Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
COMCHECK - 16-00614 - Henry's Fork - Office Space Buildout
COMlchec& Software Version COMcheck-Web Envelope Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: Building Area 2012 IECC Henry's Fork Suite Tenant Improvement Rexburg, Idaho 6b Alteration Owner/Agent: Floor Area 1 -Office : Nonresidential 1500 Envelope Assemblies Designer/Contractor: R -Value Proposed Max. Allowed Post -Alteration Assembly Cavity Cont. tJ-Factor SHGC U -Factor SHGC Roof: Attic Roof, Wood Joists, [Bldg. Use t - Office] 50.0 50.0 0.010 --- 0.021 Ext. Wall: Wood -Framed, 161n, o.c., [Bldg, Use 1 -Office], --- --- --- --- --- Exemption: Framing cavity filled with insulation. Door: , Entrance Door, Entrance Door, [Bldg. Use 1 - Office], --- --- --- --- --- Exemption: Glazing replacement in existing sash or frame. Floor: Wood -Framed, [Bldg. Use 1 - Office], Exemption: Framing ___ ___ _ cavity not exposed. Project Notes Tenant Improvement for Offices Envelope Compliance Statement Compliance Statement, The proposed envelope alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2012 IECC requirements M COMcheck Version COMcheck-Web and to comply with the mandatory requirements listed in the Inspection Checklist. Name -Title rre Dat Project Title: Henry's Fork Suite Tenant Improvement Report: date: 09/07/16 Data filename: Page 1 of 18 �oCOMcheck Software Version COMcheck-Web Interior Lighting Compliance Certificate Project information Energy Code: Project Title'. Project Type: Construction Site: Allowed Interior lighting Power 2012 IECC Henry's Fork Suite Tenant Improvement Alteration Owner/Agent: Designer/Contractor: A s C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 1 -Common Space Types:Office - Enclosed 1500 1.10 1650 Total Allowed Watts = 1650 Proposed Interior Lighting Power A 8 C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast tamps/ # of Fixture (C X D) Fixture Fixture Watt. Common Space Types: Office - Enclosed (15 -ft.) LEO: LED Other Fixture Unit 6.5W: Interior Lighting Compliance Statement 1 30 6 195 Total Proposed Watts = 195 Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version COMcheck-Web and to comply with the mandatory requirements listed in the Inspection Checklist. Project Title: Henry's Fork Suite Tenant Improvement Report date: 09/07/16 Data filename: Page 2 of 18 COMcheck Software Version COMcheck-Web Exterior Lighting Compliance Certificate Project Information Energy Code: Project Title. Project Type: Exterior Lighting Zone Construction Site: Allowed Exterior Lighting Power A Area/Surtace Category 2012 IECC Henry's Forks Suite Tenant Improvement Alteration 3 (Other) Owner/Agent: B Quantity Designer/Contractor: C D E Allowed Tradable Allowed Watts Watts / Wattage (B X C) Main entry 1 ft of door 30 Yes 30 Total Tradable Watts (a) = 30 Total Allowed Watts = 30 Total Allowed Supplemental Watts (b) = 750 (a) Wattage tradeoffs are only allowed between tradable areas/surfaces. (b) A supplemental allowance equal to 750 watts may be applied toward compliance of both non -tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. Main entry (1 ft of doter wdthtJradable -Watt= LED: LED Other Fixture Unit 6.5W: 1 1 6 6 Total Tradable Proposed Watts = 6 Exterior Lighting Compliance Statement Compliance Statement. The proposed exterior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version COMcheck-Web and to comply with the mandatory requirements fisted in the Inspection Checklist, Project Title: Henry's Fork Suite Tenant Improvement Report date: 09/07/16 Data filename: Page 3 of 1S . COMcheck Software Version COMcheck-Web Mechanical Compliance Certificate Project Information Energy Code: 2012 IECC Project Title: Henry's Fork Suite Tenant Improvement Location: Rexburg, Idaho Climate Zone: 61b Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: Mechanical Systems List Quantity System Type & Description I HVAC System (SPng?e Zone): Heating: 1 each - Central Furnace, Gas, Capacity Unknown Proposed Efficiency= 96.00% Et, Required Efficiency = 80.00% Et Cooling: 1 each - Single Package Vertical AC Unit, Capacity Unknown, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 94.00 EER, Required Efficiency = 9.00 EER I Water Heater: Electric Storage Water Heater, Capacity: 0 gallons No minimum efficiency requirement