Loading...
HomeMy WebLinkAboutPLANS 1 - 17-00267 - 480 S 1st W - Somerset Lounge Remodel(2) 5/6" LAGS 'GS EXISTING FLOOR FRAMING - WI 6" EMBmMENT INTO EAM DMENT WIDTH :" L'c6a THAN POET SIZE4" HIN. FLObH WITH TOP OF CONC.FETE q„ (31164%6X1/< BENT j ENT PLATE314EB" e I" DIA.X6' LONG BOLTPOST 6X6 HIN(2) 1I 311 5/6" A3 l BOLT PosT s¢e30T s°Lis KNIFE PLATE DETAIL 011" WASHERS AND HUTS WHO WI I" WASHERS AND M1T6 3 TO 311 X11 POST POET BEAM POST TO BEAM I/4' KNEE PLATE 3r4' �II Of Q V A301 BOLI (x) Reop z _ MIN 6(' TOP OF I 5 $IHP$ON POST BASE SIZED FOOTING TO SOIL � FOR POST ALSO ACCEPTABLE I I S I I SOIL 2X PT BOTTOM PLATE FTG SCHEDULE INTERIOR FOOTING DETAIL -REMOVE EXISTING WALL AND REPLACE WITH BEAM BEAM SCHEDULE WBI • (1) DF •1 6XIO OR (2) 1.15X9.25 LVL OR 5.125X9 GLB (24F -V4) POST SCHEDULE PI,P2 • DF 'I 6X6 FOOTING SCHEDULE FI - 3OX3OXI2 FTG WITH (4) '4 EACH WAY F2 • 21%21X@ FTG WITH (3)'4 EACH WAY LEGEND I� ■ STRUCTURAL POST ( MAIN FLOOR FRAMING 1,911. ,�"011 April 18, 2011 - EXISTING FLOOR FRAMING - 1I 311 � I G - J�II J,I 3 311 X11 IFI I �II Of z I 5 NII X11 � I I S I I I m 11 I 1I bm I I 1I y Itl I1 I FTG SCHEDULE INTERIOR FOOTING DETAIL -REMOVE EXISTING WALL AND REPLACE WITH BEAM BEAM SCHEDULE WBI • (1) DF •1 6XIO OR (2) 1.15X9.25 LVL OR 5.125X9 GLB (24F -V4) POST SCHEDULE PI,P2 • DF 'I 6X6 FOOTING SCHEDULE FI - 3OX3OXI2 FTG WITH (4) '4 EACH WAY F2 • 21%21X@ FTG WITH (3)'4 EACH WAY LEGEND I� ■ STRUCTURAL POST ( MAIN FLOOR FRAMING 1,911. ,�"011 April 18, 2011