HomeMy WebLinkAboutINSPECTION SUMMARY - 16-00496 - Storage Building for Field - ConsultationPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 07/14/2017 10:49 am
Permit Details Permit Number: 16-00496
Storage Building for Field - Consultation
New Junior High
Consultation case
Permit Issued Date:
Permit Inspection Statistics
Total Inspections Completed:
Total Inspections Passed:
Inspection Pass Rate
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
07/18/2016PARTCOMPLYQuinton OwensBuilding Inspector Consultation
PERMIT REQUIRED TO CONTINUE WORK.
Fastener spacing on sheathing too far. Add staples for 3-4" spacing at edges and
6" field spacing.
Add blocking on joints in corners for 4 ft min. and on each side of overhead doors
(sheathing must be nailed to blocking)
Building wrap will be required unless exempted by siding manufacturer's listing.
Inspector Comments:
Electrical Inspection Type
07/18/2016NONCOMPLYBret StoddardElectrical Inspector Consultation