlier, the basalt was found to be
slightly weathered, widely fractured, and strong. Fracture orientation and spacing did not appear to be
detrimental to long-term slope stability (or rock toppling). No evidence of recent rock fall or toppling
was observed. f
Because the basalt was found to be intact, and the proposed structure will be built directly on the basalt
rock, the slope setback requirements as outlined in the IBC can be adjusted to the currently planned
location near the center of the lot. No potential visual slope stability deficiencies were identified during
the investigation. It is noted that shallow footings and/or other structural elements (floor slabs,
landscaping, etc.) should not be constructed on the slope face as the shallow silts are not suitable for
support of loading bearing elements. Infiltration of water into the shallow silts is also prohibited, as this
could lead to surficial slumping with the shallow silts.
Foundation Design Recommendations
Based on data obtained from the site NES recommends the following guidelines for the net allowable
bearing capacity:
Description
Criteria
Foundation type
Conventional shallow spread footings
Bearing material
Footings must bear on competent, intact basalt formations (a
6 -inch separation with sand or aggregate base layer is
required) or compacted structural fill bearing on competent,
intact basalt formations. Existing sandy silt soils, basalt
gravels/fractured basalt, excavatable basalt, and fill materials
(if encountered) must be completely removed from below
foundation elements. Any structural fill required to elevate the
site to proposed footing elevations must be placed in a
controlled and compacted manner as is outlined in the
Structural Fill section of this report.
Net allowable bearing pressure
Intact basalt or compacted structural fill overlying intact basalt:
4,000 pounds per square -foot'
' Net allowable bearing capacity for rock found in the 2012 International Building Code, Table 1806.2.
Northwest Engineering Services
Idaho Falls, ID • Bend, OR • Salmon, ID 2 of 5
ES
A16-169 Johnson Residence - Limited Geotechnical Report
July 18, 2016
Based on our understanding of the project, it is anticipated that portions of the site will bear on
competent, intact basalt rock (with the appropriate sand or aggregate separation layer) while other
portiops of the structure will bear on up to 3 feet of structural fill material. It is likely that differential
settlement will occur in areas where foundations transition from bearing on rock to bearing on fill
material. The total settlement in these areas is still limited to 1 inch, but could primarily be differential
settlement at the transition areas. NES recommends that additional reinforcement be provided in the
transition areas to help mitigate the differential settlement. Objectionable soil types encountered at the
bottom of footing excavations should be removed and replaced with structural fill. Excessively loose or
soft areas that are encountered in the footings subgrade will require over -excavation and backfilling
with structural fill.
Floor. Garage, and Driveway Slab -on -Grade
Organic, loose, or obviously compressive materials must be removed prior to placement of concrete
floors or floor -supporting fill. Areas of excessive yielding should be excavated and backfilled with
structural fill. Fill used to increase the elevation of the floor slab should meet requirements detailed in
the Structural Fill section. Fill materials must be compacted to a minimum 95 percent of the maximum
dry density as determined by ASTM -D1557.
A free -draining granular mat (drainage fill course) should be provided below slabs -on -grade. This should
be a minimum of 4 inches in thickness and properly compacted. The mat should consist of a sand and
gravel mixture, complying with Idaho Standards for Public Works Construction (ISPWC) specifications for
-inch (Type 1) crushed aggregate. A moisture -retarder should be placed beneath floor slabs to
minimize potential ground moisture effects on moisture -sensitive floor coverings. The moisture -
retarder should be at least 15 -mil in thickness and have a permeance of less than 0.01 US perms as
determined by ASTM E96. Placement of the moisture -retarder will require special consideration with
regard to effects on the slab -on -grade and should adhere to recommendations outlined in the ACI
302.111 and ASTM E1745 publications. The granular mat should be compacted to no less than 95
percent of the maximum dry density as determined by ASTM -D1557.
Structural Fill
Soils recommended for use as structural fill are those classified as GW, GP, SW, and SP in accordance
with the Unified Soil Classification System (USCS) (ASTM -D2487). Use of silty soils (USCS designation of
GM, SM, and ML) as structural fill is not acceptable. Recommended granular structural fill materials
should consist of a 6 -inch minus select, clean, granular soil with no more than 50 percent oversize
(greater than %-inch) material and no more than 12 percent fines (passing No. 200 sieve). These fill
materials should be placed in layers not to exceed 12 inches in loose thickness. Prior to placement of
structural fill materials, surfaces must be prepared by removing organic and/or loose materials.
Structural fill material should be moisture conditioned to achieve
mum moisture content
compaction. For structural fill below footings, areas of compacted backfill must extend outside the
perimeter of the footings for a distance equal to the thickness of fill between the bottom of foundation
Northwest Engineering Services
Idaho Falls, ID • Bend, OR • Salmon, ID 3 of 5
A16-169 Johnson Residence - Limited Geotechnical Report
July 18, 2016
and underlying soils, or 5 feet, whichever is less. All fill materials must be monitored during placement
and tested to confirm compaction requirements, outlined below, have been achieved.
Each Iyer of structural fill must be compacted, as outlined below:
• Below Structures and Rigid Pavements: A minimum of 95 percent of the maximum dry density as
determined by ASTM -D1557,
• Below Flexible Pavements: A minimum of 92 percent of the maximum dry density as determined
by ASTM -D1557 or 95 percent of the maximum dry density as determined by ASTM -D698.
The ASTM -D1557 test method must be used for samples containing up to 40 pt-rcent oversize (greater
than %-inch) particles. If material contains more than 40 percent but less than 50 percent oversize
particles, compaction of fill must be confirmed by proof rolling each lift with a 10 -ton vibratory roller (or
equivalent) until the maximum density has been achieved. Density testing must be performed after
each proof rolling pass until the in-place density test results indicate a drop (or no increase) in the dry
density, defined as maximum density or "break over' point. The number of required passes should be
used as the requirements on the remainder of fill placement. Material should contain sufficient fines to
fill void spaces, and must not contain more than 50 percent oversize particles.
Warranty and Limiting Conditions
NES warrants that findings and conclusions contained herein have been formulated in accordance with
generally accepted professional engineering practice in the fields of foundation engineering, soil
mechanics, and engineering geology only for the site and project described in this report. These
engineering methods have been developed to provide the client with information regarding apparent or
potential engineering conditions relating to the site within the scope cited above and are necessarily
limited to conditions observed at the time of the site visit and research. Field observations and research
reported herein are considered sufficient in detail and scope to form a reasonable basis for the purposes
cited above.
Exclusive Use
This report was prepared for exclusive use of the Client. Conclusions and recommendations presented
in this report are based on the agreed-upon scope of work outlined in this report together with the
Agreement between the Client and Northwest Engineering Services, PC ("Consultant'). Use or misuse of
this report, or reliance upon findings hereof, by parties other than the Client is at their own risk. Neither
Client nor Consultant make representation of warranty to such other parties as to accuracy or
completeness of this report or suitability of its use by such other parties for purposes whatsoever,
known or unknown, to Client or Consultant. Neither Client nor Consultant shall have liability to
indemnify or hold harmless third parties for losses incurred by actual or purported use or misuse of this
report. No other warranties are implied or expressed.
Northwest Engineering Services
Idaho Falls, ID • Bend, OR • Salmon, ID 4 of 5