applies Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2012 IECC requirements in COMcheck Version COMcheck-Web and to comply with the mandatory requirements listed in the Inspection Checklist, Project Title: Henry's Fork Suite Tenant improvement Report date: 09/07/16 Data filename: Page 4 of 18 COMcheck Software Version COMcheck-Web Inspection Checklist Energy Code: 2012 IECC Requirements: 31.0% were addressed directly in the COMcheck software Text in the "CommentslAssumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section` # Plan Review Carnpiies? Comments/Assumptions & Req.10 0103.2 Plans and/or specifications provide all :❑Complies Requirement will be met. [PR111 information with which compliance ❑Does Not ,can be determined for the building ❑Not Observable envelope and document where []Not Applicable exceptions to the standard are claimed. C103.2 Plans, specifications, and/or ❑Complies [PR2]1 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the mechanical ❑Not Applicable systems and equipment and document where exceptions to the .standard are claimed. Load calculations per acceptable engineering standards and handbooks. 0103.2 Plans, specifications, and/or ❑Complies [PR311 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the service water ❑Not Applicable heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. C103.2 Plans, specifications, and/or :❑Complies [PR4]1 calculations provide all information ❑Does Not with which compliance can be tlNot Observable. determined for the interior lighting and electrical systems and equipment ❑Not Applicable , and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. C103.2 Plans, specifications, and/or ❑Complies jPR8]1 calculations provide all information '❑Does Not with which compliance can be [jNot Observable determined for the exterior lighting and electrical systems and equipment °❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of.. bulbs and ballasts, transformers and control devices. C402.3.1 The vertical fenestration area <= 30 ❑Complies Requirement will be met. [PR1011 percent of the gross above -grade wall ❑Does Not area. ❑Not Observable []Not Applicable 1 Hlgh Impact (tier 1) 2`' Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Henry's Fork Suite Tenant Improvement Report date: 09/07/16 Data filename: Page 5 of 18 section . # Plan Review compiler.? &: Req.10 C402.3.1 :The skylight area c= 3 percent of the '❑Complies [PR11}1 gross roof area. ❑Does Not °❑Not Observable ❑Not Applicable C402.3.2. Skylights in office, storage, ;[]Complies 2 automotive service, manufacturing, ❑Does Not [PR15}1 non -refrigerated warehouse, retail '❑Not Observable store, and distribution/sorting area ❑Not Applicable have a measured haze value a 90 percent unless designed to exclude direct sunlight. Additional Comments/Assumptions: Comments/Assumptions Requirement will be met. Requirement will be met. 1 High Impact (Tier 1) 2.'I Medium Impact (Tier 2) 1 3 I Low Impact {Tier 3} Project Title: Henry's Fork suite Tenant Improvement Report date: 09/07/16 Data filename: Page 6 of 18 Section #. Footing'/ Foundation [inspection Compiles?. Comments/Assumptions &: Req.f© . 0403.2.8. : Exterior insulation protected against UComplies Requirement will be met. 1 damage, sunlight, moisture, wind, ❑Does Not [F06]1 -landscaping and equipment ;Not Observable maintenance activities. ❑Not Applicable 0403 2.4.. Freeze protection and snow/ice :❑Complies 5:: melting system sensors for future ❑Does Not [F09]3 connection to controls. '❑Not Observable ❑Not Applicable C402.2.8 ' Bottom surface of floor structures ❑Complies Requirement will be met. [F01213. --`' incorporating radiant heating ❑Does Not insulated to >=R-3.5. ©Not Observable See the Envelope Assemblies table for values. °❑Not Applicable Additional Comments/Assumptions: 1 I High impact (Tier 1)Impact (Ter 2) 3 i ow Impact (Tier 3) Project Title: Henry's Fork Suite Tenant improvement Data filename: Report date: 09/07/16 Page 7 of 18 Section # Froming /Rough-ln lnspection. Complies? Comments/Assumptions C402.4.1, ;The building envelope contains a ❑Complies Requirement will be met. C402.4.2 continuous air barrier that is sealed in❑Does Not [FR1611 an approved manner and either Observable constructed or tested in an approved :❑Not ❑Not Applicable manner. Air barrier penetrations are sealed in an approved manner. C402.4.3, ' Factory -built fenestration