Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 16-00496 - Storage Building for Field - ConsultationPermit Inspection Summary Permit Status of (Open) as of Report Date: 07/14/2017 10:49 am Permit Details Permit Number: 16-00496 Storage Building for Field - Consultation New Junior High Consultation case Permit Issued Date: Permit Inspection Statistics Total Inspections Completed: Total Inspections Passed: Inspection Pass Rate Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 07/18/2016PARTCOMPLYQuinton OwensBuilding Inspector Consultation PERMIT REQUIRED TO CONTINUE WORK. Fastener spacing on sheathing too far. Add staples for 3-4" spacing at edges and 6" field spacing. Add blocking on joints in corners for 4 ft min. and on each side of overhead doors (sheathing must be nailed to blocking) Building wrap will be required unless exempted by siding manufacturer's listing. Inspector Comments: Electrical Inspection Type 07/18/2016NONCOMPLYBret StoddardElectrical Inspector Consultation