RE: MATTSON APARTMENTS SOUTH
New 5-story student apartment building
for Mattson / Westland Investors
Rexburg, Idaho
Zoning: Mixed Use 2
Construction type: 5A
Sprinklered: Yes
Square footage: 49,649 sf
The attached drawings are submitted in response to Plan Review Comments (dated 11/28/2016) for the
project indicated above.
RESPONSE TO PLAN CHECK COMMENTS - #2
Comment 1: Fire resistance rating of building elements meet the req. of IBC Sect 703, 704
NOTES AND KEYNOTES ARE REVISED TO SHOW 1-HOUR FLOOR CEILING ASSEMBLY PER
CONSTRUCTION TYPE 5A. ADDED AT TOWNHOUSE (2-LEVEL) UNITS, TYPICAL.
• REVISED ON SHEETS A3.1, A3.2, A3.3, A3.4
Comment 2: Ducts and dampers meet the requirements of IBC Section 717
DAMPERS ON EXHAUST FANS SHOWN AND NOTED ON PLANS.
• SEE REVISED MECHANICAL DRAWINGS (ATTACHED) FOR CLARIFICATION.
Comment 3: Toilets, Bathing Fac., Sinks, Kitchen and Drinking Fountain meet IBC Sec. 1109 705
NOTES ADDED FOR RETRACTABLE SWINGING DOORS FOR FORWARD APPROACH AT LOWER
LEVEL TOWNHOUSE LAVATORIES.
• SEE TOWNHOUSE UNIT PLANS, SHEETS A1.10 – A1.16.
Comment 4: Interior Space Dimensions meet the requirements of IBC Section 1208
DIMENSION REQUIREMENTS ADDED/ MODIFIED AT 2-LEVEL UNIT PRIVATE STAIRWAYS FOR
MINIMUM 36” WIDTH AT WINDING STAIR.
• SEE TOWNHOUSE UNIT PLANS, SHEETS A1.10 – A1.16.
3520 N. University Ave Suite 200, Provo, UT 84604 Phone 801.377.6303
www.harris-architecture.com Page 2 of 2
Comment 5: Stairways meet the requirements of IBC Section 1009
SHIPS LADDER PROVIDED FOR ROOF ACCESS PER DISCUSSION AND STANDARDS RECEIVED
FROM FIRE DEPARTMENT.
• SEE STAIR #2 AT UPPER FLOOR PLANS, SHEETS A1.4, A1.5 AND ROOF PLAN SHEET A5.1
Comment 6: Elevators and Conveying Systems meet the requirements of Chapter 30
EQUIPMENT ROOM CEILING EDITED FOR 2-HOUR PROTECTION.
• SEE SECTION B/A3.2
• SEE REVISED MECHANICAL DRAWINGS (ATTACHED) FOR HOISTWAY VENTILATION.
ADDITIONAL INSPECTOR COMMENTS - #2
Comment A: Interior bearing wall headers
SEE STRUCTURAL NOTES REGARDING STRUCTURAL CONTINUITY AT DUCT (ETC.)
PENETRATIONS AT BEARING WALL HEADERS.
Comment B: Emergency egress windows
WINDOWS MEETING REQUIREMENTS FOR EMERGENCY EGRESS ARE PROVIDED AT EACH
SLEEPING ROOM. SEE WINDOW DETAILS, SHEETS A4.0, A4.1
Comment C: Mechanical closet doors
CLOSER AND SEAL ADDED FOR DOORS TO MECHANICAL CLOSETS FROM BATHROOMS. SEE
UNIT DOOR SCHEDULE, SHEET A4.1
Comment D: Protection for Shower valves in rated walls
NOTES INDICATE REQUIREMENT TO MAINTAIN FIRE RATING AROUND SHOWER VALVES IN
RATED WALLS. DETAILS ARE ALSO PROVIDED FOR VARIOUS CONDITIONS THAT MAY OCCUR.
Comment: Separation at existing building
SEPARATION BETWEEN AN EXISTING STRUCTURE AND THE PROPOSED BUILDING IS
BETWEEN 5 – 10 FEET. PROTECTION IS PROVIDED AT THE NEW BUILDING; NOTES ARE
ADDED FOR INSTALLATION OF RATED WALLS AND PROTECTED OPENINGS AT THE EXISTING
BUILDING. SEE SHEET A0.1
Thank you for your continued help on with this project. We look forward to working closely with the
City to successfully complete the Mattson Apartments project.