Loading...
HomeMy WebLinkAboutPLAN REVIEW ELECTRICAL 9-19-16 - 16-00614 - Henry's Fork - Office Space BuildoutNorth Fork Dental - Office Space Buildout Plumbing ReviewReview Date: 09/12/2016 Permit Number: 16-00614 Reviewed By: Don Allen Current Plumbing Review Status: APPW/COND D ESCRIPTIO N CO MMEN TS STATUS Additional Inspector Comments: Will look at the plumbing at the ground work, rough in, and final will make any changes at that time. Will look at the mechanical at the ground work, rough in, and final will make any changes at that time. North Fork Dental - Office Space Buildout HVAC ReviewReview Date: 09/12/2016 Permit Number: 16-00614 Reviewed By: Don Allen Current HVAC Review Status: APPW/COND D ESCRIPTIO N CO MMEN TS STATUS Additional Inspector Comments: Will look at the plumbing at the ground work, rough in, and final will make any changes at that time. Will look at the mechanical at the ground work, rough in, and final will make any changes at that time. North Fork Dental - Office Space Buildout Electrical ReviewReview Date: 09/19/2016 Permit Number: 16-00614 Reviewed By: Bret Stoddard Current Electrical Review Status: REVISIONS D ESCRIPTIO N CO MMEN TS STATUS Electrical: Service No change is noted on plans for the electrical service. COMPLETED Electrical: Wiring Method Must verify with the owner that there is not going to be any patient care administered in this space-the wiring method is determined by the use. REVISIONS Electrical: Exit Signs/Emergency Lighting Will verify placement of any required emergency or exit signage on site at rough-in. COMPLETED Electrical: Energy Compliance Report Submitted All spaces with more than one luminaire must have bi-level switching-each office space. COMPLETED