and doors ❑Complies Requirement will be met. (40214.4 =' are labeled as meeting air leakage ❑Does Not 01.813 'requirements. ❑Not Observable. ❑Not Applicable (40214-7 :';Vestibules are installed on all building ❑Complies Requirement will be met. [FR17]3 entrances. Doors have self-closing ❑Does Not devices. :[]Not Observable' ❑Not Applicable C402.3.3, 'Vertical fenestration U -Factor. ❑Complies See the Envelope Assemblies table for values. C4023.4 ',❑Does Not [FR8]1 ;❑Not Observable ❑Not Applicable C4023.3 Vertical fenestration SHGC value. :❑Complies See the Envelope Assemblies table for values. [FR10]' ❑Does Not ❑Not Observable . '❑Not Applicable C303.1.1. Fenestration products rated in ❑Complies Requirement will be met. [FR12]z <.;accordance with NFRC. ❑Does Not ❑Nat Observable ❑Not Applicable C303.1.3 ' Fenestration products are certified as ;❑Complies Requirement will be met. [FR1311 to performance labels or certificates ❑Does Not provided. ©Not Observable' ❑Not Applicable C40.22.1.: U -factor of opaque doors associated ❑Complies See the. Envelope Assemblies table for values. [FR1417 ' with the building thermal envelope ❑Does Not meets requirements. ;❑Not Observable: ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) ;2.J Medium Impact (Tier 2) 3 Law Impact (Tier 3) Project Title: Henry's Fork Suite Tenant Improvement Report date: 09/07/16 Data filename: Page 8 of 18 section # Plumbing (tough- n Inspection Complies? Comments/Assumptions & Re .1D C4043 Temperature controls installed on ;❑Complies [PL5]3 service water heating systems (110 F '❑Does Not for dwelling units and lavatories in ❑Not Observable public restrooms and 90 F for other ❑Not Applicable occupancies.) C464.2.:,' . Heat traps installed on non -circulating ',❑Complies [PL4)3 storage water tanks. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1.1 JHigh Impact {Tier 1) 2: Medium Impact (Tier 2) 18'1 Low Impact (Tier 3) Project Title: Henry's Fork suite Tenant Improvement Report date: 09/07/16 Data filename: Page 9 of 18 Section # Mechanical Rough-in inspection . Complies?. CommentsfAssumptlons & Re tID C403.2 3 HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values. [ME551z ❑Does Not ❑Not Observable ❑Not Applicable C402.4.5... Stair and elevator shaft vents have ❑Complies Requirement will be met. I e motorized dampers that automatically '❑DoesNot [ME313 close. ❑Not Observable ❑Nat Applicable C402 4.5:: 'Outdoor air and exhaust systems have ;[]Complies Requirement will be met. 2 motorized dampers that automatically `❑Does Not [ME5813 :: shut when not in use and meet ©Not Observable .:maximum leakage rates. Check ❑Not Applicable gravity dampers where allowed. C403.2.5. 1Demand control ventilation provided❑Complies 1 for spaces X500 sq.ft, and X25 '❑Does Not [ME5911 people/1000 sq -ft. occupant density ❑Not Observable and served by systems with air side ❑Not Applicable economizer, auto modulating outside air damper control, or design airflow n3,000 cfm. C403 2.7. MVAC ducts and plenums insulated. '❑Complies [ME601z :;'=Where ducts or plenums are installed =❑Does Not in or under a slab, verification may -]Not Observable need to occur during foundation ❑Not Applicable Inspection. 0403 28 Piping Insulation exposed to weather -❑Complies 1 is protected from damage (due to sun, >❑Does Not [1%1E713 moisture, wind, etc.). ;❑Nat Observable ❑Not Applicable G403 2.8': ;Thermally ineffective panel surfaces of❑Complies [ME41]3 -'_ :sensible heating panels have ❑Does Not insulation >= R-3.5. '❑Not Observable []Not Applicable C40312.7 , ` Ducts and plenums sealed based on ❑Complies E.ME1012 -:static pressure and location. []Does Not ❑Not Observable ❑Not Applicable C403.2.3. Ductwork operating >3 in. water ❑Complies Requirement will be met. 1:3 column requires air leakage testing. []Does Not [MEll 13 .❑Nat Observable ❑Not Applicable C40$ 2:2, 'Air outlets and zone terminal devices ❑Complies 1. have means for air balancing, '❑Does Not [ME5313 -]Not Observable ❑Not Applicable C403.4.2 :VAV fan motors >7.5 hp to be driven '.❑Complies 12.by variable speed drive, have a vane- ❑Does Not axial fan with variable pitch blades, or Observable have controls to limit fan motor❑Not ❑Not Applicable demand. C403.4.2_ VAV fan motors >=7.5 hp to be driven '❑Complies [ME5612 ;' by variable speed drive, have a vane ❑Does Not axial fan with variable pitch blades, or ❑Nat Observable. have controls to limit fan motor °❑Not Applicable demand. 1 High impact Crier 1} 2 'Medium impact Wier 2) 3 . Low Impact (Tier 31 Project Title: Henry's Fork Suite Tenant Improvement Report date: 09/07/16 Data filename: Page 10 of 18 C403.2.11. Unenclosed spaces that are heated ;UComplies [ME71]2 use only radiant heat. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High impact (Tier 1) 2 Medium impact (Tier 2} 13 1 Low impact (Tier 3) Project Title: Henry's Fork Suite Tenant Improvement Report date: 09/07/16 Data filename: Page 11 of 18 Section # -Rough-In Electrical inspection. Complies? Comments/Assumptions Reg.. 10 C405:2.2 Automatic controls to shut off all ❑Complies 1 building lighting installed in all ❑Does Not [EMP, buildings. ❑Not Observable ❑Not Applicable C405.23. Independent lighting controls installed `❑Complies per approved lighting plans and all ❑Does Not [EL2312 manual controls readily accessible and ❑Not Observable. visible to occupants. ❑Not Applicable C405.2.1. Lighting controls installed to uniformly ❑Complies 2 reduce the lighting load by at least ❑Does Not i; E L1511 50%. ©Not Observable ❑Not Applicable C405 2.2 `, Daylight zones provided with ❑Complies 3; individual controls that control the ❑Does Not [EL1612 ` ;lights independent of general area ❑Not Observable lighting. ❑Not Applicable C405.23 ;Sleeping units have at least one ❑Complies [.EL17]3 ° master switch at the main entry door :❑Does Not that controls wired luminaires and ❑Not Observable switched receptacles. ❑Not Applicable C405.2.2. :Occupancy sensors installed in ❑Complies 2 required spaces. ❑Does Not [EL1811 []Not Observable ❑Not Applicable C405.2.2. Primary sidelighted areas are ❑Complies 3 equipped with required lighting ❑Does Not [EL2011 Controls. ❑Not Observable °❑Not Applicable C405.2.2. ' Enclosed spaces with daylight area❑Complies 3 under skylights and rooftop monitors "❑Does Not [EL21]7- are equipped with required lighting '❑Not Observable controls. '❑Not Applicable C40572.4 ::Automatic lighting controls for exterior ❑Complies lighting installed. ❑Does Not []Not Observable ❑Not Applicable C405.23 Separate lighting control devices for ❑Complies [EL4]1 specific uses installed per approved ❑Does Not lighting plans. ❑Not observable ❑Nat Applicable C40.5.3.. Fluorescent luminaires with odd ❑Complies tE19]3 - : numbered lamp configurations that ❑does Not are within 10 feet center to center (if ❑Not Observable recess mounted) ar are within i foal ❑Not Applicable edge to edge (if pendant or surface mounted) shall be tandem wired. C405.4 Exit signs do not exceed 5 watts per ❑Complies [EL611 face. ❑Does Not ❑Not Observable ❑Nat Applicable 1 lHigh Impact (Tier 1) 2.1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: Henry's Fork Suite Tenant Improvement Report date: 09/07/16 Data filename: Page 12 of 18 section _ # Rough In Electrical Inspection coniios? Comments/Assumptions & ;Req,ID 0405.6 Exterior grounds lighting over 100 W ;❑Complies [EL24]1 provides X60 Im/W unless on motion ❑Does Not sensor or fixture is exempt from scope ❑Not Observable' of code or from external LPO. `E]Not Applicable C405.2.3 :Additional interior lighting power ;❑Complies [ELB]x allowed for special functions per the ❑Does Not approved lighting plans and is ❑Not Observable automatically controlled and separated from general lighting. ❑Not Applicable Additional Comments/Assumptions: 1. i High Impact (Ter I) 1 Medium impact (Tier 2) 1. 3 Low Impact {Tier 3) Project Title: Henry's Fork Suite Tenant Improvement Report date: 09/07/26 Data filename: Page 13 of 18 Section # Insulation Inspection Complies? Comments/Assumptions C402.4.1. All sources of air leakage in the ']Complies Requirement will be met. 1 building thermal envelope are sealed, ❑Does Not [IN111 caulked, Basketed, weather stripped INot Observable or wrapped with moisture vapor - Applicable permeable wrapping material to ;❑Not minimize air leakage. C402.4.2. `Roof R -value. For some ceiling ❑Complies See the Envelope Assemblies table far values. 1 systems, verification may need to ❑Does Not [IN2)1 occur during Framing Inspection. ',❑Not Observable. ❑Not Applicable C303.2 Roof insulation installed per ©Complies Requirement will be met. [IN311 manufacturer's instructions. Blown or '❑Does Not poured loose -fill insulation is installed .©Not Observable only where the roof slope is <=3 in °❑Not Applicable 12. C303.2 :Above -grade wall insulation installed ❑Complies Requirement will be met. [IN711 per manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable 0402 2 5 Floor insulation R -value. ❑Complies See the Envelope Assemblies table for values. �IN8)z ❑Does Not UNot Observable ❑Not Applicable 301:21. =,'=Floor insulation installed per ❑Complies Requirement will be met. [ilV91? manufacturer's instructions. ❑Does Not :❑Not Observable -❑Not Applicable C303 1 Building envelope insulation is labeled ;❑Complies :Requirement will be met. {fNi012' `,°with R -value or insulation certificate❑Does Not U R -value and other relevant ❑Not Observable data. ❑Not Applicable C.502.1 ' %E=xterior insulation is protected from ❑Complies Requirement will be met. [IN1412_ :':.`damage with a protective material. -]Does Not Verification for exposed foundation ;❑Not Observable Insulation may need to occur during ❑Not Applicable `Foundation Inspection. C4024,1. Insulation intended to meet the roof EIComplies . Requirement will be met. [IN1713 insulation requirements cannot be ;❑Does Not installed on top of a suspended -]Not Observable' ceiling. Mark this requirement ❑Not Applicable compliant if insulation is installed accordingly. Additional Comments/Assumptions: I High Impact (Tier 1) , 2 I Medium Impact (Tier 2) :3 : Low Impact (Tier 3) Project Title. Henry's Fork Suite Tenant Improvement Report date: 09/07/15 Data filename: Page 14 of 18 Section # Fina! nSpection Complies? Comments/Assumptions &. ReWD C402.4.8 ' Recessed luminaires in thermal []Complies Requirement will be met. [F126]3 envelope to limit infiltration and be IC []Does Not rated and labeled. Seal between ❑Not Observable interior finish and luminaire housing. ❑Not Applicable C403,2.2 : HVAC systems and equipment ❑Complies [F127]3 =capacity does not exceed calculated ❑Does Not loads. ❑Not Observable ❑Not Applicable ,00.8.2.5..`' Furnished as -built drawings for ❑Complies 1 electric power systems within 30 days❑Does Not 7116j3 of system acceptance.❑ ; Nat Observable ❑Not Applicable C303.3,.:.,.: Furnished O&M instructions for ;❑Complies C408,25. systems and equipment to the ❑Does Not 2 [F117] s building owner or designated representative. ❑Not Observable. ]Not Applicable 0405.5.2 Interior installed lamp and fixture :❑Complies See the Interior Lighting fixture schedule for values. [FI1811 lighting power is consistent with what ODoes Not ..is shown on the approved lighting -❑Nat Observable plans, demonstrating proposed watts ❑Not Applicable are less than or equal to allowed watts. C405.6.2 ` Exterior lighting power is consistent ❑Complies Seethe Interior lighting fixture schedule for values. [F]19]1 with what is shown on the approved ❑Does Not lighting plans, demonstrating T. ©Not Observable proposed watts are less than or equal ❑Not Applicable to allowed watts. 0408.2.1 Commissioning plan developed by ❑Complies [F128]1 'registered design professional or ..❑Does Not approved agency. ❑Not Observable ❑Not Applicable C408.2.4 Preliminary commissioning report ❑Complies [F12911 completed and certified by registered .❑Does Not design professional or approved ❑Not Observable agency. ❑Not Applicable ,408.2.5. ' Final commissioning report due to ❑Complies 4 building owner within 90 days of ❑Does Not [F13011 receipt of certificate of occupancy. °❑Not Observable :❑Not Applicable C408.2.3. HVAC equipment has been tested to '❑Complies 1 ensure proper operation. ❑Does Not [F13I]1 ❑Not Observable ❑Nat Applicable C408.3 Lighting systems have been tested to °❑Complies [F13311 ensure proper calibration, adjustment, ❑Does Not programming, and operation. ❑Not Observable. ❑Not Applicable C408.3 Lighting systems have been tested to :❑Complies [F148]1 ensure proper calibration, adjustment, :❑Does Not ;programming, and operation. ❑Not Observable 1 ❑Not Applicable 111 High Impact (Tier 1) ;4;`1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Henry's Fork Suite Tenant Improvement Report date: 09/07/16 Data filename: Page 16 of 18 Additional Comments/Assumptions: 1 I High Impact (Tier 1) > Medium Impact (Tier 2) 3, 1 Low Impact (Tier 3) Project Title: Henry's Fork suite Tenant Improvement Report date: 09/47/16 Data filename: Page 17 of 18 Project Title: Henry's Fork Sulte Tenant Improvement Report date: 09/07/16 Data filename: Page 18 of 18